blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3205748

EP3205748 - ANTI-CORROSION AND/OR PASSIVATION COMPOSITIONS FOR METAL-CONTAINING SUBSTRATES AND METHODS FOR MAKING, ENHANCING, AND APPLYING THE SAME [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  03.03.2023
Database last updated on 19.07.2024
FormerThe patent has been granted
Status updated on  25.03.2022
FormerGrant of patent is intended
Status updated on  30.11.2021
FormerExamination is in progress
Status updated on  01.02.2019
FormerRequest for examination was made
Status updated on  23.02.2018
FormerThe application has been published
Status updated on  14.07.2017
Most recent event   Tooltip29.09.2023Lapse of the patent in a contracting state
New state(s): MC
published on 01.11.2023  [2023/44]
Applicant(s)For all designated states
Goodrich Corporation
Four Coliseum Centre
2730 West Tyvola Road
Charlotte, NC 28217-4578 / US
[2022/17]
Former [2017/33]For all designated states
Goodrich Corporation
Four Caliseum Centre 2730 West Tyvola Road
Charlotte, NC 28217-4578 / US
Inventor(s)01 / KRYZMAN, Michael A.
34 Hammick Road
West Hartford, CT Connecticut 06107 / US
02 / ZAFIRIS, Georgios S.
170 Long Hill Drive
Glastonbury, CT Connecticut 06033 / US
03 / JAWOROWSKI, Mark R.
64 Uplands Way
Glastonbury, CT Connecticut 06033 / US
04 / ZHANG, Weilong
884 Neipsic Road
Glastonbury, CT Connecticut 06033 / US
05 / PANZA-GIOSA, Roque
2011 Marine Drive
Oakville, Ontario L6L 1B5 / CA
06 / MANZINI, Marilea
60 Equator Crescent
Maple, Ontario L6A 2Y9 / CA
 [2017/33]
Representative(s)Dehns
St. Bride's House
10 Salisbury Square
London EC4Y 8JD / GB
[2022/17]
Former [2017/33]Hughes, Andrea Michelle
Dehns
St Bride's House
10 Salisbury Square
London EC4Y 8JD / GB
Application number, filing date17155825.713.02.2017
[2017/33]
Priority number, dateUS20161504189411.02.2016         Original published format: US201615041894
[2017/33]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3205748
Date:16.08.2017
Language:EN
[2017/33]
Type: B1 Patent specification 
No.:EP3205748
Date:27.04.2022
Language:EN
[2022/17]
Search report(s)(Supplementary) European search report - dispatched on:EP13.06.2017
ClassificationIPC:C08K3/24, C08K3/34, C08K13/02, C08K3/22, C08K3/32, C23F11/08, C23F11/12, C23F11/14, C08K5/098, C09D5/08
[2021/48]
CPC:
C09D5/084 (EP,US); C23F11/126 (KR); C09D5/086 (US);
C09D127/06 (KR); C09D5/082 (US); C09D5/106 (KR);
C23F11/08 (EP,US); C23F11/124 (EP,US); C23F11/147 (EP,US);
C23F11/184 (KR); C23F11/188 (KR); C08K13/02 (EP,US);
C08K2003/2296 (EP,US); C08K2003/321 (EP,US); C08K2003/327 (EP,US);
C08K2201/014 (EP,US); C08K3/24 (EP,US); C08K3/34 (EP,US);
C08K5/098 (EP,US) (-)
Former IPC [2017/33]C23F11/08, C23F11/12, C23F11/14, C09D5/08, C08K5/098
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/13]
Former [2017/33]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:ANTIKORROSIONS- UND/ODER PASSIVIERUNGSZUSAMMENSETZUNGEN FÜR METALLHALTIGE SUBSTRATE UND VERFAHREN ZUR HERSTELLUNG, VERBESSERUNG UND ANWENDUNG DAVON[2017/33]
English:ANTI-CORROSION AND/OR PASSIVATION COMPOSITIONS FOR METAL-CONTAINING SUBSTRATES AND METHODS FOR MAKING, ENHANCING, AND APPLYING THE SAME[2017/33]
French:COMPOSITIONS DE PASSIVATION ET/OU ANTICORROSION POUR SUBSTRATS CONTENANT DU MÉTAL ET LEURS PROCÉDÉS DE FABRICATION, D'AMÉLIORATION ET D'APPLICATION[2017/33]
Examination procedure13.02.2017Date on which the examining division has become responsible
14.02.2018Amendment by applicant (claims and/or description)
14.02.2018Examination requested  [2018/13]
05.02.2019Despatch of a communication from the examining division (Time limit: M04)
17.06.2019Reply to a communication from the examining division
02.10.2019Despatch of a communication from the examining division (Time limit: M06)
13.03.2020Reply to a communication from the examining division
01.06.2021Despatch of a communication from the examining division (Time limit: M04)
02.08.2021Reply to a communication from the examining division
01.12.2021Communication of intention to grant the patent
21.03.2022Fee for grant paid
21.03.2022Fee for publishing/printing paid
21.03.2022Receipt of the translation of the claim(s)
Opposition(s)30.01.2023No opposition filed within time limit [2023/14]
Fees paidRenewal fee
20.02.2019Renewal fee patent year 03
20.02.2020Renewal fee patent year 04
19.02.2021Renewal fee patent year 05
17.02.2022Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAL27.04.2022
AT27.04.2022
CZ27.04.2022
DK27.04.2022
EE27.04.2022
ES27.04.2022
FI27.04.2022
HR27.04.2022
LT27.04.2022
LV27.04.2022
MC27.04.2022
NL27.04.2022
PL27.04.2022
RO27.04.2022
RS27.04.2022
SE27.04.2022
SI27.04.2022
SK27.04.2022
SM27.04.2022
BG27.07.2022
NO27.07.2022
GR28.07.2022
IS27.08.2022
PT29.08.2022
[2023/44]
Former [2023/25]AL27.04.2022
AT27.04.2022
CZ27.04.2022
DK27.04.2022
EE27.04.2022
ES27.04.2022
FI27.04.2022
HR27.04.2022
LT27.04.2022
LV27.04.2022
NL27.04.2022
PL27.04.2022
RO27.04.2022
RS27.04.2022
SE27.04.2022
SI27.04.2022
SK27.04.2022
SM27.04.2022
BG27.07.2022
NO27.07.2022
GR28.07.2022
IS27.08.2022
PT29.08.2022
Former [2023/17]AL27.04.2022
AT27.04.2022
CZ27.04.2022
DK27.04.2022
EE27.04.2022
ES27.04.2022
FI27.04.2022
HR27.04.2022
LT27.04.2022
LV27.04.2022
NL27.04.2022
PL27.04.2022
RO27.04.2022
RS27.04.2022
SE27.04.2022
SK27.04.2022
SM27.04.2022
BG27.07.2022
NO27.07.2022
GR28.07.2022
IS27.08.2022
PT29.08.2022
Former [2023/09]AT27.04.2022
CZ27.04.2022
DK27.04.2022
EE27.04.2022
ES27.04.2022
FI27.04.2022
HR27.04.2022
LT27.04.2022
LV27.04.2022
NL27.04.2022
PL27.04.2022
RO27.04.2022
RS27.04.2022
SE27.04.2022
SK27.04.2022
SM27.04.2022
BG27.07.2022
NO27.07.2022
GR28.07.2022
IS27.08.2022
PT29.08.2022
Former [2023/07]AT27.04.2022
DK27.04.2022
ES27.04.2022
FI27.04.2022
HR27.04.2022
LT27.04.2022
LV27.04.2022
NL27.04.2022
PL27.04.2022
RS27.04.2022
SE27.04.2022
BG27.07.2022
NO27.07.2022
GR28.07.2022
IS27.08.2022
PT29.08.2022
Former [2022/51]AT27.04.2022
ES27.04.2022
FI27.04.2022
HR27.04.2022
LT27.04.2022
LV27.04.2022
NL27.04.2022
PL27.04.2022
RS27.04.2022
SE27.04.2022
BG27.07.2022
NO27.07.2022
GR28.07.2022
IS27.08.2022
PT29.08.2022
Former [2022/50]AT27.04.2022
ES27.04.2022
FI27.04.2022
HR27.04.2022
LT27.04.2022
LV27.04.2022
NL27.04.2022
PL27.04.2022
RS27.04.2022
SE27.04.2022
BG27.07.2022
NO27.07.2022
GR28.07.2022
PT29.08.2022
Former [2022/49]AT27.04.2022
ES27.04.2022
FI27.04.2022
HR27.04.2022
LT27.04.2022
LV27.04.2022
NL27.04.2022
SE27.04.2022
BG27.07.2022
NO27.07.2022
GR28.07.2022
PT29.08.2022
Former [2022/47]AT27.04.2022
ES27.04.2022
FI27.04.2022
LT27.04.2022
NL27.04.2022
SE27.04.2022
NO27.07.2022
PT29.08.2022
Former [2022/44]NL27.04.2022
Documents cited:Search[XYI]US2004092637  (MCCLANAHAN CRAIG J [US]) [X] 1-3,8,10,13,15 * paragraphs [0013] , [0 20] * [Y] 1-15 [I] 7;
 [XYI]WO2008090411  (TENARIS CONNECTIONS AG [LI], et al) [X] 1,13,15 * paragraphs [0015] , [0 20]; claim 1 * [Y] 1-15 [I] 7;
 [Y]US2015274985  (ZHANG WEILONG [US], et al) [Y] 1-15* paragraph [0016]; claims 11-19 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.