EP3396784 - HOUSING ASSEMBLY FOR A WET-MATE CONNECTOR, IN PARTICULAR FOR DEEP-SEA APPLICATIONS, HAVING A LATCH MECHANISM ON THE OUTSIDE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 29.10.2021 Database last updated on 03.06.2024 | |
Former | The patent has been granted Status updated on 20.11.2020 | ||
Former | Grant of patent is intended Status updated on 13.07.2020 | ||
Former | Examination is in progress Status updated on 09.10.2019 | ||
Former | Request for examination was made Status updated on 10.05.2019 | ||
Former | The application has been published Status updated on 28.09.2018 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states Precision Subsea AS Merdeveien 1 3676 Notodden / NO | [2018/44] | Inventor(s) | 01 /
AASE, Oddbjorn Surtevjuvegen 56 3677 Notodden / NO | 02 /
JOHANSEN, John Aleksander Helene Semsvei 27 3610 Kongsberg / NO | [2018/44] | Representative(s) | Grünecker Patent- und Rechtsanwälte PartG mbB Leopoldstraße 4 80802 München / DE | [2018/44] | Application number, filing date | 17168649.6 | 28.04.2017 | [2018/44] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3396784 | Date: | 31.10.2018 | Language: | EN | [2018/44] | Type: | B1 Patent specification | No.: | EP3396784 | Date: | 23.12.2020 | Language: | EN | [2020/52] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 06.07.2017 | Classification | IPC: | H01R13/523, H01R13/627, // H01R13/641, H01R13/533 | [2018/44] | CPC: |
H01R13/6277 (EP);
H01R13/523 (EP);
H01R13/533 (EP);
H01R13/641 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/24] |
Former [2018/44] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | GEHÄUSEANORDNUNG FÜR EINEN WET-MATE-VERBINDER, INSBESONDERE FÜR HOCHSEEANWENDUNGEN MIT EINEM VERRIEGELUNGSMECHANISMUS AUF DER AUSSENSEITE | [2018/44] | English: | HOUSING ASSEMBLY FOR A WET-MATE CONNECTOR, IN PARTICULAR FOR DEEP-SEA APPLICATIONS, HAVING A LATCH MECHANISM ON THE OUTSIDE | [2018/44] | French: | ENSEMBLE BOÎTIER POUR UN CONNECTEUR À COUPLAGE HUMIDE, EN PARTICULIER POUR DES APPLICATIONS EN HAUTE MER, COMPORTANT UN MÉCANISME DE VERROUILLAGE SUR L'EXTÉRIEUR | [2018/44] | Examination procedure | 29.04.2019 | Amendment by applicant (claims and/or description) | 29.04.2019 | Examination requested [2019/24] | 29.04.2019 | Date on which the examining division has become responsible | 14.10.2019 | Despatch of a communication from the examining division (Time limit: M04) | 24.02.2020 | Reply to a communication from the examining division | 14.07.2020 | Communication of intention to grant the patent | 12.11.2020 | Fee for grant paid | 12.11.2020 | Fee for publishing/printing paid | 12.11.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 24.09.2021 | No opposition filed within time limit [2021/48] | Fees paid | Renewal fee | 15.04.2019 | Renewal fee patent year 03 | 31.03.2020 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 28.04.2017 | AL | 23.12.2020 | AT | 23.12.2020 | CY | 23.12.2020 | CZ | 23.12.2020 | DK | 23.12.2020 | EE | 23.12.2020 | ES | 23.12.2020 | FI | 23.12.2020 | HR | 23.12.2020 | IT | 23.12.2020 | LT | 23.12.2020 | LV | 23.12.2020 | MC | 23.12.2020 | MK | 23.12.2020 | NL | 23.12.2020 | PL | 23.12.2020 | RO | 23.12.2020 | RS | 23.12.2020 | SE | 23.12.2020 | SI | 23.12.2020 | SK | 23.12.2020 | SM | 23.12.2020 | BG | 23.03.2021 | NO | 23.03.2021 | GR | 24.03.2021 | IS | 23.04.2021 | PT | 23.04.2021 | IE | 28.04.2021 | LU | 28.04.2021 | BE | 30.04.2021 | CH | 30.04.2021 | LI | 30.04.2021 | [2024/22] |
Former [2023/33] | HU | 28.04.2017 | |
AL | 23.12.2020 | ||
AT | 23.12.2020 | ||
CY | 23.12.2020 | ||
CZ | 23.12.2020 | ||
DK | 23.12.2020 | ||
EE | 23.12.2020 | ||
ES | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
IT | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
MC | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SI | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
IS | 23.04.2021 | ||
PT | 23.04.2021 | ||
IE | 28.04.2021 | ||
LU | 28.04.2021 | ||
BE | 30.04.2021 | ||
CH | 30.04.2021 | ||
LI | 30.04.2021 | ||
Former [2023/30] | AL | 23.12.2020 | |
AT | 23.12.2020 | ||
CY | 23.12.2020 | ||
CZ | 23.12.2020 | ||
DK | 23.12.2020 | ||
EE | 23.12.2020 | ||
ES | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
IT | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
MC | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SI | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
IS | 23.04.2021 | ||
PT | 23.04.2021 | ||
IE | 28.04.2021 | ||
LU | 28.04.2021 | ||
BE | 30.04.2021 | ||
CH | 30.04.2021 | ||
LI | 30.04.2021 | ||
Former [2022/34] | AL | 23.12.2020 | |
AT | 23.12.2020 | ||
CZ | 23.12.2020 | ||
DK | 23.12.2020 | ||
EE | 23.12.2020 | ||
ES | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
IT | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
MC | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SI | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
IS | 23.04.2021 | ||
PT | 23.04.2021 | ||
IE | 28.04.2021 | ||
LU | 28.04.2021 | ||
BE | 30.04.2021 | ||
CH | 30.04.2021 | ||
LI | 30.04.2021 | ||
Former [2022/23] | AL | 23.12.2020 | |
AT | 23.12.2020 | ||
CZ | 23.12.2020 | ||
DK | 23.12.2020 | ||
EE | 23.12.2020 | ||
ES | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
IT | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
MC | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SI | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
IS | 23.04.2021 | ||
PT | 23.04.2021 | ||
IE | 28.04.2021 | ||
LU | 28.04.2021 | ||
CH | 30.04.2021 | ||
LI | 30.04.2021 | ||
Former [2022/21] | AL | 23.12.2020 | |
AT | 23.12.2020 | ||
CZ | 23.12.2020 | ||
DK | 23.12.2020 | ||
EE | 23.12.2020 | ||
ES | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
IT | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
MC | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SI | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
PT | 23.04.2021 | ||
IE | 28.04.2021 | ||
LU | 28.04.2021 | ||
CH | 30.04.2021 | ||
LI | 30.04.2021 | ||
Former [2022/11] | AL | 23.12.2020 | |
AT | 23.12.2020 | ||
CZ | 23.12.2020 | ||
DK | 23.12.2020 | ||
EE | 23.12.2020 | ||
ES | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
IT | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
MC | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SI | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
PT | 23.04.2021 | ||
LU | 28.04.2021 | ||
CH | 30.04.2021 | ||
LI | 30.04.2021 | ||
Former [2022/10] | AL | 23.12.2020 | |
AT | 23.12.2020 | ||
CZ | 23.12.2020 | ||
DK | 23.12.2020 | ||
EE | 23.12.2020 | ||
ES | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
IT | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
MC | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
PT | 23.04.2021 | ||
LU | 28.04.2021 | ||
CH | 30.04.2021 | ||
LI | 30.04.2021 | ||
Former [2022/08] | AL | 23.12.2020 | |
AT | 23.12.2020 | ||
CZ | 23.12.2020 | ||
DK | 23.12.2020 | ||
EE | 23.12.2020 | ||
ES | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
IT | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
MC | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
IS | 23.04.2021 | ||
PT | 23.04.2021 | ||
LU | 28.04.2021 | ||
Former [2022/04] | AL | 23.12.2020 | |
AT | 23.12.2020 | ||
CZ | 23.12.2020 | ||
DK | 23.12.2020 | ||
EE | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
IT | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
MC | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
IS | 23.04.2021 | ||
PT | 23.04.2021 | ||
LU | 28.04.2021 | ||
Former [2021/50] | AL | 23.12.2020 | |
AT | 23.12.2020 | ||
CZ | 23.12.2020 | ||
DK | 23.12.2020 | ||
EE | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
IT | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
MC | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
IS | 23.04.2021 | ||
PT | 23.04.2021 | ||
Former [2021/49] | AL | 23.12.2020 | |
AT | 23.12.2020 | ||
CZ | 23.12.2020 | ||
DK | 23.12.2020 | ||
EE | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
IT | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
IS | 23.04.2021 | ||
PT | 23.04.2021 | ||
Former [2021/48] | AL | 23.12.2020 | |
AT | 23.12.2020 | ||
CZ | 23.12.2020 | ||
EE | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
IT | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
IS | 23.04.2021 | ||
PT | 23.04.2021 | ||
Former [2021/45] | AL | 23.12.2020 | |
AT | 23.12.2020 | ||
CZ | 23.12.2020 | ||
EE | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
IS | 23.04.2021 | ||
PT | 23.04.2021 | ||
Former [2021/42] | AT | 23.12.2020 | |
CZ | 23.12.2020 | ||
EE | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
IS | 23.04.2021 | ||
PT | 23.04.2021 | ||
Former [2021/39] | AT | 23.12.2020 | |
CZ | 23.12.2020 | ||
EE | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
PT | 23.04.2021 | ||
Former [2021/37] | AT | 23.12.2020 | |
CZ | 23.12.2020 | ||
EE | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
NL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
PT | 23.04.2021 | ||
Former [2021/36] | CZ | 23.12.2020 | |
EE | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
NL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
PT | 23.04.2021 | ||
Former [2021/35] | CZ | 23.12.2020 | |
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
NL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
PT | 23.04.2021 | ||
Former [2021/33] | FI | 23.12.2020 | |
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
NL | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
PT | 23.04.2021 | ||
Former [2021/32] | FI | 23.12.2020 | |
HR | 23.12.2020 | ||
LV | 23.12.2020 | ||
NL | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
Former [2021/30] | FI | 23.12.2020 | |
HR | 23.12.2020 | ||
LV | 23.12.2020 | ||
NL | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
Former [2021/28] | FI | 23.12.2020 | |
HR | 23.12.2020 | ||
LV | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
Former [2021/23] | FI | 23.12.2020 | |
LV | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
Former [2021/22] | FI | 23.12.2020 | |
RS | 23.12.2020 | ||
NO | 23.03.2021 | ||
Former [2021/20] | FI | 23.12.2020 | Documents cited: | Search | [Y]US3665368 (ELLIS JOHN H) [Y] 11,12 * column 2, lines 47-54; figure 1 *; | [Y]US5011426 (COLLERAN STEPHEN A [US], et al) [Y] 7* figure 1 *; | [Y]US2014106602 (HIRAMATSU HIROYUKI [JP]) [Y] 9,13 * figures 12, 14 *; | [XYI]EP2996205 (CARRIER KHEOPS BAC [FR]) [X] 1,3-6,8,10,14,15 * figures 1-6 * [Y] 7,9,11-13 [I] 2 | by applicant | US2009080836 | WO2011011361 | US8388235 | CN104505653 | CN104538789 | WO2015068050 | US9270051 | GB2532037 |