blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3396838

EP3396838 - ALTERNATE ARM CONVERTER [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  11.02.2022
Database last updated on 26.07.2024
FormerThe patent has been granted
Status updated on  05.03.2021
FormerGrant of patent is intended
Status updated on  20.10.2020
FormerExamination is in progress
Status updated on  25.05.2020
FormerRequest for examination was made
Status updated on  18.05.2020
FormerGrant of patent is intended
Status updated on  16.01.2020
FormerRequest for examination was made
Status updated on  10.05.2019
FormerThe application has been published
Status updated on  28.09.2018
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024  [2024/29]
Applicant(s)For all designated states
General Electric Technology GmbH
Brown Boveri Strasse 7
5400 Baden / CH
[2018/44]
Inventor(s)01 / GINNAREDDY, Rajaseker
11 Felton House
Felton Close
Stafford, Staffordshire ST17 4FG / GB
02 / TRAINER, David Reginald
45 Brackens Lane
Alvaston, Derbyshire DE24 0AQ / GB
03 / BARKER, Carl David
6 Foxwood Close
Walton
Stone, Staffordshire ST15 0LN / GB
 [2018/44]
Representative(s)Freigutpartners IP Law Firm
Hahnrainweg 4
5400 Baden / CH
[2021/14]
Former [2018/44]Fischer, Michael Maria, et al
General Electric Technology GmbH
GE Corporate Intellectual Property
Brown Boveri Strasse 7
5400 Baden / CH
Application number, filing date17168007.725.04.2017
[2018/44]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3396838
Date:31.10.2018
Language:EN
[2018/44]
Type: B1 Patent specification 
No.:EP3396838
Date:07.04.2021
Language:EN
[2021/14]
Search report(s)(Supplementary) European search report - dispatched on:EP19.10.2017
ClassificationIPC:H02M7/483, H02M1/12, H02M1/14
[2018/44]
CPC:
H02M1/14 (EP,US); H02M1/12 (EP,US); H02M7/4835 (EP,US);
H02M7/5387 (US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/24]
Former [2018/44]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:MODULARER MEHRSTUFIGER WANDLER[2018/44]
English:ALTERNATE ARM CONVERTER[2018/44]
French:CONVERTISSEUR À BRAS ALTERNÉ[2018/44]
Examination procedure25.04.2019Amendment by applicant (claims and/or description)
30.04.2019Examination requested  [2019/24]
30.04.2019Date on which the examining division has become responsible
17.01.2020Communication of intention to grant the patent
18.05.2020Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
28.05.2020Despatch of a communication from the examining division (Time limit: M04)
25.09.2020Reply to a communication from the examining division
21.10.2020Communication of intention to grant the patent
08.02.2021Receipt of the translation of the claim(s)
27.02.2021Fee for grant paid
27.02.2021Fee for publishing/printing paid
Opposition(s)10.01.2022No opposition filed within time limit [2022/11]
Fees paidRenewal fee
18.04.2019Renewal fee patent year 03
21.04.2020Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU25.04.2017
AL07.04.2021
AT07.04.2021
CY07.04.2021
CZ07.04.2021
DK07.04.2021
EE07.04.2021
ES07.04.2021
FI07.04.2021
HR07.04.2021
IT07.04.2021
LT07.04.2021
LV07.04.2021
MC07.04.2021
MK07.04.2021
NL07.04.2021
PL07.04.2021
RO07.04.2021
RS07.04.2021
SI07.04.2021
SK07.04.2021
SM07.04.2021
TR07.04.2021
IE25.04.2021
LU25.04.2021
BE30.04.2021
CH30.04.2021
LI30.04.2021
FR07.06.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IS07.08.2021
PT09.08.2021
[2024/29]
Former [2024/22]HU25.04.2017
AL07.04.2021
AT07.04.2021
CY07.04.2021
CZ07.04.2021
DK07.04.2021
EE07.04.2021
ES07.04.2021
FI07.04.2021
HR07.04.2021
IT07.04.2021
LT07.04.2021
LV07.04.2021
MC07.04.2021
MK07.04.2021
NL07.04.2021
PL07.04.2021
RO07.04.2021
RS07.04.2021
SI07.04.2021
SK07.04.2021
SM07.04.2021
IE25.04.2021
LU25.04.2021
BE30.04.2021
CH30.04.2021
LI30.04.2021
FR07.06.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IS07.08.2021
PT09.08.2021
Former [2023/33]HU25.04.2017
AL07.04.2021
AT07.04.2021
CY07.04.2021
CZ07.04.2021
DK07.04.2021
EE07.04.2021
ES07.04.2021
FI07.04.2021
HR07.04.2021
IT07.04.2021
LT07.04.2021
LV07.04.2021
MC07.04.2021
NL07.04.2021
PL07.04.2021
RO07.04.2021
RS07.04.2021
SI07.04.2021
SK07.04.2021
SM07.04.2021
IE25.04.2021
LU25.04.2021
BE30.04.2021
CH30.04.2021
LI30.04.2021
FR07.06.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IS07.08.2021
PT09.08.2021
Former [2023/30]AL07.04.2021
AT07.04.2021
CY07.04.2021
CZ07.04.2021
DK07.04.2021
EE07.04.2021
ES07.04.2021
FI07.04.2021
HR07.04.2021
IT07.04.2021
LT07.04.2021
LV07.04.2021
MC07.04.2021
NL07.04.2021
PL07.04.2021
RO07.04.2021
RS07.04.2021
SI07.04.2021
SK07.04.2021
SM07.04.2021
IE25.04.2021
LU25.04.2021
BE30.04.2021
CH30.04.2021
LI30.04.2021
FR07.06.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IS07.08.2021
PT09.08.2021
Former [2022/36]AL07.04.2021
AT07.04.2021
CZ07.04.2021
DK07.04.2021
EE07.04.2021
ES07.04.2021
FI07.04.2021
HR07.04.2021
IT07.04.2021
LT07.04.2021
LV07.04.2021
MC07.04.2021
NL07.04.2021
PL07.04.2021
RO07.04.2021
RS07.04.2021
SI07.04.2021
SK07.04.2021
SM07.04.2021
IE25.04.2021
LU25.04.2021
BE30.04.2021
CH30.04.2021
LI30.04.2021
FR07.06.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IS07.08.2021
PT09.08.2021
Former [2022/34]AL07.04.2021
AT07.04.2021
CZ07.04.2021
DK07.04.2021
EE07.04.2021
ES07.04.2021
FI07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
MC07.04.2021
NL07.04.2021
PL07.04.2021
RO07.04.2021
RS07.04.2021
SI07.04.2021
SK07.04.2021
SM07.04.2021
IE25.04.2021
LU25.04.2021
BE30.04.2021
CH30.04.2021
LI30.04.2021
FR07.06.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IS07.08.2021
PT09.08.2021
Former [2022/29]AL07.04.2021
AT07.04.2021
CZ07.04.2021
DK07.04.2021
EE07.04.2021
ES07.04.2021
FI07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
MC07.04.2021
NL07.04.2021
PL07.04.2021
RO07.04.2021
RS07.04.2021
SI07.04.2021
SK07.04.2021
SM07.04.2021
IE25.04.2021
LU25.04.2021
CH30.04.2021
LI30.04.2021
FR07.06.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IS07.08.2021
PT09.08.2021
Former [2022/26]AL07.04.2021
AT07.04.2021
CZ07.04.2021
DK07.04.2021
EE07.04.2021
ES07.04.2021
FI07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
MC07.04.2021
NL07.04.2021
PL07.04.2021
RO07.04.2021
RS07.04.2021
SK07.04.2021
SM07.04.2021
IE25.04.2021
LU25.04.2021
CH30.04.2021
LI30.04.2021
FR07.06.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IS07.08.2021
PT09.08.2021
Former [2022/23]AT07.04.2021
CZ07.04.2021
DK07.04.2021
EE07.04.2021
ES07.04.2021
FI07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
MC07.04.2021
NL07.04.2021
PL07.04.2021
RO07.04.2021
RS07.04.2021
SK07.04.2021
SM07.04.2021
IE25.04.2021
LU25.04.2021
CH30.04.2021
LI30.04.2021
FR07.06.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IS07.08.2021
PT09.08.2021
Former [2022/21]AT07.04.2021
CZ07.04.2021
DK07.04.2021
EE07.04.2021
ES07.04.2021
FI07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
MC07.04.2021
NL07.04.2021
PL07.04.2021
RO07.04.2021
RS07.04.2021
SK07.04.2021
SM07.04.2021
IE25.04.2021
LU25.04.2021
CH30.04.2021
LI30.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
PT09.08.2021
IS22.12.2021
Former [2022/10]AT07.04.2021
CZ07.04.2021
DK07.04.2021
EE07.04.2021
ES07.04.2021
FI07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
MC07.04.2021
NL07.04.2021
PL07.04.2021
RO07.04.2021
RS07.04.2021
SK07.04.2021
SM07.04.2021
LU25.04.2021
CH30.04.2021
LI30.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
PT09.08.2021
IS22.12.2021
Former [2022/09]AT07.04.2021
CZ07.04.2021
DK07.04.2021
ES07.04.2021
FI07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
MC07.04.2021
NL07.04.2021
PL07.04.2021
RO07.04.2021
RS07.04.2021
SK07.04.2021
SM07.04.2021
LU25.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IS07.08.2021
PT09.08.2021
Former [2022/08]AT07.04.2021
CZ07.04.2021
DK07.04.2021
ES07.04.2021
FI07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
MC07.04.2021
NL07.04.2021
PL07.04.2021
RS07.04.2021
SM07.04.2021
LU25.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IS07.08.2021
PT09.08.2021
Former [2022/07]AT07.04.2021
FI07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
MC07.04.2021
NL07.04.2021
PL07.04.2021
RS07.04.2021
SM07.04.2021
LU25.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IS07.08.2021
PT09.08.2021
Former [2022/04]AT07.04.2021
FI07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
NL07.04.2021
PL07.04.2021
RS07.04.2021
LU25.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IS07.08.2021
PT09.08.2021
Former [2021/52]AT07.04.2021
FI07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
NL07.04.2021
PL07.04.2021
RS07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IS07.08.2021
PT09.08.2021
Former [2021/51]AT07.04.2021
FI07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
NL07.04.2021
RS07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IS07.08.2021
PT09.08.2021
Former [2021/50]AT07.04.2021
FI07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
NL07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
PT09.08.2021
Former [2021/49]AT07.04.2021
FI07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
NL07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
Former [2021/47]AT07.04.2021
FI07.04.2021
LT07.04.2021
NL07.04.2021
BG07.07.2021
Former [2021/46]AT07.04.2021
FI07.04.2021
LT07.04.2021
Documents cited:Search[IA]EP2727234  (ALSTOM TECHNOLOGY LTD [CH]) [I] 1-9 * abstract * * paragraphs [0037] - [0039] - [0 63] - [0065] - [0 68] , [0 99]; figures 1, 9, 10 * [A] 10-15;
 [A]EP2755317  (ALSTOM TECHNOLOGY LTD [CH]) [A] 1-15 * abstract * * paragraph [0020]; figures 1c, 2a, 2b *;
 [A]EP2998752  (ALSTOM TECHNOLOGY LTD [CH]) [A] 1-15 * abstract * * paragraphs [0016] , [0 17]; figures 1a, 1b, 2a, 2b, 5, 7, 8, 10 *;
 [A]  - MERLIN MICHAËL M C ET AL, "Cell capacitor sizing in multilevel converters: cases of the modular multilevel converter and alternate arm converter", IET POWER ELECTRO, IET, UK, (20150301), vol. 8, no. 3, doi:10.1049/IET-PEL.2014.0328, ISSN 1755-4535, pages 350 - 360, XP006051644 [A] 1-15 * abstract * * figure 2 *

DOI:   http://dx.doi.org/10.1049/iet-pel.2014.0328
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.