blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3383094

EP3383094 - SYSTEM AND METHOD FOR TRANSMITTING CONTENT WITH LARGE DATA VOLUMES IN A SHORT AMOUNT OF TIME [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  28.08.2020
Database last updated on 19.10.2024
FormerThe patent has been granted
Status updated on  20.09.2019
FormerGrant of patent is intended
Status updated on  14.09.2019
FormerRequest for examination was made
Status updated on  07.09.2019
FormerGrant of patent is intended
Status updated on  25.04.2019
FormerRequest for examination was made
Status updated on  02.11.2018
FormerThe application has been published
Status updated on  31.08.2018
Most recent event   Tooltip15.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 17.08.2022  [2022/33]
Applicant(s)For all designated states
Deutsche Telekom AG
Friedrich-Ebert-Allee 140
53113 Bonn / DE
[2018/40]
Inventor(s)01 / LANGE, Christoph
Drachenfelsstraße 7
10318 Berlin / DE
02 / KOSIANKOWSKI, Dirk
Chopinstraße 7
15732 Eichwalde / DE
 [2018/40]
Representative(s)Vossius & Partner Patentanwälte Rechtsanwälte mbB
Siebertstrasse 3
81675 München / DE
[2018/40]
Application number, filing date17164170.731.03.2017
[2018/40]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3383094
Date:03.10.2018
Language:DE
[2018/40]
Type: B1 Patent specification 
No.:EP3383094
Date:23.10.2019
Language:DE
[2019/43]
Search report(s)(Supplementary) European search report - dispatched on:EP02.10.2017
ClassificationIPC:H04W36/02, // H04W84/00
[2018/40]
CPC:
H04W36/026 (EP); H04W84/005 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/49]
Former [2018/40]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:SYSTEM UND VERFAHREN ZUR ÜBERTRAGUNG VON INHALTEN MIT GROSSEN DATENVOLUMEN IN KURZER ZEIT[2018/40]
English:SYSTEM AND METHOD FOR TRANSMITTING CONTENT WITH LARGE DATA VOLUMES IN A SHORT AMOUNT OF TIME[2018/40]
French:SYSTÈME ET PROCÉDÉ DE TRANSFERT DE CONTENUS AYANT UN GRAND VOLUME DE DONNÉES DANS UN LAPS DE TEMPS COURT[2018/40]
Examination procedure23.10.2018Amendment by applicant (claims and/or description)
23.10.2018Examination requested  [2018/49]
23.10.2018Date on which the examining division has become responsible
26.04.2019Communication of intention to grant the patent
05.09.2019Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
05.09.2019Fee for grant paid
05.09.2019Fee for publishing/printing paid
13.09.2019Information about intention to grant a patent
13.09.2019Receipt of the translation of the claim(s)
Opposition(s)24.07.2020No opposition filed within time limit [2020/40]
Fees paidRenewal fee
27.03.2019Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU31.03.2017
AL23.10.2019
CY23.10.2019
CZ23.10.2019
DK23.10.2019
EE23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
IT23.10.2019
LT23.10.2019
LV23.10.2019
MC23.10.2019
MK23.10.2019
MT23.10.2019
NL23.10.2019
PL23.10.2019
RO23.10.2019
RS23.10.2019
SE23.10.2019
SI23.10.2019
SK23.10.2019
SM23.10.2019
TR23.10.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS23.02.2020
PT24.02.2020
BE31.03.2020
CH31.03.2020
IE31.03.2020
LI31.03.2020
LU31.03.2020
[2022/33]
Former [2022/27]HU31.03.2017
AL23.10.2019
CY23.10.2019
CZ23.10.2019
DK23.10.2019
EE23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
IT23.10.2019
LT23.10.2019
LV23.10.2019
MC23.10.2019
MT23.10.2019
NL23.10.2019
PL23.10.2019
RO23.10.2019
RS23.10.2019
SE23.10.2019
SI23.10.2019
SK23.10.2019
SM23.10.2019
TR23.10.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS23.02.2020
PT24.02.2020
BE31.03.2020
CH31.03.2020
IE31.03.2020
LI31.03.2020
LU31.03.2020
Former [2021/13]AL23.10.2019
CZ23.10.2019
DK23.10.2019
EE23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
IT23.10.2019
LT23.10.2019
LV23.10.2019
MC23.10.2019
NL23.10.2019
PL23.10.2019
RO23.10.2019
RS23.10.2019
SE23.10.2019
SI23.10.2019
SK23.10.2019
SM23.10.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS23.02.2020
PT24.02.2020
BE31.03.2020
CH31.03.2020
IE31.03.2020
LI31.03.2020
LU31.03.2020
Former [2021/08]AL23.10.2019
CZ23.10.2019
DK23.10.2019
EE23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
IT23.10.2019
LT23.10.2019
LV23.10.2019
MC23.10.2019
NL23.10.2019
PL23.10.2019
RO23.10.2019
RS23.10.2019
SE23.10.2019
SI23.10.2019
SK23.10.2019
SM23.10.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS23.02.2020
PT24.02.2020
CH31.03.2020
IE31.03.2020
LI31.03.2020
LU31.03.2020
Former [2021/04]AL23.10.2019
CZ23.10.2019
DK23.10.2019
EE23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
IT23.10.2019
LT23.10.2019
LV23.10.2019
MC23.10.2019
NL23.10.2019
PL23.10.2019
RO23.10.2019
RS23.10.2019
SE23.10.2019
SI23.10.2019
SK23.10.2019
SM23.10.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS23.02.2020
PT24.02.2020
LU31.03.2020
Former [2020/50]AL23.10.2019
CZ23.10.2019
DK23.10.2019
EE23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
IT23.10.2019
LT23.10.2019
LV23.10.2019
MC23.10.2019
NL23.10.2019
PL23.10.2019
RO23.10.2019
RS23.10.2019
SE23.10.2019
SI23.10.2019
SK23.10.2019
SM23.10.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS23.02.2020
PT24.02.2020
Former [2020/38]AL23.10.2019
CZ23.10.2019
DK23.10.2019
EE23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
IT23.10.2019
LT23.10.2019
LV23.10.2019
NL23.10.2019
PL23.10.2019
RO23.10.2019
RS23.10.2019
SE23.10.2019
SK23.10.2019
SM23.10.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS23.02.2020
PT24.02.2020
Former [2020/37]AL23.10.2019
CZ23.10.2019
DK23.10.2019
EE23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
LT23.10.2019
LV23.10.2019
NL23.10.2019
PL23.10.2019
RO23.10.2019
RS23.10.2019
SE23.10.2019
SK23.10.2019
SM23.10.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS23.02.2020
PT24.02.2020
Former [2020/36]AL23.10.2019
CZ23.10.2019
DK23.10.2019
EE23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
LT23.10.2019
LV23.10.2019
NL23.10.2019
PL23.10.2019
RO23.10.2019
RS23.10.2019
SE23.10.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS23.02.2020
PT24.02.2020
Former [2020/35]AL23.10.2019
CZ23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
LT23.10.2019
LV23.10.2019
NL23.10.2019
PL23.10.2019
RO23.10.2019
RS23.10.2019
SE23.10.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS24.02.2020
PT24.02.2020
Former [2020/34]AL23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
LT23.10.2019
LV23.10.2019
NL23.10.2019
PL23.10.2019
RS23.10.2019
SE23.10.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS24.02.2020
PT24.02.2020
Former [2020/32]AL23.10.2019
FI23.10.2019
HR23.10.2019
LT23.10.2019
LV23.10.2019
NL23.10.2019
PL23.10.2019
RS23.10.2019
SE23.10.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS24.02.2020
PT24.02.2020
Former [2020/25]FI23.10.2019
HR23.10.2019
LT23.10.2019
LV23.10.2019
NL23.10.2019
PL23.10.2019
RS23.10.2019
SE23.10.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS24.02.2020
PT24.02.2020
Former [2020/24]FI23.10.2019
LT23.10.2019
LV23.10.2019
NL23.10.2019
PL23.10.2019
SE23.10.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS24.02.2020
PT24.02.2020
Former [2020/23]FI23.10.2019
LT23.10.2019
LV23.10.2019
NL23.10.2019
PL23.10.2019
SE23.10.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
PT24.02.2020
Former [2020/22]FI23.10.2019
LT23.10.2019
NL23.10.2019
SE23.10.2019
BG23.01.2020
NO23.01.2020
PT24.02.2020
Former [2020/21]NL23.10.2019
NO23.01.2020
Former [2020/20]NL23.10.2019
Documents cited:Search[XI]US2010057563  (RAUBER PETER H [US], et al) [X] 1-5,9,12,13 * Absätze [0008], [0031], [0035], [0036], [0037], [0041], [0043], [0044], [0050], [0052], [0061], [0064], [0068], [0070];; figures 1, 2, 3, 4, 6 * [I] 6-8,10,11;
 [A]US2014254543  (ENGELHARD LARS [DE], et al) [A] 1-13* Absätze [0007], [0011], [0012], [0017], [0022], [0024], [0025], [0027], [0029], [0030] *;
 [YA]US2015131519  (KANABAR PARESH [US], et al) [Y] 6,7 * paragraph [[0034]] * [A] 8-13;
 [YA]EP3062556  (NASH TECHNOLOGIES GMBH [DE]) [Y] 6,7 * paragraph [[0036]] * [A] 1-5,8-13
by applicant   - INTERTRAIN-REPEATER, URL: https://de.wikipedia.org/wiki/Intrain-Repeater Stand
    - "Direct-Air-to-Ground", MOBILFUNKTECHNOLOGIE, URL: https://www.telekom.com/medien/konzern/107624-Stand
    - IEEE 802.11 AD, URL: https://en.wikipedia.org/wiki/Wireless_Gigabit_Alliance Stand
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.