EP3225482 - VEHICLE BRAKE HYDRAULIC PRESSURE CONTROL APPARATUS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 14.08.2020 Database last updated on 15.06.2024 | |
Former | The patent has been granted Status updated on 06.09.2019 | ||
Former | Grant of patent is intended Status updated on 25.04.2019 | ||
Former | Request for examination was made Status updated on 01.04.2019 | ||
Former | Grant of patent is intended Status updated on 15.11.2018 | ||
Former | Request for examination was made Status updated on 13.04.2018 | ||
Former | The application has been published Status updated on 01.09.2017 | Most recent event Tooltip | 15.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 17.08.2022 [2022/33] | Applicant(s) | For all designated states Autoliv Nissin Brake Systems Japan Co., Ltd. 3-17-6 Shinyokohama Kohoku-ku Yokohama-shi, Kanagawa 222-8580 / JP | [2019/17] |
Former [2017/40] | For all designated states Autoliv Nissin Brake Systems Japan Co., Ltd. 840, Kokubu Ueda-city, Nagano 386-0016 / JP | Inventor(s) | 01 /
Onodera, Yosuke c/o Veoneer Nissin Brake Systems Japan Co., Ltd. 3-17-6 Shinyokohama, Kohoku-ku, Yokohama-shi Kanagawa 222-8580 / JP | [2019/41] |
Former [2017/40] | 01 /
Onodera, Yosuke c/o AUTOLIV NISSIN BRAKE SYSTEMS JAPAN CO., LTD. 840, Kokubu Ueda-city Nagano 386-0016 / JP | Representative(s) | Hoffmann Eitle Patent- und Rechtsanwälte PartmbB Arabellastraße 30 81925 München / DE | [2017/40] | Application number, filing date | 17163272.2 | 28.03.2017 | [2017/40] | Priority number, date | JP20160063901 | 28.03.2016 Original published format: JP 2016063901 | [2017/40] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3225482 | Date: | 04.10.2017 | Language: | EN | [2017/40] | Type: | B1 Patent specification | No.: | EP3225482 | Date: | 09.10.2019 | Language: | EN | [2019/41] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 21.07.2017 | Classification | IPC: | B60T8/40 | [2017/40] | CPC: |
B60T8/4059 (EP,US);
B60T13/662 (US);
B60T8/36 (US);
B60T13/66 (US);
B60T13/686 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/20] |
Former [2017/40] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | HYDRAULIKDRUCKSTEUERUNGSVORRICHTUNG EINER FAHRZEUGBREMSE | [2017/40] | English: | VEHICLE BRAKE HYDRAULIC PRESSURE CONTROL APPARATUS | [2017/40] | French: | APPAREIL DE RÉGULATION DE PRESSION HYDRAULIQUE POUR FREIN DE VÉHICULE | [2017/40] | Examination procedure | 28.03.2017 | Date on which the examining division has become responsible | 04.04.2018 | Amendment by applicant (claims and/or description) | 04.04.2018 | Examination requested [2018/20] | 16.11.2018 | Communication of intention to grant the patent | 11.03.2019 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 26.04.2019 | Communication of intention to grant the patent | 26.08.2019 | Fee for grant paid | 26.08.2019 | Fee for publishing/printing paid | 26.08.2019 | Receipt of the translation of the claim(s) | Opposition(s) | 10.07.2020 | No opposition filed within time limit [2020/38] | Fees paid | Renewal fee | 15.03.2019 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 28.03.2017 | AL | 09.10.2019 | AT | 09.10.2019 | CY | 09.10.2019 | CZ | 09.10.2019 | DK | 09.10.2019 | EE | 09.10.2019 | ES | 09.10.2019 | FI | 09.10.2019 | HR | 09.10.2019 | IT | 09.10.2019 | LT | 09.10.2019 | LV | 09.10.2019 | MC | 09.10.2019 | MK | 09.10.2019 | MT | 09.10.2019 | NL | 09.10.2019 | PL | 09.10.2019 | RO | 09.10.2019 | RS | 09.10.2019 | SE | 09.10.2019 | SI | 09.10.2019 | SK | 09.10.2019 | SM | 09.10.2019 | TR | 09.10.2019 | BG | 09.01.2020 | NO | 09.01.2020 | GR | 10.01.2020 | IS | 09.02.2020 | PT | 10.02.2020 | IE | 28.03.2020 | LU | 28.03.2020 | BE | 31.03.2020 | CH | 31.03.2020 | LI | 31.03.2020 | [2022/33] |
Former [2022/27] | HU | 28.03.2017 | |
AL | 09.10.2019 | ||
AT | 09.10.2019 | ||
CY | 09.10.2019 | ||
CZ | 09.10.2019 | ||
DK | 09.10.2019 | ||
EE | 09.10.2019 | ||
ES | 09.10.2019 | ||
FI | 09.10.2019 | ||
HR | 09.10.2019 | ||
IT | 09.10.2019 | ||
LT | 09.10.2019 | ||
LV | 09.10.2019 | ||
MC | 09.10.2019 | ||
MT | 09.10.2019 | ||
NL | 09.10.2019 | ||
PL | 09.10.2019 | ||
RO | 09.10.2019 | ||
RS | 09.10.2019 | ||
SE | 09.10.2019 | ||
SI | 09.10.2019 | ||
SK | 09.10.2019 | ||
SM | 09.10.2019 | ||
TR | 09.10.2019 | ||
BG | 09.01.2020 | ||
NO | 09.01.2020 | ||
GR | 10.01.2020 | ||
IS | 09.02.2020 | ||
PT | 10.02.2020 | ||
IE | 28.03.2020 | ||
LU | 28.03.2020 | ||
BE | 31.03.2020 | ||
CH | 31.03.2020 | ||
LI | 31.03.2020 | ||
Former [2021/13] | AL | 09.10.2019 | |
AT | 09.10.2019 | ||
CZ | 09.10.2019 | ||
DK | 09.10.2019 | ||
EE | 09.10.2019 | ||
ES | 09.10.2019 | ||
FI | 09.10.2019 | ||
HR | 09.10.2019 | ||
IT | 09.10.2019 | ||
LT | 09.10.2019 | ||
LV | 09.10.2019 | ||
MC | 09.10.2019 | ||
NL | 09.10.2019 | ||
PL | 09.10.2019 | ||
RO | 09.10.2019 | ||
RS | 09.10.2019 | ||
SE | 09.10.2019 | ||
SI | 09.10.2019 | ||
SK | 09.10.2019 | ||
SM | 09.10.2019 | ||
BG | 09.01.2020 | ||
NO | 09.01.2020 | ||
GR | 10.01.2020 | ||
IS | 09.02.2020 | ||
PT | 10.02.2020 | ||
IE | 28.03.2020 | ||
LU | 28.03.2020 | ||
BE | 31.03.2020 | ||
CH | 31.03.2020 | ||
LI | 31.03.2020 | ||
Former [2021/07] | AL | 09.10.2019 | |
AT | 09.10.2019 | ||
CZ | 09.10.2019 | ||
DK | 09.10.2019 | ||
EE | 09.10.2019 | ||
ES | 09.10.2019 | ||
FI | 09.10.2019 | ||
HR | 09.10.2019 | ||
IT | 09.10.2019 | ||
LT | 09.10.2019 | ||
LV | 09.10.2019 | ||
MC | 09.10.2019 | ||
NL | 09.10.2019 | ||
PL | 09.10.2019 | ||
RO | 09.10.2019 | ||
RS | 09.10.2019 | ||
SE | 09.10.2019 | ||
SI | 09.10.2019 | ||
SK | 09.10.2019 | ||
SM | 09.10.2019 | ||
BG | 09.01.2020 | ||
NO | 09.01.2020 | ||
GR | 10.01.2020 | ||
IS | 09.02.2020 | ||
PT | 10.02.2020 | ||
IE | 28.03.2020 | ||
LU | 28.03.2020 | ||
CH | 31.03.2020 | ||
LI | 31.03.2020 | ||
Former [2021/04] | AL | 09.10.2019 | |
AT | 09.10.2019 | ||
CZ | 09.10.2019 | ||
DK | 09.10.2019 | ||
EE | 09.10.2019 | ||
ES | 09.10.2019 | ||
FI | 09.10.2019 | ||
HR | 09.10.2019 | ||
IT | 09.10.2019 | ||
LT | 09.10.2019 | ||
LV | 09.10.2019 | ||
MC | 09.10.2019 | ||
NL | 09.10.2019 | ||
PL | 09.10.2019 | ||
RO | 09.10.2019 | ||
RS | 09.10.2019 | ||
SE | 09.10.2019 | ||
SI | 09.10.2019 | ||
SK | 09.10.2019 | ||
SM | 09.10.2019 | ||
BG | 09.01.2020 | ||
NO | 09.01.2020 | ||
GR | 10.01.2020 | ||
IS | 09.02.2020 | ||
PT | 10.02.2020 | ||
LU | 28.03.2020 | ||
Former [2020/50] | AL | 09.10.2019 | |
AT | 09.10.2019 | ||
CZ | 09.10.2019 | ||
DK | 09.10.2019 | ||
EE | 09.10.2019 | ||
ES | 09.10.2019 | ||
FI | 09.10.2019 | ||
HR | 09.10.2019 | ||
IT | 09.10.2019 | ||
LT | 09.10.2019 | ||
LV | 09.10.2019 | ||
MC | 09.10.2019 | ||
NL | 09.10.2019 | ||
PL | 09.10.2019 | ||
RO | 09.10.2019 | ||
RS | 09.10.2019 | ||
SE | 09.10.2019 | ||
SI | 09.10.2019 | ||
SK | 09.10.2019 | ||
SM | 09.10.2019 | ||
BG | 09.01.2020 | ||
NO | 09.01.2020 | ||
GR | 10.01.2020 | ||
IS | 09.02.2020 | ||
PT | 10.02.2020 | ||
Former [2020/48] | AL | 09.10.2019 | |
AT | 09.10.2019 | ||
CZ | 09.10.2019 | ||
DK | 09.10.2019 | ||
EE | 09.10.2019 | ||
ES | 09.10.2019 | ||
FI | 09.10.2019 | ||
HR | 09.10.2019 | ||
IT | 09.10.2019 | ||
LT | 09.10.2019 | ||
LV | 09.10.2019 | ||
NL | 09.10.2019 | ||
PL | 09.10.2019 | ||
RO | 09.10.2019 | ||
RS | 09.10.2019 | ||
SE | 09.10.2019 | ||
SK | 09.10.2019 | ||
SM | 09.10.2019 | ||
BG | 09.01.2020 | ||
NO | 09.01.2020 | ||
GR | 10.01.2020 | ||
IS | 09.02.2020 | ||
PT | 10.02.2020 | ||
Former [2020/38] | AL | 09.10.2019 | |
AT | 09.10.2019 | ||
CZ | 09.10.2019 | ||
DK | 09.10.2019 | ||
EE | 09.10.2019 | ||
FI | 09.10.2019 | ||
HR | 09.10.2019 | ||
IT | 09.10.2019 | ||
LT | 09.10.2019 | ||
LV | 09.10.2019 | ||
NL | 09.10.2019 | ||
PL | 09.10.2019 | ||
RO | 09.10.2019 | ||
RS | 09.10.2019 | ||
SE | 09.10.2019 | ||
SK | 09.10.2019 | ||
SM | 09.10.2019 | ||
BG | 09.01.2020 | ||
NO | 09.01.2020 | ||
GR | 10.01.2020 | ||
IS | 09.02.2020 | ||
PT | 10.02.2020 | ||
Former [2020/37] | AL | 09.10.2019 | |
AT | 09.10.2019 | ||
CZ | 09.10.2019 | ||
DK | 09.10.2019 | ||
EE | 09.10.2019 | ||
FI | 09.10.2019 | ||
HR | 09.10.2019 | ||
LT | 09.10.2019 | ||
LV | 09.10.2019 | ||
NL | 09.10.2019 | ||
PL | 09.10.2019 | ||
RO | 09.10.2019 | ||
RS | 09.10.2019 | ||
SE | 09.10.2019 | ||
SK | 09.10.2019 | ||
SM | 09.10.2019 | ||
BG | 09.01.2020 | ||
NO | 09.01.2020 | ||
GR | 10.01.2020 | ||
IS | 09.02.2020 | ||
PT | 10.02.2020 | ||
Former [2020/36] | AL | 09.10.2019 | |
AT | 09.10.2019 | ||
CZ | 09.10.2019 | ||
DK | 09.10.2019 | ||
EE | 09.10.2019 | ||
FI | 09.10.2019 | ||
HR | 09.10.2019 | ||
LT | 09.10.2019 | ||
LV | 09.10.2019 | ||
NL | 09.10.2019 | ||
PL | 09.10.2019 | ||
RO | 09.10.2019 | ||
RS | 09.10.2019 | ||
SE | 09.10.2019 | ||
BG | 09.01.2020 | ||
NO | 09.01.2020 | ||
GR | 10.01.2020 | ||
IS | 09.02.2020 | ||
PT | 10.02.2020 | ||
Former [2020/35] | AL | 09.10.2019 | |
AT | 09.10.2019 | ||
CZ | 09.10.2019 | ||
FI | 09.10.2019 | ||
HR | 09.10.2019 | ||
LT | 09.10.2019 | ||
LV | 09.10.2019 | ||
NL | 09.10.2019 | ||
PL | 09.10.2019 | ||
RO | 09.10.2019 | ||
RS | 09.10.2019 | ||
SE | 09.10.2019 | ||
BG | 09.01.2020 | ||
NO | 09.01.2020 | ||
GR | 10.01.2020 | ||
PT | 10.02.2020 | ||
IS | 24.02.2020 | ||
Former [2020/32] | AL | 09.10.2019 | |
AT | 09.10.2019 | ||
FI | 09.10.2019 | ||
HR | 09.10.2019 | ||
LT | 09.10.2019 | ||
LV | 09.10.2019 | ||
NL | 09.10.2019 | ||
PL | 09.10.2019 | ||
RS | 09.10.2019 | ||
SE | 09.10.2019 | ||
BG | 09.01.2020 | ||
NO | 09.01.2020 | ||
GR | 10.01.2020 | ||
PT | 10.02.2020 | ||
IS | 24.02.2020 | ||
Former [2020/25] | AT | 09.10.2019 | |
FI | 09.10.2019 | ||
HR | 09.10.2019 | ||
LT | 09.10.2019 | ||
LV | 09.10.2019 | ||
NL | 09.10.2019 | ||
PL | 09.10.2019 | ||
RS | 09.10.2019 | ||
SE | 09.10.2019 | ||
BG | 09.01.2020 | ||
NO | 09.01.2020 | ||
GR | 10.01.2020 | ||
PT | 10.02.2020 | ||
IS | 24.02.2020 | ||
Former [2020/24] | AT | 09.10.2019 | |
FI | 09.10.2019 | ||
LT | 09.10.2019 | ||
LV | 09.10.2019 | ||
NL | 09.10.2019 | ||
PL | 09.10.2019 | ||
SE | 09.10.2019 | ||
BG | 09.01.2020 | ||
NO | 09.01.2020 | ||
GR | 10.01.2020 | ||
PT | 10.02.2020 | ||
IS | 24.02.2020 | ||
Former [2020/23] | AT | 09.10.2019 | |
FI | 09.10.2019 | ||
LT | 09.10.2019 | ||
LV | 09.10.2019 | ||
NL | 09.10.2019 | ||
PL | 09.10.2019 | ||
SE | 09.10.2019 | ||
BG | 09.01.2020 | ||
NO | 09.01.2020 | ||
GR | 10.01.2020 | ||
PT | 10.02.2020 | ||
Former [2020/22] | FI | 09.10.2019 | |
LT | 09.10.2019 | ||
NL | 09.10.2019 | ||
SE | 09.10.2019 | ||
BG | 09.01.2020 | ||
NO | 09.01.2020 | ||
PT | 10.02.2020 | ||
Former [2020/21] | NL | 09.10.2019 | |
NO | 09.01.2020 | ||
Former [2020/20] | NL | 09.10.2019 | Documents cited: | Search | [Y]EP0313292 (LUCAS IND PLC [GB]) [Y] 1-3 * page 1, line 50 - line 54 * * page 3, line 41 - page 4, line 8 * * figure 1; claims 1-3,6-8 *; | [YD]JPH04303041 (MAZDA MOTOR) [YD] 1-3 * abstract * * paragraph [0035] - paragraph [0036] *; | [Y]US6807848 (FENNEL HELMUT [DE], et al) [Y] 1-7 * column 5, line 36 - line 55; figures 4,5 ** column 2, line 26 - line 58 *; | [A]US2006175895 (MAHLO RUDIGER [DE], et al) [A] 1,4,5 * paragraph [0006] - paragraph [0008] * * paragraph [0017] - paragraph [0018] * * claims 1,4 *; | [Y]US2015298668 (KURZ FLORIAN [DE], et al) [Y] 1-7 * paragraph [0007] - paragraph [0010]; claims 1,7 * | by applicant | JPH04303041 |