blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3376141

EP3376141 - ASSEMBLY AND METHOD FOR PROCESSING FISH [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  01.01.2021
Database last updated on 06.07.2024
FormerThe patent has been granted
Status updated on  24.01.2020
FormerGrant of patent is intended
Status updated on  20.01.2020
FormerRequest for examination was made
Status updated on  18.12.2019
FormerGrant of patent is intended
Status updated on  07.08.2019
FormerRequest for examination was made
Status updated on  22.03.2019
FormerThe application has been published
Status updated on  17.08.2018
Most recent event   Tooltip15.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 17.08.2022  [2022/33]
Applicant(s)For all designated states
Nordischer Maschinenbau Rud. Baader GmbH + Co. KG
Geniner Strasse 249
23560 Lübeck / DE
[2018/38]
Inventor(s)01 / Jacobsen, Ulf
Kornrade 36 a
23611 Bad Schwartau / DE
 [2018/38]
Representative(s)Stork Bamberger Patentanwälte PartmbB
Meiendorfer Strasse 89
22145 Hamburg / DE
[2018/38]
Application number, filing date17161101.515.03.2017
[2018/38]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3376141
Date:19.09.2018
Language:DE
[2018/38]
Type: B1 Patent specification 
No.:EP3376141
Date:26.02.2020
Language:DE
[2020/09]
Search report(s)(Supplementary) European search report - dispatched on:EP11.10.2017
ClassificationIPC:F25D13/06, A22C25/08, A23B4/06, A22B5/00
[2018/38]
CPC:
A22C25/08 (EP,DK,RU); F25D13/06 (DK); A22B5/00 (DK);
A22B5/0076 (EP,RU); A23B4/06 (DK); F25D13/065 (EP,RU)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/17]
Former [2018/38]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:ANORDNUNG UND VERFAHREN ZUR VERARBEITUNG VON FISCHEN[2018/38]
English:ASSEMBLY AND METHOD FOR PROCESSING FISH[2018/38]
French:AGENCEMENT ET PROCÉDÉ DESTINÉS À LA PRÉPARATION DE POISSONS[2018/38]
Examination procedure19.03.2019Examination requested  [2019/17]
19.03.2019Date on which the examining division has become responsible
08.08.2019Communication of intention to grant the patent
17.12.2019Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
17.12.2019Fee for grant paid
17.12.2019Fee for publishing/printing paid
20.01.2020Information about intention to grant a patent
20.01.2020Receipt of the translation of the claim(s)
Opposition(s)27.11.2020No opposition filed within time limit [2021/05]
Fees paidRenewal fee
26.03.2019Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU15.03.2017
AL26.02.2020
CY26.02.2020
CZ26.02.2020
DK26.02.2020
EE26.02.2020
ES26.02.2020
FI26.02.2020
HR26.02.2020
IT26.02.2020
LT26.02.2020
LV26.02.2020
MC26.02.2020
MK26.02.2020
MT26.02.2020
NL26.02.2020
PL26.02.2020
RO26.02.2020
RS26.02.2020
SE26.02.2020
SI26.02.2020
SK26.02.2020
SM26.02.2020
TR26.02.2020
LU15.03.2020
BE31.03.2020
CH31.03.2020
LI31.03.2020
FR26.04.2020
BG26.05.2020
GR27.05.2020
PT19.07.2020
[2022/31]
Former [2022/30]HU15.03.2017
AL26.02.2020
CY26.02.2020
CZ26.02.2020
DK26.02.2020
EE26.02.2020
ES26.02.2020
FI26.02.2020
HR26.02.2020
IT26.02.2020
LT26.02.2020
LV26.02.2020
MC26.02.2020
MT26.02.2020
NL26.02.2020
PL26.02.2020
RO26.02.2020
RS26.02.2020
SE26.02.2020
SI26.02.2020
SK26.02.2020
SM26.02.2020
TR26.02.2020
LU15.03.2020
BE31.03.2020
CH31.03.2020
LI31.03.2020
FR26.04.2020
BG26.05.2020
GR27.05.2020
PT19.07.2020
Former [2022/27]HU15.03.2017
CY26.02.2020
CZ26.02.2020
DK26.02.2020
EE26.02.2020
ES26.02.2020
FI26.02.2020
HR26.02.2020
IT26.02.2020
LT26.02.2020
LV26.02.2020
MC26.02.2020
MT26.02.2020
NL26.02.2020
PL26.02.2020
RO26.02.2020
RS26.02.2020
SE26.02.2020
SI26.02.2020
SK26.02.2020
SM26.02.2020
TR26.02.2020
LU15.03.2020
BE31.03.2020
CH31.03.2020
LI31.03.2020
FR26.04.2020
BG26.05.2020
GR27.05.2020
PT19.07.2020
Former [2021/10]CZ26.02.2020
DK26.02.2020
EE26.02.2020
ES26.02.2020
FI26.02.2020
HR26.02.2020
IT26.02.2020
LT26.02.2020
LV26.02.2020
MC26.02.2020
NL26.02.2020
PL26.02.2020
RO26.02.2020
RS26.02.2020
SE26.02.2020
SI26.02.2020
SK26.02.2020
SM26.02.2020
LU15.03.2020
BE31.03.2020
CH31.03.2020
LI31.03.2020
FR26.04.2020
BG26.05.2020
GR27.05.2020
PT19.07.2020
Former [2021/08]CZ26.02.2020
DK26.02.2020
EE26.02.2020
ES26.02.2020
FI26.02.2020
HR26.02.2020
LT26.02.2020
LV26.02.2020
MC26.02.2020
NL26.02.2020
RO26.02.2020
RS26.02.2020
SE26.02.2020
SK26.02.2020
SM26.02.2020
LU15.03.2020
CH31.03.2020
LI31.03.2020
BG26.05.2020
GR27.05.2020
PT19.07.2020
Former [2021/04]CZ26.02.2020
DK26.02.2020
EE26.02.2020
ES26.02.2020
FI26.02.2020
HR26.02.2020
LT26.02.2020
LV26.02.2020
MC26.02.2020
NL26.02.2020
RO26.02.2020
RS26.02.2020
SE26.02.2020
SK26.02.2020
SM26.02.2020
LU15.03.2020
BG26.05.2020
GR27.05.2020
PT19.07.2020
Former [2020/52]CZ26.02.2020
DK26.02.2020
EE26.02.2020
ES26.02.2020
FI26.02.2020
HR26.02.2020
LT26.02.2020
LV26.02.2020
MC26.02.2020
NL26.02.2020
RO26.02.2020
RS26.02.2020
SE26.02.2020
SK26.02.2020
SM26.02.2020
BG26.05.2020
GR27.05.2020
PT19.07.2020
Former [2020/50]CZ26.02.2020
DK26.02.2020
EE26.02.2020
ES26.02.2020
FI26.02.2020
HR26.02.2020
LT26.02.2020
LV26.02.2020
NL26.02.2020
RO26.02.2020
RS26.02.2020
SE26.02.2020
SK26.02.2020
SM26.02.2020
BG26.05.2020
GR27.05.2020
PT19.07.2020
Former [2020/49]CZ26.02.2020
DK26.02.2020
ES26.02.2020
FI26.02.2020
HR26.02.2020
LT26.02.2020
LV26.02.2020
NL26.02.2020
RO26.02.2020
RS26.02.2020
SE26.02.2020
SK26.02.2020
SM26.02.2020
BG26.05.2020
GR27.05.2020
PT19.07.2020
Former [2020/48]DK26.02.2020
ES26.02.2020
FI26.02.2020
HR26.02.2020
LT26.02.2020
LV26.02.2020
NL26.02.2020
RO26.02.2020
RS26.02.2020
SE26.02.2020
SM26.02.2020
BG26.05.2020
GR27.05.2020
PT19.07.2020
Former [2020/47]DK26.02.2020
ES26.02.2020
FI26.02.2020
HR26.02.2020
LT26.02.2020
LV26.02.2020
NL26.02.2020
RS26.02.2020
SE26.02.2020
BG26.05.2020
GR27.05.2020
Former [2020/45]FI26.02.2020
HR26.02.2020
LV26.02.2020
NL26.02.2020
RS26.02.2020
SE26.02.2020
BG26.05.2020
GR27.05.2020
Former [2020/39]FI26.02.2020
HR26.02.2020
LV26.02.2020
RS26.02.2020
SE26.02.2020
BG26.05.2020
GR27.05.2020
Former [2020/38]FI26.02.2020
HR26.02.2020
LV26.02.2020
RS26.02.2020
SE26.02.2020
GR27.05.2020
Former [2020/37]FI26.02.2020
HR26.02.2020
LV26.02.2020
RS26.02.2020
SE26.02.2020
Former [2020/35]FI26.02.2020
Documents cited:Search[A]EP2245941  (3X TECHNOLOGY [IS]) [A] 1-20 * paragraph [0022]; figure 1a *;
 [AD]WO2016170550  (SKAGINN HF [IS]) [AD] 1-20 * page 11, line 36 - page 12, line 21; figure 1 *;
 [A]WO2017027511  (MORRIS & ASS INC [US]) [A] 1-20* the whole document *
by applicantWO2016170550
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.