blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3205869

EP3205869 - DEFLECTION LIMITER FOR A CASCADE ASSEMBLY OF A THRUST REVERSER [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  13.10.2023
Database last updated on 03.09.2024
FormerThe patent has been granted
Status updated on  04.11.2022
FormerGrant of patent is intended
Status updated on  15.09.2022
FormerExamination is in progress
Status updated on  13.11.2020
FormerRequest for examination was made
Status updated on  23.02.2018
FormerThe application has been published
Status updated on  14.07.2017
Most recent event   Tooltip24.05.2024Lapse of the patent in a contracting state
New state(s): IT
published on 26.06.2024  [2024/26]
Applicant(s)For all designated states
Rohr, Inc.
850 Lagoon Drive
Chula Vista, CA 91910-2098 / US
[2017/33]
Inventor(s)01 / CRAWFORD, Sara Christine
1849 Whaley Ave.
San Diego, CA 92104 / US
 [2022/49]
Former [2017/33]01 / CRAWFORD, Sara Christine
1849 Whaley Ave.
San Diego, CA California 92104 / US
Representative(s)Dehns
St. Bride's House
10 Salisbury Square
London EC4Y 8JD / GB
[2022/49]
Former [2017/33]Gittins, Alex Michael
Dehns
St Bride's House
10 Salisbury Square
London EC4Y 8JD / GB
Application number, filing date17155710.110.02.2017
[2017/33]
Priority number, dateUS20161504027410.02.2016         Original published format: US201615040274
[2017/33]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3205869
Date:16.08.2017
Language:EN
[2017/33]
Type: B1 Patent specification 
No.:EP3205869
Date:07.12.2022
Language:EN
[2022/49]
Search report(s)(Supplementary) European search report - dispatched on:EP12.06.2017
ClassificationIPC:F02K1/72
[2017/33]
CPC:
F02K1/72 (EP,US); F01D25/24 (US); F01D25/28 (US);
F02K1/766 (US); F04D29/522 (US); F05D2220/323 (US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/13]
Former [2017/33]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:VERSTEIFUNG FÜR EINE KASKADENANORDNUNG EINES SCHUBUMKEHRERS[2017/33]
English:DEFLECTION LIMITER FOR A CASCADE ASSEMBLY OF A THRUST REVERSER[2017/33]
French:LIMITEUR DE DÉFLEXION POUR CASCADE D'INVERSEUR DE POUSSÉE[2022/39]
Former [2017/33]LIMITEUR DE DÉFLEXION POUR MONTAGE EN CASCADE D'UN INVERSEUR DE POUSSÉE
Examination procedure10.02.2017Date on which the examining division has become responsible
16.02.2018Amendment by applicant (claims and/or description)
16.02.2018Examination requested  [2018/13]
17.11.2020Despatch of a communication from the examining division (Time limit: M06)
27.05.2021Reply to a communication from the examining division
16.09.2022Communication of intention to grant the patent
28.10.2022Fee for grant paid
28.10.2022Fee for publishing/printing paid
28.10.2022Receipt of the translation of the claim(s)
Opposition(s)08.09.2023No opposition filed within time limit [2023/46]
Fees paidRenewal fee
20.02.2019Renewal fee patent year 03
20.02.2020Renewal fee patent year 04
19.02.2021Renewal fee patent year 05
17.02.2022Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAL07.12.2022
AT07.12.2022
CZ07.12.2022
DK07.12.2022
EE07.12.2022
ES07.12.2022
FI07.12.2022
HR07.12.2022
IT07.12.2022
LT07.12.2022
LV07.12.2022
MC07.12.2022
NL07.12.2022
PL07.12.2022
RO07.12.2022
RS07.12.2022
SE07.12.2022
SI07.12.2022
SK07.12.2022
SM07.12.2022
IE10.02.2023
LU10.02.2023
BE28.02.2023
CH28.02.2023
LI28.02.2023
NO07.03.2023
GR08.03.2023
IS07.04.2023
PT10.04.2023
[2024/26]
Former [2024/12]AL07.12.2022
AT07.12.2022
CZ07.12.2022
DK07.12.2022
EE07.12.2022
ES07.12.2022
FI07.12.2022
HR07.12.2022
LT07.12.2022
LV07.12.2022
MC07.12.2022
NL07.12.2022
PL07.12.2022
RO07.12.2022
RS07.12.2022
SE07.12.2022
SI07.12.2022
SK07.12.2022
SM07.12.2022
IE10.02.2023
LU10.02.2023
BE28.02.2023
CH28.02.2023
LI28.02.2023
NO07.03.2023
GR08.03.2023
IS07.04.2023
PT10.04.2023
Former [2024/08]AL07.12.2022
AT07.12.2022
CZ07.12.2022
DK07.12.2022
EE07.12.2022
ES07.12.2022
FI07.12.2022
HR07.12.2022
LT07.12.2022
LV07.12.2022
MC07.12.2022
NL07.12.2022
PL07.12.2022
RO07.12.2022
RS07.12.2022
SE07.12.2022
SI07.12.2022
SK07.12.2022
SM07.12.2022
IE10.02.2023
LU10.02.2023
CH28.02.2023
LI28.02.2023
NO07.03.2023
GR08.03.2023
IS07.04.2023
PT10.04.2023
Former [2023/51]AL07.12.2022
AT07.12.2022
CZ07.12.2022
DK07.12.2022
EE07.12.2022
ES07.12.2022
FI07.12.2022
HR07.12.2022
LT07.12.2022
LV07.12.2022
MC07.12.2022
NL07.12.2022
PL07.12.2022
RO07.12.2022
RS07.12.2022
SE07.12.2022
SI07.12.2022
SK07.12.2022
SM07.12.2022
LU10.02.2023
CH28.02.2023
LI28.02.2023
NO07.03.2023
GR08.03.2023
IS07.04.2023
PT10.04.2023
Former [2023/49]AL07.12.2022
AT07.12.2022
CZ07.12.2022
DK07.12.2022
EE07.12.2022
ES07.12.2022
FI07.12.2022
HR07.12.2022
LT07.12.2022
LV07.12.2022
MC07.12.2022
NL07.12.2022
PL07.12.2022
RO07.12.2022
RS07.12.2022
SE07.12.2022
SK07.12.2022
SM07.12.2022
LU10.02.2023
CH28.02.2023
LI28.02.2023
NO07.03.2023
GR08.03.2023
IS07.04.2023
PT10.04.2023
Former [2023/48]AL07.12.2022
AT07.12.2022
CZ07.12.2022
DK07.12.2022
EE07.12.2022
ES07.12.2022
FI07.12.2022
HR07.12.2022
LT07.12.2022
LV07.12.2022
MC07.12.2022
NL07.12.2022
PL07.12.2022
RO07.12.2022
RS07.12.2022
SE07.12.2022
SK07.12.2022
SM07.12.2022
CH28.02.2023
LI28.02.2023
NO07.03.2023
GR08.03.2023
IS07.04.2023
PT10.04.2023
Former [2023/46]AL07.12.2022
AT07.12.2022
CZ07.12.2022
DK07.12.2022
EE07.12.2022
ES07.12.2022
FI07.12.2022
HR07.12.2022
LT07.12.2022
LV07.12.2022
MC07.12.2022
NL07.12.2022
PL07.12.2022
RO07.12.2022
RS07.12.2022
SE07.12.2022
SK07.12.2022
SM07.12.2022
NO07.03.2023
GR08.03.2023
IS07.04.2023
PT10.04.2023
Former [2023/44]AL07.12.2022
AT07.12.2022
CZ07.12.2022
EE07.12.2022
ES07.12.2022
FI07.12.2022
HR07.12.2022
LT07.12.2022
LV07.12.2022
MC07.12.2022
NL07.12.2022
PL07.12.2022
RO07.12.2022
RS07.12.2022
SE07.12.2022
SK07.12.2022
SM07.12.2022
NO07.03.2023
GR08.03.2023
IS07.04.2023
PT10.04.2023
Former [2023/39]AL07.12.2022
AT07.12.2022
CZ07.12.2022
EE07.12.2022
ES07.12.2022
FI07.12.2022
HR07.12.2022
LT07.12.2022
LV07.12.2022
NL07.12.2022
PL07.12.2022
RO07.12.2022
RS07.12.2022
SE07.12.2022
SK07.12.2022
SM07.12.2022
NO07.03.2023
GR08.03.2023
IS07.04.2023
PT10.04.2023
Former [2023/38]AL07.12.2022
AT07.12.2022
CZ07.12.2022
EE07.12.2022
ES07.12.2022
FI07.12.2022
HR07.12.2022
LT07.12.2022
LV07.12.2022
NL07.12.2022
PL07.12.2022
RO07.12.2022
RS07.12.2022
SE07.12.2022
SK07.12.2022
SM07.12.2022
NO07.03.2023
GR08.03.2023
PT10.04.2023
Former [2023/37]AL07.12.2022
AT07.12.2022
CZ07.12.2022
EE07.12.2022
ES07.12.2022
FI07.12.2022
HR07.12.2022
LT07.12.2022
LV07.12.2022
NL07.12.2022
PL07.12.2022
RO07.12.2022
RS07.12.2022
SE07.12.2022
SM07.12.2022
NO07.03.2023
GR08.03.2023
PT10.04.2023
Former [2023/35]AT07.12.2022
CZ07.12.2022
EE07.12.2022
ES07.12.2022
FI07.12.2022
HR07.12.2022
LT07.12.2022
LV07.12.2022
NL07.12.2022
PL07.12.2022
RO07.12.2022
RS07.12.2022
SE07.12.2022
SM07.12.2022
NO07.03.2023
GR08.03.2023
PT10.04.2023
Former [2023/34]EE07.12.2022
ES07.12.2022
FI07.12.2022
HR07.12.2022
LT07.12.2022
LV07.12.2022
NL07.12.2022
PL07.12.2022
RS07.12.2022
SE07.12.2022
SM07.12.2022
NO07.03.2023
GR08.03.2023
PT10.04.2023
Former [2023/33]ES07.12.2022
FI07.12.2022
HR07.12.2022
LT07.12.2022
LV07.12.2022
NL07.12.2022
PL07.12.2022
RS07.12.2022
SE07.12.2022
SM07.12.2022
NO07.03.2023
GR08.03.2023
Former [2023/29]ES07.12.2022
FI07.12.2022
HR07.12.2022
LT07.12.2022
LV07.12.2022
NL07.12.2022
PL07.12.2022
RS07.12.2022
SE07.12.2022
NO07.03.2023
GR08.03.2023
Former [2023/26]ES07.12.2022
FI07.12.2022
HR07.12.2022
LT07.12.2022
LV07.12.2022
PL07.12.2022
RS07.12.2022
SE07.12.2022
NO07.03.2023
GR08.03.2023
Former [2023/24]ES07.12.2022
FI07.12.2022
HR07.12.2022
LT07.12.2022
LV07.12.2022
SE07.12.2022
NO07.03.2023
GR08.03.2023
Former [2023/23]ES07.12.2022
FI07.12.2022
LT07.12.2022
LV07.12.2022
SE07.12.2022
NO07.03.2023
GR08.03.2023
Former [2023/22]ES07.12.2022
FI07.12.2022
LT07.12.2022
SE07.12.2022
NO07.03.2023
Former [2023/20]LT07.12.2022
NO07.03.2023
Documents cited:Search[X]WO9634193  (UNITED TECHNOLOGIES CORP [US]) [X] 1,2,4,5 * page 6 - pages 23-26 * * figure 2 *;
 [XI]WO2012010774  (AIRCELLE SA [FR], et al) [X] 14,15 * page 8, line 32 - page 10, line 31 * * figures 1-5 * [I] 1-5,7-9;
 [A]FR3007800  (AIRCELLE SA [FR]) [A] 1-15 * page 7, line 30 - page 8, line 16 ** figure 5 *
ExaminationUS2014325957
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.