Extract from the Register of European Patents

EP About this file: EP3249767

EP3249767 - SWITCHING DEVICE FOR SWITCHING AN ELECTRIC MOTOR [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  02.12.2022
Database last updated on 01.04.2026
FormerThe patent has been granted
Status updated on  24.12.2021
FormerGrant of patent is intended
Status updated on  30.08.2021
FormerExamination is in progress
Status updated on  13.03.2020
FormerRequest for examination was made
Status updated on  11.05.2018
FormerThe application has been published
Status updated on  27.10.2017
Most recent event   Tooltip13.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 16.10.2024  [2024/42]
Applicant(s)For all designated states
Lock Antriebstechnik GmbH
Freimut-Lock-Strasse 2
88521 Ertingen / DE
[2017/48]
Inventor(s)01 / Lock, Frank
Allensteinstrasse 21
88521 Ertingen / DE
02 / Niederer, Patrick
Zum Bahnhof 14
88499 Riedlingen-Zwiefaltendorf / DE
03 / Fluhr, Tobias
Hüttenlache 4
88521 Ertingen / DE
 [2017/48]
Representative(s)RavensPAT Patentanwälte Partnerschaft mbB
Großtobeler Straße 39
88276 Berg / Ravensburg / DE
[N/P]
Former [2017/48]Otten, Roth, Dobler & Partner mbB Patentanwälte
Großtobeler Straße 39
88276 Berg / Ravensburg / DE
Application number, filing date17166536.713.04.2017
[2017/48]
Priority number, dateDE20161010800729.04.2016         Original published format: DE102016108007
[2017/48]
Filing languageDE
Procedural languageDE
PublicationType: A2 Application without search report 
No.:EP3249767
Date:29.11.2017
Language:DE
[2017/48]
Type: A3 Search report 
No.:EP3249767
Date:06.12.2017
Language:DE
[2017/49]
Type: B1 Patent specification 
No.:EP3249767
Date:26.01.2022
Language:DE
[2022/04]
Search report(s)(Supplementary) European search report - dispatched on:EP08.11.2017
ClassificationIPC:H02H7/085, E05F15/603, E05F15/40, H02P6/16, H02P31/00
[2017/48]
CPC:
H02P31/00 (EP,US); H02K11/21 (US); E05F15/40 (EP,US);
E05F15/603 (EP,US); G01D5/20 (US); H02K7/116 (US);
H02P6/16 (EP,US); E05Y2400/32 (EP,US); E05Y2400/40 (EP,US);
E05Y2400/445 (EP,US); E05Y2900/11 (EP,US); E05Y2900/148 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/24]
Former [2017/48]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:SCHALTVORRICHTUNG ZUM SCHALTEN EINES ELEKTRISCHEN MOTORS[2017/48]
English:SWITCHING DEVICE FOR SWITCHING AN ELECTRIC MOTOR[2017/48]
French:DISPOSITIF DE COUPURE D'UN MOTEUR ÉLECTRIQUE[2017/48]
Examination procedure13.04.2017Date on which the examining division has become responsible
02.05.2018Amendment by applicant (claims and/or description)
02.05.2018Examination requested  [2018/24]
17.03.2020Despatch of a communication from the examining division (Time limit: M06)
11.09.2020Reply to a communication from the examining division
31.08.2021Communication of intention to grant the patent
15.12.2021Fee for grant paid
15.12.2021Fee for publishing/printing paid
15.12.2021Receipt of the translation of the claim(s)
Opposition(s)27.10.2022No opposition filed within time limit [2023/01]
Fees paidRenewal fee
10.04.2019Renewal fee patent year 03
08.04.2020Renewal fee patent year 04
09.03.2021Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU13.04.2017
AL26.01.2022
CY26.01.2022
CZ26.01.2022
DK26.01.2022
EE26.01.2022
FI26.01.2022
HR26.01.2022
LT26.01.2022
LV26.01.2022
MC26.01.2022
MK26.01.2022
MT26.01.2022
RO26.01.2022
RS26.01.2022
SE26.01.2022
SI26.01.2022
SK26.01.2022
SM26.01.2022
IE13.04.2022
LU13.04.2022
BG26.04.2022
NO26.04.2022
GR27.04.2022
BE30.04.2022
CH30.04.2022
LI30.04.2022
IS26.05.2022
PT26.05.2022
[2024/42]
Former [2024/22]HU13.04.2017
AL26.01.2022
CY26.01.2022
CZ26.01.2022
DK26.01.2022
EE26.01.2022
FI26.01.2022
HR26.01.2022
LT26.01.2022
LV26.01.2022
MC26.01.2022
MK26.01.2022
RO26.01.2022
RS26.01.2022
SE26.01.2022
SI26.01.2022
SK26.01.2022
SM26.01.2022
IE13.04.2022
LU13.04.2022
BG26.04.2022
NO26.04.2022
GR27.04.2022
BE30.04.2022
CH30.04.2022
LI30.04.2022
IS26.05.2022
PT26.05.2022
Former [2024/20]HU13.04.2017
AL26.01.2022
CY26.01.2022
CZ26.01.2022
DK26.01.2022
EE26.01.2022
FI26.01.2022
HR26.01.2022
LT26.01.2022
LV26.01.2022
MC26.01.2022
RO26.01.2022
RS26.01.2022
SE26.01.2022
SI26.01.2022
SK26.01.2022
SM26.01.2022
IE13.04.2022
LU13.04.2022
BG26.04.2022
NO26.04.2022
GR27.04.2022
BE30.04.2022
CH30.04.2022
LI30.04.2022
IS26.05.2022
PT26.05.2022
Former [2024/18]HU13.04.2017
AL26.01.2022
CZ26.01.2022
DK26.01.2022
EE26.01.2022
FI26.01.2022
HR26.01.2022
LT26.01.2022
LV26.01.2022
MC26.01.2022
RO26.01.2022
RS26.01.2022
SE26.01.2022
SI26.01.2022
SK26.01.2022
SM26.01.2022
IE13.04.2022
LU13.04.2022
BG26.04.2022
NO26.04.2022
GR27.04.2022
BE30.04.2022
CH30.04.2022
LI30.04.2022
IS26.05.2022
PT26.05.2022
Former [2023/20]AL26.01.2022
CZ26.01.2022
DK26.01.2022
EE26.01.2022
FI26.01.2022
HR26.01.2022
LT26.01.2022
LV26.01.2022
MC26.01.2022
RO26.01.2022
RS26.01.2022
SE26.01.2022
SI26.01.2022
SK26.01.2022
SM26.01.2022
IE13.04.2022
LU13.04.2022
BG26.04.2022
NO26.04.2022
GR27.04.2022
BE30.04.2022
CH30.04.2022
LI30.04.2022
IS26.05.2022
PT26.05.2022
Former [2023/10]AL26.01.2022
CZ26.01.2022
DK26.01.2022
EE26.01.2022
FI26.01.2022
HR26.01.2022
LT26.01.2022
LV26.01.2022
MC26.01.2022
RO26.01.2022
RS26.01.2022
SE26.01.2022
SI26.01.2022
SK26.01.2022
SM26.01.2022
LU13.04.2022
BG26.04.2022
NO26.04.2022
GR27.04.2022
BE30.04.2022
CH30.04.2022
LI30.04.2022
IS26.05.2022
PT26.05.2022
Former [2023/09]AL26.01.2022
CZ26.01.2022
DK26.01.2022
EE26.01.2022
FI26.01.2022
HR26.01.2022
LT26.01.2022
LV26.01.2022
MC26.01.2022
RO26.01.2022
RS26.01.2022
SE26.01.2022
SK26.01.2022
SM26.01.2022
LU13.04.2022
BG26.04.2022
NO26.04.2022
GR27.04.2022
CH30.04.2022
LI30.04.2022
IS26.05.2022
PT26.05.2022
Former [2023/08]AL26.01.2022
CZ26.01.2022
DK26.01.2022
EE26.01.2022
FI26.01.2022
HR26.01.2022
LT26.01.2022
LV26.01.2022
MC26.01.2022
RO26.01.2022
RS26.01.2022
SE26.01.2022
SK26.01.2022
SM26.01.2022
LU13.04.2022
BG26.04.2022
NO26.04.2022
GR27.04.2022
IS26.05.2022
PT26.05.2022
Former [2023/06]AL26.01.2022
CZ26.01.2022
DK26.01.2022
EE26.01.2022
FI26.01.2022
HR26.01.2022
LT26.01.2022
LV26.01.2022
MC26.01.2022
RO26.01.2022
RS26.01.2022
SE26.01.2022
SK26.01.2022
SM26.01.2022
BG26.04.2022
NO26.04.2022
GR27.04.2022
IS26.05.2022
PT26.05.2022
Former [2023/01]AL26.01.2022
CZ26.01.2022
DK26.01.2022
EE26.01.2022
FI26.01.2022
HR26.01.2022
LT26.01.2022
LV26.01.2022
RO26.01.2022
RS26.01.2022
SE26.01.2022
SK26.01.2022
SM26.01.2022
BG26.04.2022
NO26.04.2022
GR27.04.2022
IS26.05.2022
PT26.05.2022
Former [2022/49]CZ26.01.2022
DK26.01.2022
EE26.01.2022
FI26.01.2022
HR26.01.2022
LT26.01.2022
LV26.01.2022
RO26.01.2022
RS26.01.2022
SE26.01.2022
SK26.01.2022
SM26.01.2022
BG26.04.2022
NO26.04.2022
GR27.04.2022
IS26.05.2022
PT26.05.2022
Former [2022/48]CZ26.01.2022
DK26.01.2022
EE26.01.2022
FI26.01.2022
HR26.01.2022
LT26.01.2022
LV26.01.2022
RO26.01.2022
RS26.01.2022
SE26.01.2022
SM26.01.2022
BG26.04.2022
NO26.04.2022
GR27.04.2022
IS26.05.2022
PT26.05.2022
Former [2022/47]DK26.01.2022
FI26.01.2022
HR26.01.2022
LT26.01.2022
LV26.01.2022
RO26.01.2022
RS26.01.2022
SE26.01.2022
SM26.01.2022
BG26.04.2022
NO26.04.2022
GR27.04.2022
IS26.05.2022
PT26.05.2022
Former [2022/46]DK26.01.2022
FI26.01.2022
HR26.01.2022
LT26.01.2022
LV26.01.2022
RS26.01.2022
SE26.01.2022
BG26.04.2022
NO26.04.2022
GR27.04.2022
IS26.05.2022
PT26.05.2022
Former [2022/42]FI26.01.2022
HR26.01.2022
LT26.01.2022
LV26.01.2022
RS26.01.2022
SE26.01.2022
BG26.04.2022
NO26.04.2022
GR27.04.2022
IS26.05.2022
PT26.05.2022
Former [2022/39]FI26.01.2022
HR26.01.2022
LT26.01.2022
LV26.01.2022
RS26.01.2022
SE26.01.2022
BG26.04.2022
NO26.04.2022
GR27.04.2022
PT26.05.2022
Former [2022/36]HR26.01.2022
LT26.01.2022
LV26.01.2022
RS26.01.2022
SE26.01.2022
BG26.04.2022
NO26.04.2022
GR27.04.2022
PT26.05.2022
Former [2022/35]HR26.01.2022
LT26.01.2022
RS26.01.2022
SE26.01.2022
BG26.04.2022
NO26.04.2022
PT26.05.2022
Former [2022/34]LT26.01.2022
NO26.04.2022
PT26.05.2022
Former [2022/33]LT26.01.2022
NO26.04.2022
Documents cited:Search[XY] GB2289351  (KOITO MFG CO LTD et al.) [X] 1-3,5,7,9-13 * page 10, line 19 - line 21; figure 3 * * page 1, line 13 - line 23; figure 2 * * page 27, line 21 - page 28, line 2 * * page 19, line 23 - page 20, line 4; figures 2,3,5 * * page 13, line 10 - line 17; figure 4 * * page 11, line 19 - page 12, line 9; figure 3 * * page 2, line 9 - line 12 *[Y] 4,6,8
 [Y] US2013133447  (LEIVENZON JACK et al.) [Y] 4 * page 12, column links, paragraph 0140 *
 [Y] US4338553  (SCOTT JR WALLER M et al.) [Y] 6 * page 1, column 2, line 41 - line 49 *
 [Y] WO2009146738  (SKF AB et al.) [Y] 8 * page 3, line 22 - line 28 *
ExaminationWO2015133291
 US2016365771
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.