blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3206376

EP3206376 - NETWORK COMMUNICATION SYSTEM WITH WEB PUSH PROTOCOL [Right-click to bookmark this link]
Former [2017/33]NETWORK COMMUNICATION SYSTEM AND METHOD WITH WEB PUSH PROTOCOL
[2020/10]
StatusNo opposition filed within time limit
Status updated on  02.07.2021
Database last updated on 03.10.2024
FormerThe patent has been granted
Status updated on  24.07.2020
FormerGrant of patent is intended
Status updated on  05.03.2020
FormerExamination is in progress
Status updated on  31.01.2019
FormerRequest for examination was made
Status updated on  23.02.2018
FormerThe application has been published
Status updated on  14.07.2017
Most recent event   Tooltip06.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 09.10.2024 [2024/41]
Applicant(s)For all designated states
Global Eagle Entertainment Inc.
4553 Glencoe Ave., Suite 300
Los Angeles, CA 90292 / US
[2020/35]
Former [2017/33]For all designated states
Global Eagle Entertainment Inc.
4553 Glencoe Ave., Suite 300
Los Angeles, CA 90292 / US
Inventor(s)01 / Vignali, Claudio
15625 SW 52 Ct.
Miramar, FL 33025 / US
 [2017/33]
Representative(s)Samson & Partner Patentanwälte mbB
Widenmayerstraße 6
80538 München / DE
[2020/35]
Former [2017/33]P&TS SA (AG, Ltd.)
Av. J.-J. Rousseau 4
P.O. Box 2848
2001 Neuchâtel / CH
Application number, filing date17155705.110.02.2017
[2017/33]
Priority number, dateUS201662295399P15.02.2016         Original published format: US 201662295399 P
US20161513887426.04.2016         Original published format: US201615138874
[2017/33]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3206376
Date:16.08.2017
Language:EN
[2017/33]
Type: B1 Patent specification 
No.:EP3206376
Date:26.08.2020
Language:EN
[2020/35]
Search report(s)(Supplementary) European search report - dispatched on:EP20.06.2017
ClassificationIPC:H04B7/185, H04L29/08
[2020/10]
CPC:
H04L67/2895 (EP,US); H04L67/5681 (EP,US); H04B7/1851 (EP,US);
H04L67/01 (US); H04L67/02 (EP,US); H04L67/2876 (EP,US);
H04L67/289 (EP,US) (-)
Former IPC [2017/33]H04L29/08
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/13]
Former [2017/33]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:NETZWERKKOMMUNIKATIONSSYSTEM MIT WEB PUSH PROTOKOLL[2020/10]
English:NETWORK COMMUNICATION SYSTEM WITH WEB PUSH PROTOCOL[2020/10]
French:SYSTÈME DE COMMUNICATION DE RÉSEAU AVEC PROTOCOLE PUSH WEB[2020/10]
Former [2017/33]NETZWERKKOMMUNIKATIONSSYSTEM UND -VERFAHREN MIT WEB PUSH PROTOKOLL
Former [2017/33]NETWORK COMMUNICATION SYSTEM AND METHOD WITH WEB PUSH PROTOCOL
Former [2017/33]SYSTÈME ET PROCÉDÉ DE COMMUNICATION DE RÉSEAU AVEC PROTOCOLE PUSH WEB
Examination procedure10.02.2017Date on which the examining division has become responsible
15.02.2018Amendment by applicant (claims and/or description)
15.02.2018Examination requested  [2018/13]
01.02.2019Despatch of a communication from the examining division (Time limit: M04)
07.06.2019Reply to a communication from the examining division
25.06.2019Despatch of a communication from the examining division (Time limit: M06)
30.12.2019Reply to a communication from the examining division
06.03.2020Communication of intention to grant the patent
16.07.2020Fee for grant paid
16.07.2020Fee for publishing/printing paid
16.07.2020Receipt of the translation of the claim(s)
Opposition(s)27.05.2021No opposition filed within time limit [2021/31]
Fees paidRenewal fee
28.02.2019Renewal fee patent year 03
21.02.2020Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU10.02.2017
AL26.08.2020
AT26.08.2020
CY26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
IT26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
MK26.08.2020
MT26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
TR26.08.2020
BG26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
IE10.02.2021
LU10.02.2021
BE28.02.2021
CH28.02.2021
LI28.02.2021
[2024/41]
Former [2024/29]HU10.02.2017
AL26.08.2020
AT26.08.2020
CY26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
IT26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
MK26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
TR26.08.2020
BG26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
IE10.02.2021
LU10.02.2021
BE28.02.2021
CH28.02.2021
LI28.02.2021
Former [2024/22]HU10.02.2017
AL26.08.2020
AT26.08.2020
CY26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
IT26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
MK26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
IE10.02.2021
LU10.02.2021
BE28.02.2021
CH28.02.2021
LI28.02.2021
Former [2023/30]HU10.02.2017
AL26.08.2020
AT26.08.2020
CY26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
IT26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
IE10.02.2021
LU10.02.2021
BE28.02.2021
CH28.02.2021
LI28.02.2021
Former [2023/27]HU10.02.2017
AL26.08.2020
AT26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
IT26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
IE10.02.2021
LU10.02.2021
BE28.02.2021
CH28.02.2021
LI28.02.2021
Former [2022/34]AL26.08.2020
AT26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
IT26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
IE10.02.2021
LU10.02.2021
BE28.02.2021
CH28.02.2021
LI28.02.2021
Former [2022/07]AL26.08.2020
AT26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
IT26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
IE10.02.2021
LU10.02.2021
CH28.02.2021
LI28.02.2021
Former [2021/47]AL26.08.2020
AT26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
IT26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
LU10.02.2021
CH28.02.2021
LI28.02.2021
Former [2021/41]AL26.08.2020
AT26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
IT26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/36]AL26.08.2020
AT26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
IT26.08.2020
LT26.08.2020
LV26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/34]AL26.08.2020
AT26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
IT26.08.2020
LT26.08.2020
LV26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/28]AL26.08.2020
AT26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/25]AL26.08.2020
AT26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SM26.08.2020
BG26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/23]AT26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SM26.08.2020
BG26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/22]CZ26.08.2020
DK26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SM26.08.2020
BG26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/21]DK26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
NL26.08.2020
PL26.08.2020
RS26.08.2020
SE26.08.2020
BG26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/12]FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
NL26.08.2020
PL26.08.2020
RS26.08.2020
SE26.08.2020
BG26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/10]FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
PL26.08.2020
RS26.08.2020
SE26.08.2020
BG26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/09]FI26.08.2020
LT26.08.2020
SE26.08.2020
BG26.11.2020
GR27.11.2020
PT28.12.2020
Former [2021/08]FI26.08.2020
LT26.08.2020
SE26.08.2020
BG26.11.2020
PT28.12.2020
Former [2021/07]FI26.08.2020
LT26.08.2020
Documents cited:Search[XI]WO9908429  (TACHYON INC [US]) [X] 1-6,9-13,16 * abstract * * column 1, line 20 - column 3, line 47 * * column 4, line 35 - column 6, line 18 * * column 7, line 22 - column 13, line 25 * [I] 7,8,14,15;
 [XI]US2005108517  (DILLON DOUG [US], et al) [X] 1-6,9-13,16 * abstract * * paragraphs 0003-0011, 0029-0046, 0049-0078 *[I] 7,8,14,15
ExaminationUS2002073167
 US6658463
 US6907429
by applicantUS8954600
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.