EP3222373 - METHOD AND INSTALLATION FOR ADDITIVE MANUFACTURING OF METALLIC MOULDED BODY [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 15.11.2019 Database last updated on 11.05.2024 | |
Former | The patent has been granted Status updated on 07.12.2018 | ||
Former | Grant of patent is intended Status updated on 24.07.2018 | ||
Former | Request for examination was made Status updated on 23.03.2018 | ||
Former | The application has been published Status updated on 25.08.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states GEFERTEC GmbH Schwarze-Pumpe-Weg 16 12681 Berlin / DE | [2017/39] | Inventor(s) | 01 /
Fischer, Georg Parkstrasse 25 13129 Berlin / DE | 02 /
Röhrich, Tobias Frankfurter strasse 3 03185 Turnow-Preilack / DE | 03 /
Haschke, Igor Korsörer Straße 23 10437 Berlin / DE | [2019/01] |
Former [2017/39] | 01 /
Fischer, Georg Ketziner Weg 12 13589 Berlin / DE | ||
02 /
Röhrich, Tobias Corinthstraße 51 10245 Berlin / DE | |||
03 /
Haschke, Igor Korsörer Straße 23 10437 Berlin / DE | Representative(s) | Kaufmann, Sigfrid Kaufmann Patent- und Rechtsanwälte Loschwitzer Straße 42 01309 Dresden / DE | [2017/39] | Application number, filing date | 17160904.3 | 14.03.2017 | [2017/39] | Priority number, date | DE201610105162 | 21.03.2016 Original published format: DE102016105162 | [2017/39] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3222373 | Date: | 27.09.2017 | Language: | DE | [2017/39] | Type: | B1 Patent specification | No.: | EP3222373 | Date: | 09.01.2019 | Language: | DE | [2019/02] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 24.08.2017 | Classification | IPC: | B22F3/105, B22F3/115, B23K9/04, B23K9/23, B23K9/32, B23K26/00, B23K26/122, B23K26/12, B23K26/342, B23K26/70, B29C64/153, B29C64/245, B33Y10/00, B33Y30/00, B33Y40/00, // B29C64/25 | [2018/33] | CPC: |
B23K9/042 (EP,US);
B22F10/22 (EP,US);
B22F12/20 (EP,US);
B22F3/115 (EP);
B23K26/0006 (EP);
B23K26/1224 (EP);
B23K26/127 (EP);
B23K26/342 (EP);
B23K26/702 (EP);
B23K9/23 (EP);
B23K9/32 (EP);
B29C64/153 (EP);
B29C64/245 (EP);
B33Y10/00 (EP);
B33Y30/00 (EP);
B33Y40/00 (EP,US);
B22F10/70 (EP,US);
B22F2999/00 (EP);
| C-Set: |
B22F2999/00, B22F3/115, B22F3/003, B22F3/1028 (EP)
|
Former IPC [2017/39] | B22F3/105, B28B1/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/17] |
Former [2017/39] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VERFAHREN UND ANLAGE ZUR ADDITIVEN FERTIGUNG METALLISCHER FORMKÖRPER | [2017/39] | English: | METHOD AND INSTALLATION FOR ADDITIVE MANUFACTURING OF METALLIC MOULDED BODY | [2017/39] | French: | PROCÉDÉ ET INSTALLATION DE FABRICATION ADDITIVE DE CORPS MOULÉS EN MÉTAL | [2017/39] | Examination procedure | 14.03.2017 | Date on which the examining division has become responsible | 26.10.2017 | Amendment by applicant (claims and/or description) | 14.03.2018 | Examination requested [2018/17] | 25.07.2018 | Communication of intention to grant the patent | 20.11.2018 | Receipt of the translation of the claim(s) | 21.11.2018 | Fee for grant paid | 21.11.2018 | Fee for publishing/printing paid | Opposition(s) | 10.10.2019 | No opposition filed within time limit [2019/51] |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 14.03.2017 | AL | 09.01.2019 | CY | 09.01.2019 | CZ | 09.01.2019 | DK | 09.01.2019 | EE | 09.01.2019 | FI | 09.01.2019 | HR | 09.01.2019 | IT | 09.01.2019 | LT | 09.01.2019 | LV | 09.01.2019 | MC | 09.01.2019 | MK | 09.01.2019 | MT | 09.01.2019 | RO | 09.01.2019 | RS | 09.01.2019 | SE | 09.01.2019 | SI | 09.01.2019 | SK | 09.01.2019 | SM | 09.01.2019 | TR | 09.01.2019 | IE | 14.03.2019 | LU | 14.03.2019 | BG | 09.04.2019 | NO | 09.04.2019 | GR | 10.04.2019 | IS | 09.05.2019 | PT | 09.05.2019 | [2022/32] |
Former [2021/32] | HU | 14.03.2017 | |
AL | 09.01.2019 | ||
CY | 09.01.2019 | ||
CZ | 09.01.2019 | ||
DK | 09.01.2019 | ||
EE | 09.01.2019 | ||
FI | 09.01.2019 | ||
HR | 09.01.2019 | ||
IT | 09.01.2019 | ||
LT | 09.01.2019 | ||
LV | 09.01.2019 | ||
MC | 09.01.2019 | ||
MT | 09.01.2019 | ||
RO | 09.01.2019 | ||
RS | 09.01.2019 | ||
SE | 09.01.2019 | ||
SI | 09.01.2019 | ||
SK | 09.01.2019 | ||
SM | 09.01.2019 | ||
TR | 09.01.2019 | ||
IE | 14.03.2019 | ||
LU | 14.03.2019 | ||
BG | 09.04.2019 | ||
NO | 09.04.2019 | ||
GR | 10.04.2019 | ||
IS | 09.05.2019 | ||
PT | 09.05.2019 | ||
Former [2021/31] | AL | 09.01.2019 | |
CY | 09.01.2019 | ||
CZ | 09.01.2019 | ||
DK | 09.01.2019 | ||
EE | 09.01.2019 | ||
FI | 09.01.2019 | ||
HR | 09.01.2019 | ||
IT | 09.01.2019 | ||
LT | 09.01.2019 | ||
LV | 09.01.2019 | ||
MC | 09.01.2019 | ||
MT | 09.01.2019 | ||
RO | 09.01.2019 | ||
RS | 09.01.2019 | ||
SE | 09.01.2019 | ||
SI | 09.01.2019 | ||
SK | 09.01.2019 | ||
SM | 09.01.2019 | ||
TR | 09.01.2019 | ||
IE | 14.03.2019 | ||
LU | 14.03.2019 | ||
BG | 09.04.2019 | ||
NO | 09.04.2019 | ||
GR | 10.04.2019 | ||
IS | 09.05.2019 | ||
PT | 09.05.2019 | ||
Former [2021/26] | AL | 09.01.2019 | |
CY | 09.01.2019 | ||
CZ | 09.01.2019 | ||
DK | 09.01.2019 | ||
EE | 09.01.2019 | ||
FI | 09.01.2019 | ||
HR | 09.01.2019 | ||
IT | 09.01.2019 | ||
LT | 09.01.2019 | ||
LV | 09.01.2019 | ||
MC | 09.01.2019 | ||
MT | 09.01.2019 | ||
RO | 09.01.2019 | ||
RS | 09.01.2019 | ||
SE | 09.01.2019 | ||
SI | 09.01.2019 | ||
SK | 09.01.2019 | ||
TR | 09.01.2019 | ||
IE | 14.03.2019 | ||
LU | 14.03.2019 | ||
BG | 09.04.2019 | ||
NO | 09.04.2019 | ||
GR | 10.04.2019 | ||
IS | 09.05.2019 | ||
PT | 09.05.2019 | ||
Former [2020/29] | AL | 09.01.2019 | |
CZ | 09.01.2019 | ||
DK | 09.01.2019 | ||
EE | 09.01.2019 | ||
FI | 09.01.2019 | ||
HR | 09.01.2019 | ||
IT | 09.01.2019 | ||
LT | 09.01.2019 | ||
LV | 09.01.2019 | ||
MC | 09.01.2019 | ||
MT | 09.01.2019 | ||
RO | 09.01.2019 | ||
RS | 09.01.2019 | ||
SE | 09.01.2019 | ||
SI | 09.01.2019 | ||
SK | 09.01.2019 | ||
TR | 09.01.2019 | ||
IE | 14.03.2019 | ||
LU | 14.03.2019 | ||
BG | 09.04.2019 | ||
NO | 09.04.2019 | ||
GR | 10.04.2019 | ||
IS | 09.05.2019 | ||
PT | 09.05.2019 | ||
Former [2020/17] | AL | 09.01.2019 | |
CZ | 09.01.2019 | ||
DK | 09.01.2019 | ||
EE | 09.01.2019 | ||
FI | 09.01.2019 | ||
HR | 09.01.2019 | ||
IT | 09.01.2019 | ||
LT | 09.01.2019 | ||
LV | 09.01.2019 | ||
MC | 09.01.2019 | ||
RO | 09.01.2019 | ||
RS | 09.01.2019 | ||
SE | 09.01.2019 | ||
SI | 09.01.2019 | ||
SK | 09.01.2019 | ||
TR | 09.01.2019 | ||
IE | 14.03.2019 | ||
LU | 14.03.2019 | ||
BG | 09.04.2019 | ||
NO | 09.04.2019 | ||
GR | 10.04.2019 | ||
IS | 09.05.2019 | ||
PT | 09.05.2019 | ||
Former [2020/13] | AL | 09.01.2019 | |
CZ | 09.01.2019 | ||
DK | 09.01.2019 | ||
EE | 09.01.2019 | ||
FI | 09.01.2019 | ||
HR | 09.01.2019 | ||
IT | 09.01.2019 | ||
LT | 09.01.2019 | ||
LV | 09.01.2019 | ||
MC | 09.01.2019 | ||
RO | 09.01.2019 | ||
RS | 09.01.2019 | ||
SE | 09.01.2019 | ||
SI | 09.01.2019 | ||
SK | 09.01.2019 | ||
IE | 14.03.2019 | ||
LU | 14.03.2019 | ||
BG | 09.04.2019 | ||
NO | 09.04.2019 | ||
GR | 10.04.2019 | ||
IS | 09.05.2019 | ||
PT | 09.05.2019 | ||
Former [2020/09] | AL | 09.01.2019 | |
CZ | 09.01.2019 | ||
DK | 09.01.2019 | ||
EE | 09.01.2019 | ||
FI | 09.01.2019 | ||
HR | 09.01.2019 | ||
IT | 09.01.2019 | ||
LT | 09.01.2019 | ||
LV | 09.01.2019 | ||
MC | 09.01.2019 | ||
RO | 09.01.2019 | ||
RS | 09.01.2019 | ||
SE | 09.01.2019 | ||
SK | 09.01.2019 | ||
IE | 14.03.2019 | ||
LU | 14.03.2019 | ||
BG | 09.04.2019 | ||
NO | 09.04.2019 | ||
GR | 10.04.2019 | ||
IS | 09.05.2019 | ||
PT | 09.05.2019 | ||
Former [2020/01] | AL | 09.01.2019 | |
CZ | 09.01.2019 | ||
DK | 09.01.2019 | ||
EE | 09.01.2019 | ||
FI | 09.01.2019 | ||
HR | 09.01.2019 | ||
IT | 09.01.2019 | ||
LT | 09.01.2019 | ||
LV | 09.01.2019 | ||
MC | 09.01.2019 | ||
RO | 09.01.2019 | ||
RS | 09.01.2019 | ||
SE | 09.01.2019 | ||
SK | 09.01.2019 | ||
LU | 14.03.2019 | ||
BG | 09.04.2019 | ||
NO | 09.04.2019 | ||
GR | 10.04.2019 | ||
IS | 09.05.2019 | ||
PT | 09.05.2019 | ||
Former [2019/49] | AL | 09.01.2019 | |
CZ | 09.01.2019 | ||
DK | 09.01.2019 | ||
EE | 09.01.2019 | ||
FI | 09.01.2019 | ||
HR | 09.01.2019 | ||
IT | 09.01.2019 | ||
LT | 09.01.2019 | ||
LV | 09.01.2019 | ||
MC | 09.01.2019 | ||
RO | 09.01.2019 | ||
RS | 09.01.2019 | ||
SE | 09.01.2019 | ||
SK | 09.01.2019 | ||
BG | 09.04.2019 | ||
NO | 09.04.2019 | ||
GR | 10.04.2019 | ||
IS | 09.05.2019 | ||
PT | 09.05.2019 | ||
Former [2019/48] | DK | 09.01.2019 | |
FI | 09.01.2019 | ||
HR | 09.01.2019 | ||
IT | 09.01.2019 | ||
LT | 09.01.2019 | ||
LV | 09.01.2019 | ||
MC | 09.01.2019 | ||
RS | 09.01.2019 | ||
SE | 09.01.2019 | ||
BG | 09.04.2019 | ||
NO | 09.04.2019 | ||
GR | 10.04.2019 | ||
IS | 09.05.2019 | ||
PT | 09.05.2019 | ||
Former [2019/46] | FI | 09.01.2019 | |
HR | 09.01.2019 | ||
IT | 09.01.2019 | ||
LT | 09.01.2019 | ||
LV | 09.01.2019 | ||
MC | 09.01.2019 | ||
RS | 09.01.2019 | ||
SE | 09.01.2019 | ||
BG | 09.04.2019 | ||
NO | 09.04.2019 | ||
GR | 10.04.2019 | ||
IS | 09.05.2019 | ||
PT | 09.05.2019 | ||
Former [2019/39] | FI | 09.01.2019 | |
HR | 09.01.2019 | ||
LT | 09.01.2019 | ||
LV | 09.01.2019 | ||
RS | 09.01.2019 | ||
SE | 09.01.2019 | ||
BG | 09.04.2019 | ||
NO | 09.04.2019 | ||
GR | 10.04.2019 | ||
IS | 09.05.2019 | ||
PT | 09.05.2019 | ||
Former [2019/38] | FI | 09.01.2019 | |
LT | 09.01.2019 | ||
SE | 09.01.2019 | ||
BG | 09.04.2019 | ||
NO | 09.04.2019 | ||
GR | 10.04.2019 | ||
PT | 09.05.2019 | ||
Former [2019/37] | FI | 09.01.2019 | |
LT | 09.01.2019 | ||
SE | 09.01.2019 | ||
NO | 09.04.2019 | ||
GR | 10.04.2019 | ||
PT | 09.05.2019 | ||
Former [2019/34] | FI | 09.01.2019 | |
LT | 09.01.2019 | ||
SE | 09.01.2019 | ||
NO | 09.04.2019 | ||
PT | 09.05.2019 | ||
Former [2019/33] | FI | 09.01.2019 | |
LT | 09.01.2019 | ||
NO | 09.04.2019 | ||
PT | 09.05.2019 | Documents cited: | Search | [A]EP1316408 (CONCEPT LASER GMBH [DE]) [A] 11 * paragraph [0005] ** figure 1 *; | [XA]EP1669143 (3D SYSTEMS INC [US]) [X] 1-5 * claims 1, 11, 20, 21 * * paragraphs [0030] , [0 33] , [0 34] * * figures 3, 4 * [A] 6-13; | [XA]US2011165339 (SKOGLUND PETER [SE], et al) [X] 1-4 * claim 1 * * paragraphs [0019] , [0 44] * * figure 3 * [A] 5-13; | [XA]CN104399978 (UNIV SOUTH CHINA TECH) [X] 1 * paragraphs [0025] , [0 28] * [A] 2-13; | [XAI]EP2992986 (SLM SOLUTIONS GROUP AG [DE]) [X] 1-5,7,8,11 * claim 7 * * paragraphs [0042] - [0044] * * figure 1 * [A] 6,12,13 [I] 9,10 | by applicant | DE102007009273 | US2015108095 | DE102013022056 |