EP3208592 - METHOD AND APPARATUS FOR HERMETICITY TEST [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 12.02.2021 Database last updated on 14.06.2024 | |
Former | The patent has been granted Status updated on 06.03.2020 | ||
Former | Grant of patent is intended Status updated on 03.11.2019 | ||
Former | Examination is in progress Status updated on 12.10.2018 | ||
Former | Request for examination was made Status updated on 02.03.2018 | ||
Former | The application has been published Status updated on 21.07.2017 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Solaredge Technologies Ltd. 1 HaMada Street Herzeliya 4673335 / IL | [2018/11] |
Former [2017/34] | For all designated states Solaredge Technologies Ltd. Hamada Street 1 4673335 Herzliya / IL | Inventor(s) | 01 /
Heimer, Yuval c/o Solaredge Technologies Ltd. 1 HaMada Street 4673335 Herzeliya / IL | 02 /
Savitzky, Reuven c/o Solaredge Technologies Ltd. 1 HaMada Street 4673335 Herzeliya / IL | [2017/34] | Representative(s) | V.O. P.O. Box 87930 Carnegieplein 5 2508 DH Den Haag / NL | [2017/34] | Application number, filing date | 17156754.8 | 17.02.2017 | [2017/34] | Priority number, date | US201662296885P | 18.02.2016 Original published format: US 201662296885 P | [2017/34] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3208592 | Date: | 23.08.2017 | Language: | EN | [2017/34] | Type: | B1 Patent specification | No.: | EP3208592 | Date: | 08.04.2020 | Language: | EN | [2020/15] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 03.07.2017 | Classification | IPC: | G01M3/32 | [2017/34] | CPC: |
G01M3/3209 (EP,CN,US);
G01M3/32 (CN);
G01M3/022 (CN);
G01M3/26 (CN);
G01M3/3272 (EP,CN,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/14] |
Former [2017/34] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VERFAHREN UND VORRICHTUNG FÜR DICHTIGKEITSPRÜFUNG | [2017/34] | English: | METHOD AND APPARATUS FOR HERMETICITY TEST | [2017/34] | French: | PROCÉDÉ ET APPAREIL DE TEST D'ÉTANCHÉITÉ | [2017/34] | Examination procedure | 17.02.2017 | Date on which the examining division has become responsible | 23.02.2018 | Amendment by applicant (claims and/or description) | 23.02.2018 | Examination requested [2018/14] | 12.10.2018 | Despatch of a communication from the examining division (Time limit: M06) | 23.04.2019 | Reply to a communication from the examining division | 06.06.2019 | Despatch of a communication from the examining division (Time limit: M04) | 10.10.2019 | Reply to a communication from the examining division | 04.11.2019 | Communication of intention to grant the patent | 27.02.2020 | Fee for grant paid | 27.02.2020 | Fee for publishing/printing paid | 27.02.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | EP20159809.1 / EP3693715 | Opposition(s) | 12.01.2021 | No opposition filed within time limit [2021/11] | Fees paid | Renewal fee | 13.02.2019 | Renewal fee patent year 03 | 13.02.2020 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 17.02.2017 | AL | 08.04.2020 | AT | 08.04.2020 | CY | 08.04.2020 | CZ | 08.04.2020 | DK | 08.04.2020 | EE | 08.04.2020 | ES | 08.04.2020 | FI | 08.04.2020 | HR | 08.04.2020 | IT | 08.04.2020 | LT | 08.04.2020 | LV | 08.04.2020 | MC | 08.04.2020 | MK | 08.04.2020 | PL | 08.04.2020 | RO | 08.04.2020 | RS | 08.04.2020 | SE | 08.04.2020 | SI | 08.04.2020 | SK | 08.04.2020 | SM | 08.04.2020 | TR | 08.04.2020 | BG | 08.07.2020 | NO | 08.07.2020 | GR | 09.07.2020 | IS | 08.08.2020 | PT | 17.08.2020 | [2024/29] |
Former [2024/22] | HU | 17.02.2017 | |
AL | 08.04.2020 | ||
AT | 08.04.2020 | ||
CY | 08.04.2020 | ||
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
IT | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
MK | 08.04.2020 | ||
PL | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
SI | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2023/30] | HU | 17.02.2017 | |
AL | 08.04.2020 | ||
AT | 08.04.2020 | ||
CY | 08.04.2020 | ||
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
IT | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
PL | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
SI | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2023/27] | HU | 17.02.2017 | |
AL | 08.04.2020 | ||
AT | 08.04.2020 | ||
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
IT | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
PL | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
SI | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/41] | AL | 08.04.2020 | |
AT | 08.04.2020 | ||
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
IT | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
PL | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
SI | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/24] | AL | 08.04.2020 | |
AT | 08.04.2020 | ||
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
IT | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
PL | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
SI | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/10] | AL | 08.04.2020 | |
AT | 08.04.2020 | ||
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
IT | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
PL | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/09] | AL | 08.04.2020 | |
AT | 08.04.2020 | ||
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
IT | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/08] | AL | 08.04.2020 | |
DK | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/04] | AL | 08.04.2020 | |
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/01] | FI | 08.04.2020 | |
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/51] | FI | 08.04.2020 | |
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/50] | FI | 08.04.2020 | |
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
SE | 08.04.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/48] | FI | 08.04.2020 | |
LT | 08.04.2020 | ||
SE | 08.04.2020 | ||
NO | 08.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/47] | LT | 08.04.2020 | |
NO | 08.07.2020 | ||
IS | 08.08.2020 | ||
Former [2020/46] | IS | 08.08.2020 | Documents cited: | Search | [XI]JP2002350280 (DENSO CORP) [X] 1-7,10-12,14,15 * paragraph [0001] - paragraph [0008]; figures 1,3,5,6,8 * * paragraph [0034] - paragraph [0058] * [I] 8,9,13; | [XAI]CN103237229 (WEIFANG TONGHUI ELECTRONIC TECHNOLOGY CO LTD) [X] 1-4,6,7,10-12,14 * page 1 - page 5; figures 1,2 * [A] 8,15 [I] 5,9,13; | [XA]DE102013211400 (BAYERISCHE MOTOREN WERKE AG [DE]) [X] 1,2,6,7,10,11 * paragraph [0001]; figures 1,2,3 * * paragraph [0007] - paragraph [0011] * * paragraph [0016] * * paragraph [0023] - paragraph [0030] *[A] 3-5,8,9,12-15 |