blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3208222

EP3208222 - ANONYMOUS AND EPHEMERAL TOKENS TO AUTHENTICATE ELEVATOR CALLS [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  23.04.2021
Database last updated on 05.10.2024
FormerThe patent has been granted
Status updated on  15.05.2020
FormerGrant of patent is intended
Status updated on  26.03.2020
FormerExamination is in progress
Status updated on  08.04.2019
FormerRequest for examination was made
Status updated on  02.03.2018
FormerThe application has been published
Status updated on  21.07.2017
Most recent event   Tooltip06.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 09.10.2024 [2024/41]
Applicant(s)For all designated states
Otis Elevator Company
One Carrier Place
Farmington CT 06032 / US
[2017/36]
Former [2017/34]For all designated states
Otis Elevator Company
One Carrier Place
Farmington, Connecticut 06032 / US
Inventor(s)01 / SHILA, Devu Manikantan
411 Silver Lane
East Hartford, CT Connecticut 06108 / US
02 / SIMCIK, Paul A.
Five Farm Springs Road
Farmington, CT Connecticut 06032 / US
03 / LOVETT, Teems E.
411 Silver Lane
East Hartford, CT Connecticut 06108 / US
 [2017/34]
Representative(s)Dehns
10 Old Bailey
London EC4M 7NG / GB
[N/P]
Former [2020/25]Dehns
St. Bride's House
10 Salisbury Square
London EC4Y 8JD / GB
Former [2017/34]Ramsay, Laura Anne
Dehns
St Bride's House
10 Salisbury Square
London EC4Y 8JD / GB
Application number, filing date17156234.115.02.2017
[2017/34]
Priority number, dateUS201662296835P18.02.2016         Original published format: US 201662296835 P
[2017/34]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3208222
Date:23.08.2017
Language:EN
[2017/34]
Type: B1 Patent specification 
No.:EP3208222
Date:17.06.2020
Language:EN
[2020/25]
Search report(s)(Supplementary) European search report - dispatched on:EP17.07.2017
ClassificationIPC:B66B1/46, G06F21/33
[2017/34]
CPC:
G07C9/21 (EP,US); H04L63/0807 (EP,CN,US); B66B1/468 (EP,US);
G06F21/335 (EP,US); G07C9/27 (EP,CN); H04L63/0838 (EP,US);
H04L63/108 (EP,CN,US); H04L9/0872 (CN); H04W12/06 (EP,US);
B66B2201/4653 (EP,US); B66B2201/4676 (EP,US); G06F2221/2137 (EP,US);
H04W12/61 (EP,US); H04W88/02 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/14]
Former [2017/34]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:ANONYME UND EPHEMERE TOKEN ZUR AUTHENTIFIZIERUNG AUF AUFZUGSAUFRUFEN[2017/34]
English:ANONYMOUS AND EPHEMERAL TOKENS TO AUTHENTICATE ELEVATOR CALLS[2017/34]
French:JETONS ÉPHÉMÈRES ET ANONYMES POUR AUTHENTIFIER DES APPELS D'ASCENSEUR[2017/34]
Examination procedure15.02.2017Date on which the examining division has become responsible
21.02.2018Amendment by applicant (claims and/or description)
21.02.2018Examination requested  [2018/14]
11.04.2019Despatch of a communication from the examining division (Time limit: M06)
03.10.2019Reply to a communication from the examining division
27.03.2020Communication of intention to grant the patent
04.05.2020Fee for grant paid
04.05.2020Fee for publishing/printing paid
04.05.2020Receipt of the translation of the claim(s)
Opposition(s)18.03.2021No opposition filed within time limit [2021/21]
Fees paidRenewal fee
20.02.2019Renewal fee patent year 03
20.02.2020Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU15.02.2017
AL17.06.2020
AT17.06.2020
CY17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
MK17.06.2020
MT17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
TR17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
GB15.02.2021
IE15.02.2021
LU15.02.2021
BE28.02.2021
CH28.02.2021
LI28.02.2021
[2024/41]
Former [2024/29]HU15.02.2017
AL17.06.2020
AT17.06.2020
CY17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
MK17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
TR17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
GB15.02.2021
IE15.02.2021
LU15.02.2021
BE28.02.2021
CH28.02.2021
LI28.02.2021
Former [2024/22]HU15.02.2017
AL17.06.2020
AT17.06.2020
CY17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
MK17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
GB15.02.2021
IE15.02.2021
LU15.02.2021
BE28.02.2021
CH28.02.2021
LI28.02.2021
Former [2023/30]HU15.02.2017
AL17.06.2020
AT17.06.2020
CY17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
GB15.02.2021
IE15.02.2021
LU15.02.2021
BE28.02.2021
CH28.02.2021
LI28.02.2021
Former [2023/27]HU15.02.2017
AL17.06.2020
AT17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
GB15.02.2021
IE15.02.2021
LU15.02.2021
BE28.02.2021
CH28.02.2021
LI28.02.2021
Former [2022/33]AL17.06.2020
AT17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
GB15.02.2021
IE15.02.2021
LU15.02.2021
BE28.02.2021
CH28.02.2021
LI28.02.2021
Former [2022/09]AL17.06.2020
AT17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
GB15.02.2021
IE15.02.2021
LU15.02.2021
CH28.02.2021
LI28.02.2021
Former [2022/07]AL17.06.2020
AT17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
IE15.02.2021
LU15.02.2021
CH28.02.2021
LI28.02.2021
Former [2021/47]AL17.06.2020
AT17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
LU15.02.2021
CH28.02.2021
LI28.02.2021
Former [2021/41]AL17.06.2020
AT17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
Former [2021/24]AL17.06.2020
AT17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
Former [2021/21]AL17.06.2020
AT17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
Former [2021/10]AL17.06.2020
AT17.06.2020
CZ17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
Former [2021/09]AL17.06.2020
AT17.06.2020
CZ17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
NL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
PT19.10.2020
Former [2021/04]AL17.06.2020
FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
NL17.06.2020
RS17.06.2020
SE17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
Former [2021/01]FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
RS17.06.2020
SE17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
Former [2020/51]FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
RS17.06.2020
SE17.06.2020
NO17.09.2020
GR18.09.2020
Former [2020/50]FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
SE17.06.2020
NO17.09.2020
GR18.09.2020
Former [2020/48]FI17.06.2020
LT17.06.2020
SE17.06.2020
NO17.09.2020
Former [2020/47]LT17.06.2020
NO17.09.2020
Documents cited:Search[I]US7624433  (CLARK GILBERT W [US], et al) [I] 1-15 * abstract * * column 1, lines 22-35 * * column 6, line 66 - column 7, line 54 * * figure 3 *;
 [I]US2011030047  (GAO ZHI GUO [CN], et al) [I] 1-15 * abstract * * paragraphs [0031] - [0068] * * figures 2-4 *;
 [A]WO2014116182  (HITACHI ELEVATOR ASIA PTE LTD [SG]) [A] 1-15* the whole document *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.