EP3206264 - CONNECTOR ASSEMBLY WITH IDENTIFICATION FEATURE [Right-click to bookmark this link] | |||
Former [2017/33] | CONNECTOR POSITION ASSURANCE WITH IDENTIFICATION FEATURE | ||
[2021/11] | Status | No opposition filed within time limit Status updated on 10.06.2022 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 02.07.2021 | ||
Former | Grant of patent is intended Status updated on 25.02.2021 | ||
Former | Examination is in progress Status updated on 06.04.2018 | ||
Former | Request for examination was made Status updated on 23.02.2018 | ||
Former | The application has been published Status updated on 14.07.2017 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Yazaki North America, Inc. 6801 Haggerty Road Canton Michigan 48187 / US | [2017/33] | Inventor(s) | 01 /
EXENBERGER, Richard Joseph 9116 Oakview Street Plymouth, MI 48170 / US | 02 /
WAGNER, Brian L. 7361 Madeline Court Ypsilanti, MI 48197 / US | [2017/33] | Representative(s) | Barker Brettell LLP 100 Hagley Road Edgbaston Birmingham B16 8QQ / GB | [2021/31] |
Former [2017/33] | Lawrence, John Barker Brettell LLP 100 Hagley Road Edgbaston Birmingham B16 8QQ / GB | Application number, filing date | 17155307.6 | 08.02.2017 | [2017/33] | Priority number, date | US201615040716 | 10.02.2016 Original published format: US201615040716 | [2017/33] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3206264 | Date: | 16.08.2017 | Language: | EN | [2017/33] | Type: | B1 Patent specification | No.: | EP3206264 | Date: | 04.08.2021 | Language: | EN | [2021/31] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 08.06.2017 | Classification | IPC: | H01R13/629, H01R13/639, H01R13/46, // G06K19/06 | [2021/11] | CPC: |
H01R13/6295 (EP,US);
H01R13/62977 (US);
H01R13/465 (EP);
H01R13/62955 (EP,US);
H01R13/639 (EP,US);
H01R13/641 (US);
|
Former IPC [2017/33] | H01R13/629, H01R13/639, // G06K19/06 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/13] |
Former [2017/33] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | STECKERMONTAGE MIT IDENTIFIKATIONSMERKMAL | [2021/11] | English: | CONNECTOR ASSEMBLY WITH IDENTIFICATION FEATURE | [2021/11] | French: | ASSEMBLAGE DE CONNECTEURS AVEC CARACTÉRISTIQUE D'IDENTIFICATION | [2021/11] |
Former [2017/33] | VERBINDERPOSITIONSSICHERUNG MIT IDENTIFIKATIONSMERKMAL | ||
Former [2017/33] | CONNECTOR POSITION ASSURANCE WITH IDENTIFICATION FEATURE | ||
Former [2017/33] | ASSURANCE DE POSITION DE CONNECTEUR AVEC FONCTION D'IDENTIFICATION | Examination procedure | 08.02.2017 | Date on which the examining division has become responsible | 15.02.2018 | Amendment by applicant (claims and/or description) | 15.02.2018 | Examination requested [2018/13] | 10.04.2018 | Despatch of a communication from the examining division (Time limit: M04) | 13.08.2018 | Reply to a communication from the examining division | 20.11.2018 | Despatch of a communication from the examining division (Time limit: M04) | 29.03.2019 | Reply to a communication from the examining division | 21.02.2020 | Despatch of a communication from the examining division (Time limit: M04) | 30.06.2020 | Reply to a communication from the examining division | 26.02.2021 | Communication of intention to grant the patent | 28.06.2021 | Fee for grant paid | 28.06.2021 | Fee for publishing/printing paid | 28.06.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 06.05.2022 | No opposition filed within time limit [2022/28] | Fees paid | Renewal fee | 13.02.2019 | Renewal fee patent year 03 | 28.02.2020 | Renewal fee patent year 04 | 25.02.2021 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 08.02.2017 | AL | 04.08.2021 | AT | 04.08.2021 | CY | 04.08.2021 | CZ | 04.08.2021 | DK | 04.08.2021 | EE | 04.08.2021 | ES | 04.08.2021 | FI | 04.08.2021 | HR | 04.08.2021 | IT | 04.08.2021 | LT | 04.08.2021 | LV | 04.08.2021 | MC | 04.08.2021 | MK | 04.08.2021 | MT | 04.08.2021 | NL | 04.08.2021 | PL | 04.08.2021 | RO | 04.08.2021 | RS | 04.08.2021 | SE | 04.08.2021 | SI | 04.08.2021 | SK | 04.08.2021 | SM | 04.08.2021 | TR | 04.08.2021 | BG | 04.11.2021 | NO | 04.11.2021 | GR | 05.11.2021 | IS | 04.12.2021 | PT | 06.12.2021 | GB | 08.02.2022 | IE | 08.02.2022 | LU | 08.02.2022 | BE | 28.02.2022 | CH | 28.02.2022 | FR | 28.02.2022 | LI | 28.02.2022 | [2024/42] |
Former [2024/29] | HU | 08.02.2017 | |
AL | 04.08.2021 | ||
AT | 04.08.2021 | ||
CY | 04.08.2021 | ||
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
IT | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
MC | 04.08.2021 | ||
MK | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SI | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
TR | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
GB | 08.02.2022 | ||
IE | 08.02.2022 | ||
LU | 08.02.2022 | ||
BE | 28.02.2022 | ||
CH | 28.02.2022 | ||
FR | 28.02.2022 | ||
LI | 28.02.2022 | ||
Former [2024/22] | HU | 08.02.2017 | |
AL | 04.08.2021 | ||
AT | 04.08.2021 | ||
CY | 04.08.2021 | ||
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
IT | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
MC | 04.08.2021 | ||
MK | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SI | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
GB | 08.02.2022 | ||
IE | 08.02.2022 | ||
LU | 08.02.2022 | ||
BE | 28.02.2022 | ||
CH | 28.02.2022 | ||
FR | 28.02.2022 | ||
LI | 28.02.2022 | ||
Former [2024/20] | HU | 08.02.2017 | |
AL | 04.08.2021 | ||
AT | 04.08.2021 | ||
CY | 04.08.2021 | ||
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
IT | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
MC | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SI | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
GB | 08.02.2022 | ||
IE | 08.02.2022 | ||
LU | 08.02.2022 | ||
BE | 28.02.2022 | ||
CH | 28.02.2022 | ||
FR | 28.02.2022 | ||
LI | 28.02.2022 | ||
Former [2024/18] | HU | 08.02.2017 | |
AL | 04.08.2021 | ||
AT | 04.08.2021 | ||
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
IT | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
MC | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SI | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
GB | 08.02.2022 | ||
IE | 08.02.2022 | ||
LU | 08.02.2022 | ||
BE | 28.02.2022 | ||
CH | 28.02.2022 | ||
FR | 28.02.2022 | ||
LI | 28.02.2022 | ||
Former [2023/10] | AL | 04.08.2021 | |
AT | 04.08.2021 | ||
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
IT | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
MC | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SI | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
GB | 08.02.2022 | ||
IE | 08.02.2022 | ||
LU | 08.02.2022 | ||
BE | 28.02.2022 | ||
CH | 28.02.2022 | ||
FR | 28.02.2022 | ||
LI | 28.02.2022 | ||
Former [2023/09] | AL | 04.08.2021 | |
AT | 04.08.2021 | ||
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
IT | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
MC | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SI | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
GB | 08.02.2022 | ||
IE | 08.02.2022 | ||
LU | 08.02.2022 | ||
CH | 28.02.2022 | ||
FR | 28.02.2022 | ||
LI | 28.02.2022 | ||
Former [2023/08] | AL | 04.08.2021 | |
AT | 04.08.2021 | ||
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
IT | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
MC | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SI | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
GB | 08.02.2022 | ||
IE | 08.02.2022 | ||
LU | 08.02.2022 | ||
FR | 28.02.2022 | ||
Former [2023/03] | AL | 04.08.2021 | |
AT | 04.08.2021 | ||
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
IT | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
MC | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SI | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
LU | 08.02.2022 | ||
FR | 28.02.2022 | ||
Former [2022/47] | AL | 04.08.2021 | |
AT | 04.08.2021 | ||
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
IT | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
MC | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SI | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
LU | 08.02.2022 | ||
Former [2022/44] | AL | 04.08.2021 | |
AT | 04.08.2021 | ||
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
IT | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
MC | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SI | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/36] | AL | 04.08.2021 | |
AT | 04.08.2021 | ||
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
IT | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SI | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/29] | AL | 04.08.2021 | |
AT | 04.08.2021 | ||
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/26] | AT | 04.08.2021 | |
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/24] | AT | 04.08.2021 | |
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SK | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/21] | AT | 04.08.2021 | |
DK | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/16] | AT | 04.08.2021 | |
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/10] | AT | 04.08.2021 | |
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
PL | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/09] | AT | 04.08.2021 | |
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
LT | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
PT | 06.12.2021 | ||
Former [2022/08] | AT | 04.08.2021 | |
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
LT | 04.08.2021 | ||
SE | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
Former [2022/07] | AT | 04.08.2021 | |
LT | 04.08.2021 | ||
NO | 04.11.2021 | Documents cited: | Search | [I]US2003109155 (YAMASHITA KAZUNORI [JP]) [I] 1* figures 1-11 *; | [I]US2007197081 (PATTERSON JEREMY CHRISTIN [US], et al) [I] 1-15 * figures 1-10 * * paragraph [0031] *; | [I]KR101479054B (YURA CORP CO LTD [KR]) [I] 1 * figures 1-6 *; | [I]US2015295352 (KIM SEUNG RAI [KR], et al) [I] 1-15 * figures 1-9 * |