EP3220096 - ELECTRONIC SYSTEM WITH FLEX CIRCUIT CONNECTOR CONFIGURATION [Right-click to bookmark this link] | |||
Former [2017/38] | FLEX CIRCUIT CONNECTOR CONFIGURATION | ||
[2020/45] | Status | No opposition filed within time limit Status updated on 06.05.2022 Database last updated on 15.07.2024 | |
Former | The patent has been granted Status updated on 28.05.2021 | ||
Former | Grant of patent is intended Status updated on 26.01.2021 | ||
Former | Examination is in progress Status updated on 23.10.2020 | ||
Former | Request for examination was made Status updated on 23.03.2018 | ||
Former | The application has been published Status updated on 18.08.2017 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states Rosemount Aerospace Inc. 14300 Judicial Road Burnsville, MN 55306-4898 / US | [2021/26] |
Former [2017/38] | For all designated states Rosemount Aerospace Inc. 14300 Judicial Road Burnsville MN 55306-4898 / US | Inventor(s) | 01 /
WHATCOTT, Neal R. 1229 Vernon Dr. Carver, MN 55315 / US | [2017/38] | Representative(s) | Dehns St. Bride's House 10 Salisbury Square London EC4Y 8JD / GB | [2021/26] |
Former [2017/38] | Hughes, Andrea Michelle Dehns St Bride's House 10 Salisbury Square London EC4Y 8JD / GB | Application number, filing date | 17161125.4 | 15.03.2017 | [2017/38] | Priority number, date | US201615071745 | 16.03.2016 Original published format: US201615071745 | [2017/38] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3220096 | Date: | 20.09.2017 | Language: | EN | [2017/38] | Type: | B1 Patent specification | No.: | EP3220096 | Date: | 30.06.2021 | Language: | EN | [2021/26] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 31.07.2017 | Classification | IPC: | F42B35/00, F42C19/06, H05K1/02, H05K1/14, H05K3/36 | [2017/38] | CPC: |
F42B35/00 (EP,US);
H01R12/62 (US);
F42C19/06 (EP,US);
H05K1/028 (EP,US);
H05K1/14 (US);
H05K1/147 (EP,US);
H05K1/148 (EP,US);
H05K3/368 (EP,US);
F42B15/10 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/17] |
Former [2017/38] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | ELEKTRONIKANORDNUNG MIT VERBINDERKONFIGURATION IN FORM EINER FLEXIBLE SCHALTUNG | [2020/45] | English: | ELECTRONIC SYSTEM WITH FLEX CIRCUIT CONNECTOR CONFIGURATION | [2020/45] | French: | ASSEMBLAGE ÉLECRONIQUE AVEC CONFIGURATION DE CONNECTEUR DE CIRCUIT FLEXIBLE | [2020/45] |
Former [2017/38] | VERBINDERKONFIGURATION FÜR FLEXIBLE SCHALTUNG | ||
Former [2017/38] | FLEX CIRCUIT CONNECTOR CONFIGURATION | ||
Former [2017/38] | CONFIGURATION DE CONNECTEUR DE CIRCUIT FLEXIBLE | Examination procedure | 15.03.2017 | Date on which the examining division has become responsible | 19.03.2018 | Amendment by applicant (claims and/or description) | 19.03.2018 | Examination requested [2018/17] | 27.10.2020 | Despatch of a communication from the examining division (Time limit: M01) | 07.12.2020 | Reply to a communication from the examining division | 27.01.2021 | Communication of intention to grant the patent | 20.05.2021 | Fee for grant paid | 20.05.2021 | Fee for publishing/printing paid | 20.05.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 31.03.2022 | No opposition filed within time limit [2022/23] | Fees paid | Renewal fee | 22.03.2019 | Renewal fee patent year 03 | 20.03.2020 | Renewal fee patent year 04 | 23.03.2021 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 15.03.2017 | AL | 30.06.2021 | AT | 30.06.2021 | CY | 30.06.2021 | CZ | 30.06.2021 | DK | 30.06.2021 | EE | 30.06.2021 | ES | 30.06.2021 | FI | 30.06.2021 | HR | 30.06.2021 | IT | 30.06.2021 | LT | 30.06.2021 | LV | 30.06.2021 | MC | 30.06.2021 | MK | 30.06.2021 | NL | 30.06.2021 | PL | 30.06.2021 | RO | 30.06.2021 | RS | 30.06.2021 | SE | 30.06.2021 | SI | 30.06.2021 | SK | 30.06.2021 | SM | 30.06.2021 | BG | 30.09.2021 | NO | 30.09.2021 | GR | 01.10.2021 | IS | 30.10.2021 | PT | 02.11.2021 | IE | 15.03.2022 | LU | 15.03.2022 | [2024/22] |
Former [2024/20] | HU | 15.03.2017 | |
AL | 30.06.2021 | ||
AT | 30.06.2021 | ||
CY | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
IT | 30.06.2021 | ||
LT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
IE | 15.03.2022 | ||
LU | 15.03.2022 | ||
Former [2024/18] | HU | 15.03.2017 | |
AL | 30.06.2021 | ||
AT | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
IT | 30.06.2021 | ||
LT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
IE | 15.03.2022 | ||
LU | 15.03.2022 | ||
Former [2023/19] | AL | 30.06.2021 | |
AT | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
IT | 30.06.2021 | ||
LT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
IE | 15.03.2022 | ||
LU | 15.03.2022 | ||
Former [2023/09] | AL | 30.06.2021 | |
AT | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
IT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
IE | 15.03.2022 | ||
LU | 15.03.2022 | ||
Former [2023/08] | AL | 30.06.2021 | |
AT | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
IT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
IE | 15.03.2022 | ||
LU | 15.03.2022 | ||
Former [2022/47] | AL | 30.06.2021 | |
AT | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
IT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/36] | AL | 30.06.2021 | |
AT | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
IT | 30.06.2021 | ||
LV | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/29] | AL | 30.06.2021 | |
AT | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/26] | AL | 30.06.2021 | |
AT | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/21] | AT | 30.06.2021 | |
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/10] | AT | 30.06.2021 | |
CZ | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/09] | AT | 30.06.2021 | |
CZ | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
NL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/08] | AT | 30.06.2021 | |
CZ | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
NL | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
Former [2022/07] | AT | 30.06.2021 | |
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
NL | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
Former [2021/51] | FI | 30.06.2021 | |
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
Former [2021/49] | FI | 30.06.2021 | |
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
SE | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
Former [2021/47] | FI | 30.06.2021 | |
BG | 30.09.2021 | ||
Former [2021/46] | FI | 30.06.2021 | Documents cited: | Search | [I]US6287021 (KATOH MINORU [JP], et al) [I] 1-8 * abstract * * column 5, line 59 - column 6, line 7 *; | [XI]US2004154824 (HESSE HANS [DE]) [X] 1,2,8 * paragraphs [0022] - [0024]; figures 1,2 * [I] 2-7; | [A]US2006176677 (GLOVATSKY ANDREW Z [US], et al) [A] 1-12* abstract *; | [I]US2012242364 (OHMAYER GERD [DE]) [I] 1-9 * abstract * * paragraphs [0054] , [0068] , [0069] * |