EP3238805 - SUPPORT FOR A FILTER CLOGGING MEASUREMENT LEVEL UNIT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 25.01.2019 Database last updated on 26.06.2024 | |
Former | The patent has been granted Status updated on 16.02.2018 | ||
Former | Grant of patent is intended Status updated on 15.01.2018 | ||
Former | Request for examination was made Status updated on 17.11.2017 | ||
Former | The application has been published Status updated on 29.09.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Schneider Electric Industries SAS 35, rue Joseph Monier 92500 Rueil-Malmaison / FR | [2017/44] | Inventor(s) | 01 /
LINARES, Louis SCHNEIDER ELECTRIC INDUSTRIES SAS, Propriété Industrielle Boîte Postale Cedex 09 World Trade Center 38EE1, 5 Place Robert Schuman / 38050 GRENOBLE / FR | 02 /
LOPEZ, Josep SCHNEIDER ELECTRIC INDUSTRIES SAS, Propriété Industrielle Boîte Postale Cedex 09 World Trade Center 38EE1, 5 Place Robert Schuman / 38050 GRENOBLE / FR | [2017/44] | Representative(s) | Tripodi, Paul Schneider Electric Industries SAS Service Propriété Industrielle World Trade Center / 38EE1 5 Place Robert Schuman 38050 Grenoble Cedex 09 / FR | [2017/44] | Application number, filing date | 17160339.2 | 10.03.2017 | [2017/44] | Priority number, date | FR20160053904 | 29.04.2016 Original published format: FR 1653904 | [2017/44] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | EP3238805 | Date: | 01.11.2017 | Language: | FR | [2017/44] | Type: | B1 Patent specification | No.: | EP3238805 | Date: | 21.03.2018 | Language: | FR | [2018/12] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 21.09.2017 | Classification | IPC: | B01D46/00, B01D46/10, B01D46/44, B01D46/42, G01N21/00, F24F11/00 | [2017/44] | CPC: |
B01D46/10 (EP,US);
G01N15/08 (CN);
B01D46/0086 (EP);
B01D46/429 (EP);
F24F11/39 (EP,US);
G01N2015/084 (CN)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/51] |
Former [2017/44] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | HALTERUNG FÜR EINE EINHEIT ZUM MESSEN DES VERSCHMUTZUNGSNIVEAUS EINES FILTERS | [2017/44] | English: | SUPPORT FOR A FILTER CLOGGING MEASUREMENT LEVEL UNIT | [2017/44] | French: | SUPPORT POUR UNITÉ DE MESURE DU NIVEAU D'ENCRASSEMENT D'UN FILTRE | [2017/44] | Examination procedure | 10.03.2017 | Date on which the examining division has become responsible | 10.11.2017 | Examination requested [2017/51] | 16.01.2018 | Communication of intention to grant the patent | 05.02.2018 | Fee for grant paid | 05.02.2018 | Fee for publishing/printing paid | 05.02.2018 | Receipt of the translation of the claim(s) | Opposition(s) | 02.01.2019 | No opposition filed within time limit [2019/09] |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 10.03.2017 | AL | 21.03.2018 | AT | 21.03.2018 | CY | 21.03.2018 | CZ | 21.03.2018 | DK | 21.03.2018 | EE | 21.03.2018 | FI | 21.03.2018 | HR | 21.03.2018 | LT | 21.03.2018 | LV | 21.03.2018 | MC | 21.03.2018 | MK | 21.03.2018 | MT | 21.03.2018 | NL | 21.03.2018 | PL | 21.03.2018 | RO | 21.03.2018 | RS | 21.03.2018 | SE | 21.03.2018 | SI | 21.03.2018 | SK | 21.03.2018 | SM | 21.03.2018 | TR | 21.03.2018 | BG | 21.06.2018 | NO | 21.06.2018 | GR | 22.06.2018 | IS | 21.07.2018 | PT | 23.07.2018 | [2022/32] |
Former [2021/48] | HU | 10.03.2017 | |
AL | 21.03.2018 | ||
AT | 21.03.2018 | ||
CY | 21.03.2018 | ||
CZ | 21.03.2018 | ||
DK | 21.03.2018 | ||
EE | 21.03.2018 | ||
FI | 21.03.2018 | ||
HR | 21.03.2018 | ||
LT | 21.03.2018 | ||
LV | 21.03.2018 | ||
MC | 21.03.2018 | ||
MT | 21.03.2018 | ||
NL | 21.03.2018 | ||
PL | 21.03.2018 | ||
RO | 21.03.2018 | ||
RS | 21.03.2018 | ||
SE | 21.03.2018 | ||
SI | 21.03.2018 | ||
SK | 21.03.2018 | ||
SM | 21.03.2018 | ||
TR | 21.03.2018 | ||
BG | 21.06.2018 | ||
NO | 21.06.2018 | ||
GR | 22.06.2018 | ||
IS | 21.07.2018 | ||
PT | 23.07.2018 | ||
Former [2021/32] | HU | 10.03.2017 | |
AL | 21.03.2018 | ||
AT | 21.03.2018 | ||
CY | 21.03.2018 | ||
CZ | 21.03.2018 | ||
DK | 21.03.2018 | ||
EE | 21.03.2018 | ||
FI | 21.03.2018 | ||
HR | 21.03.2018 | ||
LT | 21.03.2018 | ||
LV | 21.03.2018 | ||
MC | 21.03.2018 | ||
MT | 21.03.2018 | ||
NL | 21.03.2018 | ||
PL | 21.03.2018 | ||
RO | 21.03.2018 | ||
RS | 21.03.2018 | ||
SE | 21.03.2018 | ||
SK | 21.03.2018 | ||
SM | 21.03.2018 | ||
TR | 21.03.2018 | ||
BG | 21.06.2018 | ||
NO | 21.06.2018 | ||
GR | 22.06.2018 | ||
IS | 21.07.2018 | ||
PT | 23.07.2018 | ||
Former [2021/31] | AL | 21.03.2018 | |
AT | 21.03.2018 | ||
CY | 21.03.2018 | ||
CZ | 21.03.2018 | ||
DK | 21.03.2018 | ||
EE | 21.03.2018 | ||
FI | 21.03.2018 | ||
HR | 21.03.2018 | ||
LT | 21.03.2018 | ||
LV | 21.03.2018 | ||
MC | 21.03.2018 | ||
MT | 21.03.2018 | ||
NL | 21.03.2018 | ||
PL | 21.03.2018 | ||
RO | 21.03.2018 | ||
RS | 21.03.2018 | ||
SE | 21.03.2018 | ||
SK | 21.03.2018 | ||
SM | 21.03.2018 | ||
TR | 21.03.2018 | ||
BG | 21.06.2018 | ||
NO | 21.06.2018 | ||
GR | 22.06.2018 | ||
IS | 21.07.2018 | ||
PT | 23.07.2018 | ||
Former [2020/16] | AL | 21.03.2018 | |
AT | 21.03.2018 | ||
CY | 21.03.2018 | ||
CZ | 21.03.2018 | ||
DK | 21.03.2018 | ||
EE | 21.03.2018 | ||
FI | 21.03.2018 | ||
HR | 21.03.2018 | ||
LT | 21.03.2018 | ||
LV | 21.03.2018 | ||
MC | 21.03.2018 | ||
MT | 21.03.2018 | ||
NL | 21.03.2018 | ||
PL | 21.03.2018 | ||
RO | 21.03.2018 | ||
RS | 21.03.2018 | ||
SE | 21.03.2018 | ||
SK | 21.03.2018 | ||
SM | 21.03.2018 | ||
TR | 21.03.2018 | ||
BG | 21.06.2018 | ||
NO | 21.06.2018 | ||
GR | 22.06.2018 | ||
PT | 23.07.2018 | ||
Former [2019/46] | AL | 21.03.2018 | |
AT | 21.03.2018 | ||
CY | 21.03.2018 | ||
CZ | 21.03.2018 | ||
DK | 21.03.2018 | ||
EE | 21.03.2018 | ||
FI | 21.03.2018 | ||
HR | 21.03.2018 | ||
LT | 21.03.2018 | ||
LV | 21.03.2018 | ||
MC | 21.03.2018 | ||
MT | 21.03.2018 | ||
NL | 21.03.2018 | ||
PL | 21.03.2018 | ||
RO | 21.03.2018 | ||
RS | 21.03.2018 | ||
SE | 21.03.2018 | ||
SK | 21.03.2018 | ||
SM | 21.03.2018 | ||
BG | 21.06.2018 | ||
NO | 21.06.2018 | ||
GR | 22.06.2018 | ||
PT | 23.07.2018 | ||
Former [2019/08] | AL | 21.03.2018 | |
AT | 21.03.2018 | ||
CY | 21.03.2018 | ||
CZ | 21.03.2018 | ||
DK | 21.03.2018 | ||
EE | 21.03.2018 | ||
FI | 21.03.2018 | ||
HR | 21.03.2018 | ||
LT | 21.03.2018 | ||
LV | 21.03.2018 | ||
MT | 21.03.2018 | ||
NL | 21.03.2018 | ||
PL | 21.03.2018 | ||
RO | 21.03.2018 | ||
RS | 21.03.2018 | ||
SE | 21.03.2018 | ||
SK | 21.03.2018 | ||
SM | 21.03.2018 | ||
BG | 21.06.2018 | ||
NO | 21.06.2018 | ||
GR | 22.06.2018 | ||
PT | 23.07.2018 | ||
Former [2019/03] | AL | 21.03.2018 | |
AT | 21.03.2018 | ||
CY | 21.03.2018 | ||
CZ | 21.03.2018 | ||
EE | 21.03.2018 | ||
FI | 21.03.2018 | ||
HR | 21.03.2018 | ||
LT | 21.03.2018 | ||
LV | 21.03.2018 | ||
MT | 21.03.2018 | ||
NL | 21.03.2018 | ||
PL | 21.03.2018 | ||
RO | 21.03.2018 | ||
RS | 21.03.2018 | ||
SE | 21.03.2018 | ||
SK | 21.03.2018 | ||
SM | 21.03.2018 | ||
BG | 21.06.2018 | ||
NO | 21.06.2018 | ||
GR | 22.06.2018 | ||
PT | 23.07.2018 | ||
Former [2018/52] | AL | 21.03.2018 | |
AT | 21.03.2018 | ||
CY | 21.03.2018 | ||
CZ | 21.03.2018 | ||
EE | 21.03.2018 | ||
FI | 21.03.2018 | ||
HR | 21.03.2018 | ||
LT | 21.03.2018 | ||
LV | 21.03.2018 | ||
MT | 21.03.2018 | ||
NL | 21.03.2018 | ||
PL | 21.03.2018 | ||
RO | 21.03.2018 | ||
RS | 21.03.2018 | ||
SE | 21.03.2018 | ||
SK | 21.03.2018 | ||
SM | 21.03.2018 | ||
BG | 21.06.2018 | ||
NO | 21.06.2018 | ||
GR | 22.06.2018 | ||
Former [2018/50] | AL | 21.03.2018 | |
AT | 21.03.2018 | ||
CY | 21.03.2018 | ||
CZ | 21.03.2018 | ||
EE | 21.03.2018 | ||
FI | 21.03.2018 | ||
HR | 21.03.2018 | ||
LT | 21.03.2018 | ||
LV | 21.03.2018 | ||
MT | 21.03.2018 | ||
NL | 21.03.2018 | ||
PL | 21.03.2018 | ||
RO | 21.03.2018 | ||
RS | 21.03.2018 | ||
SE | 21.03.2018 | ||
SK | 21.03.2018 | ||
BG | 21.06.2018 | ||
NO | 21.06.2018 | ||
GR | 22.06.2018 | ||
Former [2018/46] | AL | 21.03.2018 | |
CY | 21.03.2018 | ||
FI | 21.03.2018 | ||
HR | 21.03.2018 | ||
LT | 21.03.2018 | ||
LV | 21.03.2018 | ||
MT | 21.03.2018 | ||
NL | 21.03.2018 | ||
RS | 21.03.2018 | ||
SE | 21.03.2018 | ||
BG | 21.06.2018 | ||
NO | 21.06.2018 | ||
GR | 22.06.2018 | ||
Former [2018/45] | CY | 21.03.2018 | |
FI | 21.03.2018 | ||
HR | 21.03.2018 | ||
LT | 21.03.2018 | ||
LV | 21.03.2018 | ||
MT | 21.03.2018 | ||
NL | 21.03.2018 | ||
RS | 21.03.2018 | ||
SE | 21.03.2018 | ||
BG | 21.06.2018 | ||
NO | 21.06.2018 | ||
GR | 22.06.2018 | ||
Former [2018/43] | CY | 21.03.2018 | |
FI | 21.03.2018 | ||
HR | 21.03.2018 | ||
LT | 21.03.2018 | ||
LV | 21.03.2018 | ||
MT | 21.03.2018 | ||
RS | 21.03.2018 | ||
SE | 21.03.2018 | ||
BG | 21.06.2018 | ||
NO | 21.06.2018 | ||
GR | 22.06.2018 | ||
Former [2018/40] | CY | 21.03.2018 | |
FI | 21.03.2018 | ||
HR | 21.03.2018 | ||
LT | 21.03.2018 | ||
LV | 21.03.2018 | ||
RS | 21.03.2018 | ||
SE | 21.03.2018 | ||
BG | 21.06.2018 | ||
NO | 21.06.2018 | ||
GR | 22.06.2018 | ||
Former [2018/37] | CY | 21.03.2018 | |
FI | 21.03.2018 | ||
HR | 21.03.2018 | ||
LT | 21.03.2018 | ||
NO | 21.06.2018 | ||
GR | 22.06.2018 | ||
Former [2018/35] | CY | 21.03.2018 | |
FI | 21.03.2018 | ||
HR | 21.03.2018 | ||
LT | 21.03.2018 | ||
NO | 21.06.2018 | Documents cited: | Search | [A]US5141309 (WOERWAG PETER [CH]) [A] 1-12 * column 4, lines 15-17; figure 4 *; | [AP]EP3018423 (SAMSUNG ELECTRONICS CO LTD [KR]) [AP] 1-12* figure 6; claim 1 *; | [AP]EP3029388 (SCHNEIDER ELECTRIC IND SAS [FR]) [AP] 1-12 * figure 2; claims 1, 11 * | by applicant | US5141309 | US7012685 | WO2011131424 | US8744780 |