blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3370356

EP3370356 - VISIBLE LIGHT JAMMING SYSTEM AND VISIBLE LIGHT JAMMING METHOD [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  18.03.2022
Database last updated on 19.10.2024
FormerThe patent has been granted
Status updated on  09.04.2021
FormerGrant of patent is intended
Status updated on  02.12.2020
FormerRequest for examination was made
Status updated on  22.02.2019
FormerThe application has been published
Status updated on  03.08.2018
Most recent event   Tooltip13.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 16.10.2024  [2024/42]
Applicant(s)For all designated states
Vestel Elektronik Sanayi ve Ticaret A.S.
Organize Sanayi Bölgesi
45030 Manisa / TR
[2018/36]
Inventor(s)01 / ÖZKÜCÜK, Serhat
Vestel Elektronik Sanayi ve Ticaret A.S.
Organize Sanayi Bölgesi
45030 Manisa / TR
 [2018/36]
Representative(s)Kehl, Ascherl, Liebhoff & Ettmayr Patentanwälte Partnerschaft mbB
Emil-Riedel-Straße 18
80538 München / DE
[2021/19]
Former [2018/36]Ascherl, Andreas, et al
KEHL, ASCHERL, LIEBHOFF & ETTMAYR
Patentanwälte - Partnerschaft
Emil-Riedel-Strasse 18
80538 München / DE
Application number, filing date17158956.702.03.2017
[2018/36]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3370356
Date:05.09.2018
Language:EN
[2018/36]
Type: B1 Patent specification 
No.:EP3370356
Date:12.05.2021
Language:EN
[2021/19]
Search report(s)(Supplementary) European search report - dispatched on:EP03.08.2017
ClassificationIPC:H04K3/00, H04B10/116, H04B10/85
[2020/51]
CPC:
H04K3/45 (EP); H04B10/116 (EP); H04B10/85 (EP);
H04K3/42 (EP); H04K3/43 (EP); H04K2203/14 (EP);
H04K3/86 (EP); H04K3/92 (EP) (-)
Former IPC [2018/36]H04K3/00, H04B10/116
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/13]
Former [2018/36]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:STÖRUNGSSYSTEM MIT SICHTBAREM LICHT UND STÖRUNGSVERFAHREN MIT SICHTBAREM LICHT[2018/36]
English:VISIBLE LIGHT JAMMING SYSTEM AND VISIBLE LIGHT JAMMING METHOD[2018/36]
French:SYSTÈME ET PROCÉDÉ DE BROUILLAGE DE LUMIÈRE VISIBLE[2018/36]
Examination procedure19.02.2019Amendment by applicant (claims and/or description)
19.02.2019Examination requested  [2019/13]
19.02.2019Date on which the examining division has become responsible
03.12.2020Communication of intention to grant the patent
01.04.2021Fee for grant paid
01.04.2021Fee for publishing/printing paid
01.04.2021Receipt of the translation of the claim(s)
Opposition(s)15.02.2022No opposition filed within time limit [2022/16]
Fees paidRenewal fee
18.03.2019Renewal fee patent year 03
14.03.2020Renewal fee patent year 04
22.03.2021Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU02.03.2017
AL12.05.2021
AT12.05.2021
CY12.05.2021
CZ12.05.2021
DK12.05.2021
EE12.05.2021
ES12.05.2021
FI12.05.2021
HR12.05.2021
IT12.05.2021
LT12.05.2021
LV12.05.2021
MC12.05.2021
MK12.05.2021
MT12.05.2021
NL12.05.2021
PL12.05.2021
RO12.05.2021
RS12.05.2021
SE12.05.2021
SI12.05.2021
SK12.05.2021
SM12.05.2021
BG12.08.2021
NO12.08.2021
GR13.08.2021
IS12.09.2021
PT13.09.2021
[2024/42]
Former [2024/22]HU02.03.2017
AL12.05.2021
AT12.05.2021
CY12.05.2021
CZ12.05.2021
DK12.05.2021
EE12.05.2021
ES12.05.2021
FI12.05.2021
HR12.05.2021
IT12.05.2021
LT12.05.2021
LV12.05.2021
MC12.05.2021
MK12.05.2021
NL12.05.2021
PL12.05.2021
RO12.05.2021
RS12.05.2021
SE12.05.2021
SI12.05.2021
SK12.05.2021
SM12.05.2021
BG12.08.2021
NO12.08.2021
GR13.08.2021
IS12.09.2021
PT13.09.2021
Former [2024/20]HU02.03.2017
AL12.05.2021
AT12.05.2021
CY12.05.2021
CZ12.05.2021
DK12.05.2021
EE12.05.2021
ES12.05.2021
FI12.05.2021
HR12.05.2021
IT12.05.2021
LT12.05.2021
LV12.05.2021
MC12.05.2021
NL12.05.2021
PL12.05.2021
RO12.05.2021
RS12.05.2021
SE12.05.2021
SI12.05.2021
SK12.05.2021
SM12.05.2021
BG12.08.2021
NO12.08.2021
GR13.08.2021
IS12.09.2021
PT13.09.2021
Former [2024/18]HU02.03.2017
AL12.05.2021
AT12.05.2021
CZ12.05.2021
DK12.05.2021
EE12.05.2021
ES12.05.2021
FI12.05.2021
HR12.05.2021
IT12.05.2021
LT12.05.2021
LV12.05.2021
MC12.05.2021
NL12.05.2021
PL12.05.2021
RO12.05.2021
RS12.05.2021
SE12.05.2021
SI12.05.2021
SK12.05.2021
SM12.05.2021
BG12.08.2021
NO12.08.2021
GR13.08.2021
IS12.09.2021
PT13.09.2021
Former [2022/47]AL12.05.2021
AT12.05.2021
CZ12.05.2021
DK12.05.2021
EE12.05.2021
ES12.05.2021
FI12.05.2021
HR12.05.2021
IT12.05.2021
LT12.05.2021
LV12.05.2021
MC12.05.2021
NL12.05.2021
PL12.05.2021
RO12.05.2021
RS12.05.2021
SE12.05.2021
SI12.05.2021
SK12.05.2021
SM12.05.2021
BG12.08.2021
NO12.08.2021
GR13.08.2021
IS12.09.2021
PT13.09.2021
Former [2022/36]AL12.05.2021
AT12.05.2021
CZ12.05.2021
DK12.05.2021
EE12.05.2021
ES12.05.2021
FI12.05.2021
HR12.05.2021
IT12.05.2021
LT12.05.2021
LV12.05.2021
NL12.05.2021
PL12.05.2021
RO12.05.2021
RS12.05.2021
SE12.05.2021
SI12.05.2021
SK12.05.2021
SM12.05.2021
BG12.08.2021
NO12.08.2021
GR13.08.2021
IS12.09.2021
PT13.09.2021
Former [2022/29]AL12.05.2021
AT12.05.2021
CZ12.05.2021
DK12.05.2021
EE12.05.2021
ES12.05.2021
FI12.05.2021
HR12.05.2021
LT12.05.2021
LV12.05.2021
NL12.05.2021
PL12.05.2021
RO12.05.2021
RS12.05.2021
SE12.05.2021
SI12.05.2021
SK12.05.2021
SM12.05.2021
BG12.08.2021
NO12.08.2021
GR13.08.2021
IS12.09.2021
PT13.09.2021
Former [2022/26]AL12.05.2021
AT12.05.2021
CZ12.05.2021
DK12.05.2021
EE12.05.2021
ES12.05.2021
FI12.05.2021
HR12.05.2021
LT12.05.2021
LV12.05.2021
NL12.05.2021
PL12.05.2021
RO12.05.2021
RS12.05.2021
SE12.05.2021
SK12.05.2021
SM12.05.2021
BG12.08.2021
NO12.08.2021
GR13.08.2021
IS12.09.2021
PT13.09.2021
Former [2022/23]AT12.05.2021
CZ12.05.2021
DK12.05.2021
EE12.05.2021
ES12.05.2021
FI12.05.2021
HR12.05.2021
LT12.05.2021
LV12.05.2021
NL12.05.2021
PL12.05.2021
RO12.05.2021
RS12.05.2021
SE12.05.2021
SK12.05.2021
SM12.05.2021
BG12.08.2021
NO12.08.2021
GR13.08.2021
IS12.09.2021
PT13.09.2021
Former [2022/10]AT12.05.2021
CZ12.05.2021
DK12.05.2021
EE12.05.2021
ES12.05.2021
FI12.05.2021
HR12.05.2021
LT12.05.2021
LV12.05.2021
NL12.05.2021
PL12.05.2021
RO12.05.2021
RS12.05.2021
SE12.05.2021
SK12.05.2021
SM12.05.2021
BG12.08.2021
NO12.08.2021
GR13.08.2021
PT13.09.2021
IS22.12.2021
Former [2022/09]AT12.05.2021
CZ12.05.2021
DK12.05.2021
ES12.05.2021
FI12.05.2021
HR12.05.2021
LT12.05.2021
LV12.05.2021
NL12.05.2021
PL12.05.2021
RO12.05.2021
RS12.05.2021
SE12.05.2021
SK12.05.2021
SM12.05.2021
BG12.08.2021
NO12.08.2021
GR13.08.2021
IS12.09.2021
PT13.09.2021
Former [2022/08]AT12.05.2021
CZ12.05.2021
DK12.05.2021
ES12.05.2021
FI12.05.2021
HR12.05.2021
LT12.05.2021
LV12.05.2021
NL12.05.2021
PL12.05.2021
RS12.05.2021
SE12.05.2021
SM12.05.2021
BG12.08.2021
NO12.08.2021
GR13.08.2021
IS12.09.2021
PT13.09.2021
Former [2022/07]AT12.05.2021
FI12.05.2021
HR12.05.2021
LT12.05.2021
LV12.05.2021
NL12.05.2021
PL12.05.2021
RS12.05.2021
SE12.05.2021
SM12.05.2021
BG12.08.2021
NO12.08.2021
GR13.08.2021
IS12.09.2021
PT13.09.2021
Former [2022/04]AT12.05.2021
FI12.05.2021
HR12.05.2021
LT12.05.2021
LV12.05.2021
NL12.05.2021
PL12.05.2021
RS12.05.2021
SE12.05.2021
BG12.08.2021
NO12.08.2021
GR13.08.2021
IS12.09.2021
PT13.09.2021
Former [2021/52]AT12.05.2021
FI12.05.2021
HR12.05.2021
LT12.05.2021
LV12.05.2021
PL12.05.2021
RS12.05.2021
SE12.05.2021
BG12.08.2021
NO12.08.2021
GR13.08.2021
IS12.09.2021
PT13.09.2021
Former [2021/51]AT12.05.2021
FI12.05.2021
HR12.05.2021
LT12.05.2021
LV12.05.2021
RS12.05.2021
SE12.05.2021
BG12.08.2021
NO12.08.2021
GR13.08.2021
IS12.09.2021
PT13.09.2021
Former [2021/50]AT12.05.2021
FI12.05.2021
HR12.05.2021
LT12.05.2021
LV12.05.2021
SE12.05.2021
BG12.08.2021
NO12.08.2021
GR13.08.2021
PT13.09.2021
Former [2021/49]AT12.05.2021
FI12.05.2021
HR12.05.2021
LT12.05.2021
LV12.05.2021
SE12.05.2021
BG12.08.2021
NO12.08.2021
GR13.08.2021
Former [2021/47]AT12.05.2021
FI12.05.2021
LT12.05.2021
BG12.08.2021
Former [2021/46]AT12.05.2021
FI12.05.2021
LT12.05.2021
Documents cited:Search[A]US2017012733  (ANDERSON GENE W [US]) [A] 1,5,6,8,12,13 * abstract * * paragraph [0002] - paragraph [0003] * * paragraph [0006] - paragraph [0008] * * paragraph [0018] - paragraph [0030] * * figures 1A-6 *;
 [XI]  - Grzegorz Blinowski, "The feasibility of launching physical layer attacks in visible light communication networks", (20160825), pages 1 - 6, URL: https://arxiv.org/ftp/arxiv/papers/1608/1608.07146.pdf, (20170726), XP055393801 [X] 1,8 * abstract * * paragraph [0001] - paragraph [04.2] * * page 12, column l, line 9 * * figures 1-6 * * tables 1-3 * [I] 2-7,9-14
 [A]  - MATTHIAS WILHELM ET AL, "Short paper : reactive jamming in wireless networks: how realistic is the threat?", WIRELESS NETWORK SECURITY, 2 Penn Plaza, Suite 701 New York NY 10121-0701 USA, (2011), doi:10.1145/1998412.1998422, ISBN 978-1-4503-0692-8, page 47, XP055393912 [A] 1-14 * abstract * * paragraph [0001] - paragraph [03.4] * * paragraph [0006] - paragraph [0007] * * figures 1-4 *

DOI:   http://dx.doi.org/10.1145/1998412.1998422
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.