EP3217583 - DECODER AND METHOD FOR DECODING A SEQUENCE OF PACKETS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 18.06.2021 Database last updated on 26.06.2024 | |
Former | The patent has been granted Status updated on 10.07.2020 | ||
Former | Grant of patent is intended Status updated on 04.02.2020 | ||
Former | Request for examination was made Status updated on 20.04.2018 | ||
Former | The application has been published Status updated on 11.08.2017 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Fraunhofer-Gesellschaft zur Förderung der angewandten Forschung e.V. Hansastraße 27c 80686 München / DE | [2017/37] | Inventor(s) | 01 /
Sperschneider, Ralph Debert 75 91320 Ebermannstadt / DE | 02 /
Lutzky, Manfred Heinrich-von-Brentano-Straße 9 90427 Nürnberg / DE | 03 /
Schuldt, Michael Südliche Ingolstädter Straße 70 85716 Unterschleißheim / DE | 04 /
Schnell, Markus Labenwolfstr. 15 90409 Nürnberg / DE | 05 /
Gayer, Marc Falkenauer Str. 3 91058 Erlangen / DE | 06 /
Lohwasser, Markus Steinbergweg 3A 91217 Hersbruck / DE | [2020/33] |
Former [2017/37] | 01 /
Sperschneider, Ralph Debert 75 91320 Ebermannstadt / DE | ||
02 /
Lutzky, Manfred Heinrich-von-Brentano-Straße 9 90427 Nürnberg / DE | |||
03 /
Schuldt, Michael Südliche Ingolstädter Straße 70 85716 Unterschleißheim / DE | |||
04 /
Schnell, Markus Labenwolfstr. 15 90409 Nürnberg / DE | |||
05 /
Gayer, Marc Falkenauer Str. 3 91058 Falkenauer Str. 3 / DE | |||
06 /
Lohwasser, Markus Steinbergweg 3A 91217 Hersbruck / DE | Representative(s) | Zinkler, Franz, et al Schoppe, Zimmermann, Stöckeler Zinkler, Schenk & Partner mbB Patentanwälte Radlkoferstrasse 2 81373 München / DE | [2017/37] | Application number, filing date | 17160895.3 | 22.02.2008 | [2017/37] | Priority number, date | DE20071013315 | 20.03.2007 Original published format: DE102007013315 | DE20071018484 | 19.04.2007 Original published format: DE102007018484 | US20070912839P | 19.04.2007 Original published format: US 912839 P | [2017/37] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3217583 | Date: | 13.09.2017 | Language: | DE | [2017/37] | Type: | B1 Patent specification | No.: | EP3217583 | Date: | 12.08.2020 | Language: | DE | [2020/33] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 04.08.2017 | Classification | IPC: | H04L1/00 | [2017/37] | CPC: |
H04L1/0045 (EP,US);
H04L1/00 (KR);
H04L1/0084 (EP,US);
H04W28/04 (KR);
H04L2001/0097 (EP,US)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2018/16] |
Former [2017/37] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR | Title | German: | DECODIERER UND VERFAHREN ZUM DECODIEREN EINER FOLGE VON DATENPAKETEN | [2017/37] | English: | DECODER AND METHOD FOR DECODING A SEQUENCE OF PACKETS | [2017/37] | French: | DÉCODEUR ET PROCÉDÉ DE DÉCODAGE D'UNE SUITE DE PAQUETS DE DONNÉES | [2017/37] | Examination procedure | 14.03.2017 | Date on which the examining division has become responsible | 12.03.2018 | Amendment by applicant (claims and/or description) | 12.03.2018 | Examination requested [2018/21] | 20.02.2020 | Communication of intention to grant the patent | 26.06.2020 | Fee for grant paid | 26.06.2020 | Fee for publishing/printing paid | 26.06.2020 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP08715971.1 / EP2122888 | Opposition(s) | 14.05.2021 | No opposition filed within time limit [2021/29] | Fees paid | Renewal fee | 14.03.2017 | Renewal fee patent year 03 | 14.03.2017 | Renewal fee patent year 04 | 14.03.2017 | Renewal fee patent year 05 | 14.03.2017 | Renewal fee patent year 06 | 14.03.2017 | Renewal fee patent year 07 | 14.03.2017 | Renewal fee patent year 08 | 14.03.2017 | Renewal fee patent year 09 | 14.03.2017 | Renewal fee patent year 10 | 22.01.2018 | Renewal fee patent year 11 | 22.01.2019 | Renewal fee patent year 12 | 03.02.2020 | Renewal fee patent year 13 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 22.02.2008 | CY | 12.08.2020 | CZ | 12.08.2020 | DK | 12.08.2020 | EE | 12.08.2020 | ES | 12.08.2020 | FI | 12.08.2020 | HR | 12.08.2020 | IT | 12.08.2020 | LT | 12.08.2020 | LV | 12.08.2020 | MC | 12.08.2020 | NL | 12.08.2020 | PL | 12.08.2020 | RO | 12.08.2020 | SE | 12.08.2020 | SI | 12.08.2020 | SK | 12.08.2020 | TR | 12.08.2020 | BG | 12.11.2020 | NO | 12.11.2020 | GR | 13.11.2020 | IS | 12.12.2020 | PT | 14.12.2020 | AT | 22.02.2021 | IE | 22.02.2021 | LU | 22.02.2021 | BE | 28.02.2021 | CH | 28.02.2021 | LI | 28.02.2021 | [2024/29] |
Former [2023/27] | HU | 22.02.2008 | |
CY | 12.08.2020 | ||
CZ | 12.08.2020 | ||
DK | 12.08.2020 | ||
EE | 12.08.2020 | ||
ES | 12.08.2020 | ||
FI | 12.08.2020 | ||
HR | 12.08.2020 | ||
IT | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
MC | 12.08.2020 | ||
NL | 12.08.2020 | ||
PL | 12.08.2020 | ||
RO | 12.08.2020 | ||
SE | 12.08.2020 | ||
SI | 12.08.2020 | ||
SK | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IS | 12.12.2020 | ||
PT | 14.12.2020 | ||
AT | 22.02.2021 | ||
IE | 22.02.2021 | ||
LU | 22.02.2021 | ||
BE | 28.02.2021 | ||
CH | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2023/24] | CY | 12.08.2020 | |
CZ | 12.08.2020 | ||
DK | 12.08.2020 | ||
EE | 12.08.2020 | ||
ES | 12.08.2020 | ||
FI | 12.08.2020 | ||
HR | 12.08.2020 | ||
IT | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
MC | 12.08.2020 | ||
NL | 12.08.2020 | ||
PL | 12.08.2020 | ||
RO | 12.08.2020 | ||
SE | 12.08.2020 | ||
SI | 12.08.2020 | ||
SK | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IS | 12.12.2020 | ||
PT | 14.12.2020 | ||
AT | 22.02.2021 | ||
IE | 22.02.2021 | ||
LU | 22.02.2021 | ||
BE | 28.02.2021 | ||
CH | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2023/20] | CZ | 12.08.2020 | |
DK | 12.08.2020 | ||
EE | 12.08.2020 | ||
ES | 12.08.2020 | ||
FI | 12.08.2020 | ||
HR | 12.08.2020 | ||
IT | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
MC | 12.08.2020 | ||
NL | 12.08.2020 | ||
PL | 12.08.2020 | ||
RO | 12.08.2020 | ||
SE | 12.08.2020 | ||
SI | 12.08.2020 | ||
SK | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IS | 12.12.2020 | ||
PT | 14.12.2020 | ||
AT | 22.02.2021 | ||
IE | 22.02.2021 | ||
LU | 22.02.2021 | ||
BE | 28.02.2021 | ||
CH | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2022/34] | CZ | 12.08.2020 | |
DK | 12.08.2020 | ||
EE | 12.08.2020 | ||
ES | 12.08.2020 | ||
FI | 12.08.2020 | ||
HR | 12.08.2020 | ||
IT | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
MC | 12.08.2020 | ||
NL | 12.08.2020 | ||
PL | 12.08.2020 | ||
RO | 12.08.2020 | ||
SE | 12.08.2020 | ||
SI | 12.08.2020 | ||
SK | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IS | 12.12.2020 | ||
AT | 22.02.2021 | ||
IE | 22.02.2021 | ||
LU | 22.02.2021 | ||
BE | 28.02.2021 | ||
CH | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2022/21] | CZ | 12.08.2020 | |
DK | 12.08.2020 | ||
EE | 12.08.2020 | ||
ES | 12.08.2020 | ||
FI | 12.08.2020 | ||
HR | 12.08.2020 | ||
IT | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
MC | 12.08.2020 | ||
NL | 12.08.2020 | ||
PL | 12.08.2020 | ||
RO | 12.08.2020 | ||
SE | 12.08.2020 | ||
SI | 12.08.2020 | ||
SK | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IS | 12.12.2020 | ||
AT | 22.02.2021 | ||
IE | 22.02.2021 | ||
LU | 22.02.2021 | ||
CH | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2022/07] | CZ | 12.08.2020 | |
DK | 12.08.2020 | ||
EE | 12.08.2020 | ||
ES | 12.08.2020 | ||
FI | 12.08.2020 | ||
HR | 12.08.2020 | ||
IT | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
MC | 12.08.2020 | ||
NL | 12.08.2020 | ||
PL | 12.08.2020 | ||
RO | 12.08.2020 | ||
SE | 12.08.2020 | ||
SI | 12.08.2020 | ||
SK | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IS | 12.12.2020 | ||
IE | 22.02.2021 | ||
LU | 22.02.2021 | ||
CH | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2021/47] | CZ | 12.08.2020 | |
DK | 12.08.2020 | ||
EE | 12.08.2020 | ||
ES | 12.08.2020 | ||
FI | 12.08.2020 | ||
HR | 12.08.2020 | ||
IT | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
MC | 12.08.2020 | ||
NL | 12.08.2020 | ||
PL | 12.08.2020 | ||
RO | 12.08.2020 | ||
SE | 12.08.2020 | ||
SI | 12.08.2020 | ||
SK | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IS | 12.12.2020 | ||
LU | 22.02.2021 | ||
CH | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2021/41] | CZ | 12.08.2020 | |
DK | 12.08.2020 | ||
EE | 12.08.2020 | ||
ES | 12.08.2020 | ||
FI | 12.08.2020 | ||
HR | 12.08.2020 | ||
IT | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
MC | 12.08.2020 | ||
NL | 12.08.2020 | ||
PL | 12.08.2020 | ||
RO | 12.08.2020 | ||
SE | 12.08.2020 | ||
SI | 12.08.2020 | ||
SK | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IS | 12.12.2020 | ||
Former [2021/36] | CZ | 12.08.2020 | |
DK | 12.08.2020 | ||
EE | 12.08.2020 | ||
ES | 12.08.2020 | ||
FI | 12.08.2020 | ||
HR | 12.08.2020 | ||
IT | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
NL | 12.08.2020 | ||
PL | 12.08.2020 | ||
RO | 12.08.2020 | ||
SE | 12.08.2020 | ||
SI | 12.08.2020 | ||
SK | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IS | 12.12.2020 | ||
Former [2021/34] | CZ | 12.08.2020 | |
DK | 12.08.2020 | ||
EE | 12.08.2020 | ||
ES | 12.08.2020 | ||
FI | 12.08.2020 | ||
HR | 12.08.2020 | ||
IT | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
NL | 12.08.2020 | ||
PL | 12.08.2020 | ||
RO | 12.08.2020 | ||
SE | 12.08.2020 | ||
SK | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IS | 12.12.2020 | ||
Former [2021/28] | CZ | 12.08.2020 | |
DK | 12.08.2020 | ||
EE | 12.08.2020 | ||
ES | 12.08.2020 | ||
FI | 12.08.2020 | ||
HR | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
NL | 12.08.2020 | ||
PL | 12.08.2020 | ||
RO | 12.08.2020 | ||
SE | 12.08.2020 | ||
SK | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IS | 12.12.2020 | ||
Former [2021/25] | CZ | 12.08.2020 | |
DK | 12.08.2020 | ||
EE | 12.08.2020 | ||
ES | 12.08.2020 | ||
FI | 12.08.2020 | ||
HR | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
NL | 12.08.2020 | ||
PL | 12.08.2020 | ||
RO | 12.08.2020 | ||
SE | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IS | 12.12.2020 | ||
Former [2021/22] | CZ | 12.08.2020 | |
DK | 12.08.2020 | ||
EE | 12.08.2020 | ||
FI | 12.08.2020 | ||
HR | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
NL | 12.08.2020 | ||
PL | 12.08.2020 | ||
RO | 12.08.2020 | ||
SE | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IS | 12.12.2020 | ||
Former [2021/21] | DK | 12.08.2020 | |
FI | 12.08.2020 | ||
HR | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
NL | 12.08.2020 | ||
PL | 12.08.2020 | ||
SE | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IS | 12.12.2020 | ||
Former [2021/12] | FI | 12.08.2020 | |
HR | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
NL | 12.08.2020 | ||
PL | 12.08.2020 | ||
SE | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IS | 12.12.2020 | ||
Former [2021/10] | FI | 12.08.2020 | |
HR | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
PL | 12.08.2020 | ||
SE | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IS | 12.12.2020 | ||
Former [2021/09] | FI | 12.08.2020 | |
LT | 12.08.2020 | ||
SE | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
Former [2021/08] | FI | 12.08.2020 | |
LT | 12.08.2020 | ||
SE | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
Former [2021/07] | FI | 12.08.2020 | |
LT | 12.08.2020 | ||
NO | 12.11.2020 | Documents cited: | Search | [XI]WO9501682 (ERICSSON TELEFON AB L M [SE]) [X] 1,5,6 * page 4, line 4 - page 6, line 5 * * page 11, line 14 - page 14, line 32 * * figures 2,3 * [I] 2-4,7; | [A]EP0756267 (IBM [US]) [A] 1-7 * column 6, line 52 - column 7, line 12 * * column 8, line 40 - column 9, line 28 * * figures 1,4,5,7 *; | [XI]GB2306861 (MOTOROLA LTD [GB]) [X] 1,5,6 * page 1, line 18 - line 20 * * page 2, line 12 - line 23 * * page 3, line 12 - page 9, line 20 * * figures 3-6 * [I] 2-4,7; | [A]EP1458145 (MATSUSHITA ELECTRIC IND CO LTD [JP]) [A] 1-7 * page 2, paragraph 1 * * page 5, paragraph 43 - page 12; table 6 ** figures 1-5,9 *; | [A]US2005058145 (FLORENCIO DINEI A [US], et al) [A] 1-7 * page 8, paragraph 77 - paragraph 78 * * figure 4 *; | [A]EP1589330 (FUJITSU LTD [JP]) [A] 1-7 * page 2, paragraph 1 * * page 8, paragraph 61 - paragraph 65 * * page 14, paragraph 127 - page 15, paragraph 129 * * figures 2,14 * | by applicant | WO9501682 | EP0756267 | GB2306861 | EP1458145 | US2005058145 | EP1589330 |