EP3220201 - CARTRIDGE UNIT AND ELECTROPHOTOGRAPHIC IMAGE FORMING APPARATUS INCLUDING THE SAME [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 02.09.2022 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 24.09.2021 | ||
Former | Grant of patent is intended Status updated on 09.08.2021 | ||
Former | Examination is in progress Status updated on 08.05.2021 | ||
Former | Request for examination was made Status updated on 18.08.2017 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Hewlett-Packard Development Company, L.P. 10300 Energy Drive Spring, TX 77389 / US | [2021/43] |
Former [2019/49] | For all designated states Hewlett-Packard Development Company, L.P. 10300 Energy Drive Spring Texas 77389 / US | ||
Former [2018/25] | For all designated states HP Printing Korea Co., Ltd. 129, Samsung-ro Yeongtong-gu Suwon-si Gyeonggi-do 16677 / KR | ||
Former [2017/38] | For all designated states S-Printing Solution Co., Ltd. 129, Samsung-ro Yeongtong-gu Suwon-si Gyeonggi-do 16677 / KR | Inventor(s) | 01 /
LEE, Sang-hoon 108-2302, 246, Gwongwang-ro, Paldal-gu Gyeonggi-do Suwon-si / KR | 02 /
LEE, Seung-gweon 212-402, 28, Jungbu-daero 448beon-gil Yeongtong-gu, Gyeonggi-do Suwon-si / KR | [2017/38] | Representative(s) | Appleyard Lees IP LLP 15 Clare Road Halifax HX1 2HY / GB | [2017/38] | Application number, filing date | 17160925.8 | 21.01.2015 | [2017/38] | Priority number, date | KR20140019693 | 20.02.2014 Original published format: KR 20140019693 | [2017/38] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3220201 | Date: | 20.09.2017 | Language: | EN | [2017/38] | Type: | B1 Patent specification | No.: | EP3220201 | Date: | 27.10.2021 | Language: | EN | [2021/43] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 18.08.2017 | Classification | IPC: | G03G15/08 | [2017/38] | CPC: |
G03G15/0886 (EP,US);
G03G2215/0668 (US);
G03G2215/0692 (US);
G03G2221/169 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/12] |
Former [2017/38] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | KARTUSCHENEINHEIT UND ELEKTROFOTOGRAFISCHE BILDERZEUGUNGSVORRICHTUNG DAMIT | [2017/38] | English: | CARTRIDGE UNIT AND ELECTROPHOTOGRAPHIC IMAGE FORMING APPARATUS INCLUDING THE SAME | [2017/38] | French: | UNITÉ DE CARTOUCHE ET APPAREIL DE FORMATION D'IMAGES ÉLECTROPHOTOGRAPHIQUES L'UTILISANT | [2017/38] | Examination procedure | 14.03.2017 | Examination requested [2017/38] | 14.03.2017 | Date on which the examining division has become responsible | 21.12.2017 | Amendment by applicant (claims and/or description) | 07.05.2021 | Despatch of a communication from the examining division (Time limit: M04) | 13.07.2021 | Reply to a communication from the examining division | 10.08.2021 | Communication of intention to grant the patent | 15.09.2021 | Fee for grant paid | 15.09.2021 | Fee for publishing/printing paid | 15.09.2021 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP15152004.6 / EP2911005 | Opposition(s) | 28.07.2022 | No opposition filed within time limit [2022/40] | Fees paid | Renewal fee | 14.03.2017 | Renewal fee patent year 03 | 24.01.2018 | Renewal fee patent year 04 | 24.01.2019 | Renewal fee patent year 05 | 21.01.2020 | Renewal fee patent year 06 | 20.01.2021 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 21.01.2015 | AL | 27.10.2021 | AT | 27.10.2021 | CY | 27.10.2021 | CZ | 27.10.2021 | DK | 27.10.2021 | EE | 27.10.2021 | ES | 27.10.2021 | FI | 27.10.2021 | HR | 27.10.2021 | IT | 27.10.2021 | LT | 27.10.2021 | LV | 27.10.2021 | MC | 27.10.2021 | MK | 27.10.2021 | MT | 27.10.2021 | NL | 27.10.2021 | PL | 27.10.2021 | RO | 27.10.2021 | RS | 27.10.2021 | SE | 27.10.2021 | SI | 27.10.2021 | SK | 27.10.2021 | SM | 27.10.2021 | TR | 27.10.2021 | IE | 21.01.2022 | LU | 21.01.2022 | BG | 27.01.2022 | NO | 27.01.2022 | GR | 28.01.2022 | BE | 31.01.2022 | CH | 31.01.2022 | LI | 31.01.2022 | IS | 27.02.2022 | PT | 28.02.2022 | [2024/42] |
Former [2024/29] | HU | 21.01.2015 | |
AL | 27.10.2021 | ||
AT | 27.10.2021 | ||
CY | 27.10.2021 | ||
CZ | 27.10.2021 | ||
DK | 27.10.2021 | ||
EE | 27.10.2021 | ||
ES | 27.10.2021 | ||
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
IT | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
MC | 27.10.2021 | ||
MK | 27.10.2021 | ||
NL | 27.10.2021 | ||
PL | 27.10.2021 | ||
RO | 27.10.2021 | ||
RS | 27.10.2021 | ||
SE | 27.10.2021 | ||
SI | 27.10.2021 | ||
SK | 27.10.2021 | ||
SM | 27.10.2021 | ||
TR | 27.10.2021 | ||
IE | 21.01.2022 | ||
LU | 21.01.2022 | ||
BG | 27.01.2022 | ||
NO | 27.01.2022 | ||
GR | 28.01.2022 | ||
BE | 31.01.2022 | ||
CH | 31.01.2022 | ||
LI | 31.01.2022 | ||
IS | 27.02.2022 | ||
PT | 28.02.2022 | ||
Former [2024/22] | HU | 21.01.2015 | |
AL | 27.10.2021 | ||
AT | 27.10.2021 | ||
CY | 27.10.2021 | ||
CZ | 27.10.2021 | ||
DK | 27.10.2021 | ||
EE | 27.10.2021 | ||
ES | 27.10.2021 | ||
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
IT | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
MC | 27.10.2021 | ||
MK | 27.10.2021 | ||
NL | 27.10.2021 | ||
PL | 27.10.2021 | ||
RO | 27.10.2021 | ||
RS | 27.10.2021 | ||
SE | 27.10.2021 | ||
SI | 27.10.2021 | ||
SK | 27.10.2021 | ||
SM | 27.10.2021 | ||
IE | 21.01.2022 | ||
LU | 21.01.2022 | ||
BG | 27.01.2022 | ||
NO | 27.01.2022 | ||
GR | 28.01.2022 | ||
BE | 31.01.2022 | ||
CH | 31.01.2022 | ||
LI | 31.01.2022 | ||
IS | 27.02.2022 | ||
PT | 28.02.2022 | ||
Former [2024/20] | HU | 21.01.2015 | |
AL | 27.10.2021 | ||
AT | 27.10.2021 | ||
CY | 27.10.2021 | ||
CZ | 27.10.2021 | ||
DK | 27.10.2021 | ||
EE | 27.10.2021 | ||
ES | 27.10.2021 | ||
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
IT | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
MC | 27.10.2021 | ||
NL | 27.10.2021 | ||
PL | 27.10.2021 | ||
RO | 27.10.2021 | ||
RS | 27.10.2021 | ||
SE | 27.10.2021 | ||
SI | 27.10.2021 | ||
SK | 27.10.2021 | ||
SM | 27.10.2021 | ||
IE | 21.01.2022 | ||
LU | 21.01.2022 | ||
BG | 27.01.2022 | ||
NO | 27.01.2022 | ||
GR | 28.01.2022 | ||
BE | 31.01.2022 | ||
CH | 31.01.2022 | ||
LI | 31.01.2022 | ||
IS | 27.02.2022 | ||
PT | 28.02.2022 | ||
Former [2024/18] | HU | 21.01.2015 | |
AL | 27.10.2021 | ||
AT | 27.10.2021 | ||
CZ | 27.10.2021 | ||
DK | 27.10.2021 | ||
EE | 27.10.2021 | ||
ES | 27.10.2021 | ||
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
IT | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
MC | 27.10.2021 | ||
NL | 27.10.2021 | ||
PL | 27.10.2021 | ||
RO | 27.10.2021 | ||
RS | 27.10.2021 | ||
SE | 27.10.2021 | ||
SI | 27.10.2021 | ||
SK | 27.10.2021 | ||
SM | 27.10.2021 | ||
IE | 21.01.2022 | ||
LU | 21.01.2022 | ||
BG | 27.01.2022 | ||
NO | 27.01.2022 | ||
GR | 28.01.2022 | ||
BE | 31.01.2022 | ||
CH | 31.01.2022 | ||
LI | 31.01.2022 | ||
IS | 27.02.2022 | ||
PT | 28.02.2022 | ||
Former [2023/27] | AL | 27.10.2021 | |
AT | 27.10.2021 | ||
CZ | 27.10.2021 | ||
DK | 27.10.2021 | ||
EE | 27.10.2021 | ||
ES | 27.10.2021 | ||
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
IT | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
MC | 27.10.2021 | ||
NL | 27.10.2021 | ||
PL | 27.10.2021 | ||
RO | 27.10.2021 | ||
RS | 27.10.2021 | ||
SE | 27.10.2021 | ||
SI | 27.10.2021 | ||
SK | 27.10.2021 | ||
SM | 27.10.2021 | ||
IE | 21.01.2022 | ||
LU | 21.01.2022 | ||
BG | 27.01.2022 | ||
NO | 27.01.2022 | ||
GR | 28.01.2022 | ||
BE | 31.01.2022 | ||
CH | 31.01.2022 | ||
LI | 31.01.2022 | ||
IS | 27.02.2022 | ||
PT | 28.02.2022 | ||
Former [2023/09] | AL | 27.10.2021 | |
AT | 27.10.2021 | ||
CZ | 27.10.2021 | ||
DK | 27.10.2021 | ||
EE | 27.10.2021 | ||
ES | 27.10.2021 | ||
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
MC | 27.10.2021 | ||
NL | 27.10.2021 | ||
PL | 27.10.2021 | ||
RO | 27.10.2021 | ||
RS | 27.10.2021 | ||
SE | 27.10.2021 | ||
SI | 27.10.2021 | ||
SK | 27.10.2021 | ||
SM | 27.10.2021 | ||
IE | 21.01.2022 | ||
LU | 21.01.2022 | ||
BG | 27.01.2022 | ||
NO | 27.01.2022 | ||
GR | 28.01.2022 | ||
BE | 31.01.2022 | ||
CH | 31.01.2022 | ||
LI | 31.01.2022 | ||
IS | 27.02.2022 | ||
PT | 28.02.2022 | ||
Former [2023/03] | AL | 27.10.2021 | |
AT | 27.10.2021 | ||
CZ | 27.10.2021 | ||
DK | 27.10.2021 | ||
EE | 27.10.2021 | ||
ES | 27.10.2021 | ||
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
MC | 27.10.2021 | ||
NL | 27.10.2021 | ||
PL | 27.10.2021 | ||
RO | 27.10.2021 | ||
RS | 27.10.2021 | ||
SE | 27.10.2021 | ||
SI | 27.10.2021 | ||
SK | 27.10.2021 | ||
SM | 27.10.2021 | ||
LU | 21.01.2022 | ||
BG | 27.01.2022 | ||
NO | 27.01.2022 | ||
GR | 28.01.2022 | ||
BE | 31.01.2022 | ||
CH | 31.01.2022 | ||
LI | 31.01.2022 | ||
IS | 27.02.2022 | ||
PT | 28.02.2022 | ||
Former [2023/01] | AL | 27.10.2021 | |
AT | 27.10.2021 | ||
CZ | 27.10.2021 | ||
DK | 27.10.2021 | ||
EE | 27.10.2021 | ||
ES | 27.10.2021 | ||
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
MC | 27.10.2021 | ||
NL | 27.10.2021 | ||
PL | 27.10.2021 | ||
RO | 27.10.2021 | ||
RS | 27.10.2021 | ||
SE | 27.10.2021 | ||
SI | 27.10.2021 | ||
SK | 27.10.2021 | ||
SM | 27.10.2021 | ||
LU | 21.01.2022 | ||
BG | 27.01.2022 | ||
NO | 27.01.2022 | ||
GR | 28.01.2022 | ||
BE | 31.01.2022 | ||
IS | 27.02.2022 | ||
PT | 28.02.2022 | ||
Former [2022/49] | AL | 27.10.2021 | |
AT | 27.10.2021 | ||
CZ | 27.10.2021 | ||
DK | 27.10.2021 | ||
EE | 27.10.2021 | ||
ES | 27.10.2021 | ||
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
MC | 27.10.2021 | ||
NL | 27.10.2021 | ||
PL | 27.10.2021 | ||
RO | 27.10.2021 | ||
RS | 27.10.2021 | ||
SE | 27.10.2021 | ||
SK | 27.10.2021 | ||
SM | 27.10.2021 | ||
LU | 21.01.2022 | ||
BG | 27.01.2022 | ||
NO | 27.01.2022 | ||
GR | 28.01.2022 | ||
IS | 27.02.2022 | ||
PT | 28.02.2022 | ||
Former [2022/46] | AT | 27.10.2021 | |
CZ | 27.10.2021 | ||
DK | 27.10.2021 | ||
EE | 27.10.2021 | ||
ES | 27.10.2021 | ||
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
MC | 27.10.2021 | ||
NL | 27.10.2021 | ||
PL | 27.10.2021 | ||
RO | 27.10.2021 | ||
RS | 27.10.2021 | ||
SE | 27.10.2021 | ||
SK | 27.10.2021 | ||
SM | 27.10.2021 | ||
LU | 21.01.2022 | ||
BG | 27.01.2022 | ||
NO | 27.01.2022 | ||
GR | 28.01.2022 | ||
IS | 27.02.2022 | ||
PT | 28.02.2022 | ||
Former [2022/39] | AT | 27.10.2021 | |
CZ | 27.10.2021 | ||
DK | 27.10.2021 | ||
EE | 27.10.2021 | ||
ES | 27.10.2021 | ||
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
MC | 27.10.2021 | ||
NL | 27.10.2021 | ||
PL | 27.10.2021 | ||
RO | 27.10.2021 | ||
RS | 27.10.2021 | ||
SE | 27.10.2021 | ||
SK | 27.10.2021 | ||
SM | 27.10.2021 | ||
BG | 27.01.2022 | ||
NO | 27.01.2022 | ||
GR | 28.01.2022 | ||
IS | 27.02.2022 | ||
PT | 28.02.2022 | ||
Former [2022/35] | AT | 27.10.2021 | |
CZ | 27.10.2021 | ||
DK | 27.10.2021 | ||
EE | 27.10.2021 | ||
ES | 27.10.2021 | ||
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
NL | 27.10.2021 | ||
PL | 27.10.2021 | ||
RO | 27.10.2021 | ||
RS | 27.10.2021 | ||
SE | 27.10.2021 | ||
SK | 27.10.2021 | ||
SM | 27.10.2021 | ||
BG | 27.01.2022 | ||
NO | 27.01.2022 | ||
GR | 28.01.2022 | ||
IS | 27.02.2022 | ||
PT | 28.02.2022 | ||
Former [2022/34] | AT | 27.10.2021 | |
EE | 27.10.2021 | ||
ES | 27.10.2021 | ||
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
NL | 27.10.2021 | ||
PL | 27.10.2021 | ||
RO | 27.10.2021 | ||
RS | 27.10.2021 | ||
SE | 27.10.2021 | ||
SM | 27.10.2021 | ||
BG | 27.01.2022 | ||
NO | 27.01.2022 | ||
GR | 28.01.2022 | ||
IS | 27.02.2022 | ||
PT | 28.02.2022 | ||
Former [2022/33] | AT | 27.10.2021 | |
ES | 27.10.2021 | ||
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
NL | 27.10.2021 | ||
PL | 27.10.2021 | ||
RS | 27.10.2021 | ||
SE | 27.10.2021 | ||
SM | 27.10.2021 | ||
BG | 27.01.2022 | ||
NO | 27.01.2022 | ||
GR | 28.01.2022 | ||
IS | 27.02.2022 | ||
PT | 28.02.2022 | ||
Former [2022/25] | AT | 27.10.2021 | |
ES | 27.10.2021 | ||
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
NL | 27.10.2021 | ||
PL | 27.10.2021 | ||
RS | 27.10.2021 | ||
SE | 27.10.2021 | ||
BG | 27.01.2022 | ||
NO | 27.01.2022 | ||
GR | 28.01.2022 | ||
IS | 27.02.2022 | ||
PT | 28.02.2022 | ||
Former [2022/24] | AT | 27.10.2021 | |
ES | 27.10.2021 | ||
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
NL | 27.10.2021 | ||
PL | 27.10.2021 | ||
RS | 27.10.2021 | ||
SE | 27.10.2021 | ||
BG | 27.01.2022 | ||
GR | 28.01.2022 | ||
IS | 27.02.2022 | ||
PT | 28.02.2022 | ||
Former [2022/23] | AT | 27.10.2021 | |
ES | 27.10.2021 | ||
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
PL | 27.10.2021 | ||
RS | 27.10.2021 | ||
BG | 27.01.2022 | ||
PT | 28.02.2022 | ||
Former [2022/22] | AT | 27.10.2021 | |
FI | 27.10.2021 | ||
LT | 27.10.2021 | ||
RS | 27.10.2021 | ||
BG | 27.01.2022 | ||
Former [2022/21] | AT | 27.10.2021 | |
RS | 27.10.2021 | ||
BG | 27.01.2022 | ||
Former [2022/19] | BG | 27.01.2022 | Documents cited: | Search | [YD]EP0374920 (CASIO COMPUTER CO LTD [JP], et al) [YD] 6,8 * column 23, line 18 - column 25, line 8; figures 2,28-32, 37 * * column 26, line 22 - line 48 *; | [XDI]JP2008052033 (CANON KK) [XD] 1-4,6,9,11,12 * abstract * * paragraph [0054] * [I] 8; | [ID]US2009129824 (YOSHIMOTO YUHSUKE [JP], et al) [ID] 1* paragraphs [0041] - [0043] - [0 65]; figures 1, 2 *; | [XYI]EP2290461 (SAMSUNG ELECTRONICS CO LTD [KR]) [X] 1-4,7,9-12 * paragraph [0046] - paragraph [0049]; figures 7,8 * [Y] 6,8 [I] 5 | by applicant | EP0374920 | JP2008052033 | US2009129824 | US2013243445 |