EP3243976 - PANEL SPLICE CONNECTOR FOR LINEAR CEILING PANELS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 17.02.2023 Database last updated on 30.10.2024 | |
Former | The patent has been granted Status updated on 11.03.2022 | ||
Former | Grant of patent is intended Status updated on 12.10.2021 | ||
Former | Examination is in progress Status updated on 08.01.2020 | ||
Former | Request for examination was made Status updated on 18.05.2018 | ||
Former | The application has been published Status updated on 13.10.2017 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Hunter Douglas Industries B.V. Piekstraat 2 3071 EL Rotterdam / NL | [2017/46] | Inventor(s) | 01 /
DE GOEIJ, Hans Kurt c/o HUNTER DOUGLAS INDUSTRIES B.V. 2 Piekstraat 3071 EL Rotterdam / NL | 02 /
VAN KOPPEN, Jacob Willem Krijn c/o HUNTER DOUGLAS INDUSTRIES B.V. 2 Piekstraat 3071 EL Rotterdam / NL | [2017/46] | Representative(s) | J A Kemp LLP 80 Turnmill Street London EC1M 5QU / GB | [2022/15] |
Former [2017/46] | J A Kemp 14 South Square Gray's Inn London WC1R 5JJ / GB | Application number, filing date | 17169788.1 | 05.05.2017 | [2017/46] | Priority number, date | NL20161041856 | 09.05.2016 Original published format: NL 1041856 | [2017/46] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3243976 | Date: | 15.11.2017 | Language: | EN | [2017/46] | Type: | B1 Patent specification | No.: | EP3243976 | Date: | 13.04.2022 | Language: | EN | [2022/15] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 25.09.2017 | Classification | IPC: | E04F13/08, E04F13/12 | [2021/32] | CPC: |
E04F13/12 (EP);
F16B5/0642 (US);
E04F13/08 (US);
E04F2201/05 (EP)
|
Former IPC [2017/46] | E04F13/08 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/25] |
Former [2017/46] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | PLATTENSPLEISSVERBINDER FÜR LINEARE DECKENPLATTEN | [2017/46] | English: | PANEL SPLICE CONNECTOR FOR LINEAR CEILING PANELS | [2017/46] | French: | CONNECTEUR D'ÉPISSURE DE PANNEAU POUR DES PANNEAUX DE PLAFOND LINÉAIRES | [2021/41] |
Former [2017/46] | CONNECTEUR D'ÉPISSURE DE PANNEAU POUR DES PANNEAUX DE PLAFOND LINÉAIRES | Examination procedure | 05.05.2017 | Date on which the examining division has become responsible | 11.05.2018 | Examination requested [2018/25] | 22.06.2018 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report not received in time | 13.08.2018 | Amendment by applicant (claims and/or description) | 13.01.2020 | Despatch of a communication from the examining division (Time limit: M06) | 23.06.2020 | Reply to a communication from the examining division | 27.10.2021 | Communication of intention to grant the patent | 04.03.2022 | Fee for grant paid | 04.03.2022 | Fee for publishing/printing paid | 04.03.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 16.01.2023 | No opposition filed within time limit [2023/12] | Request for further processing for: | The application is deemed to be withdrawn due to failure to reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report/Supplementary European search report | 13.08.2018 | Request for further processing filed | 13.08.2018 | Full payment received (date of receipt of payment) Request granted | 04.09.2018 | Decision despatched | Fees paid | Renewal fee | 15.05.2019 | Renewal fee patent year 03 | 14.05.2020 | Renewal fee patent year 04 | 12.05.2021 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 05.05.2017 | AL | 13.04.2022 | AT | 13.04.2022 | CY | 13.04.2022 | CZ | 13.04.2022 | DK | 13.04.2022 | EE | 13.04.2022 | ES | 13.04.2022 | FI | 13.04.2022 | HR | 13.04.2022 | IT | 13.04.2022 | LT | 13.04.2022 | LV | 13.04.2022 | MC | 13.04.2022 | MK | 13.04.2022 | MT | 13.04.2022 | PL | 13.04.2022 | RO | 13.04.2022 | RS | 13.04.2022 | SE | 13.04.2022 | SI | 13.04.2022 | SK | 13.04.2022 | SM | 13.04.2022 | IE | 05.05.2022 | LU | 05.05.2022 | BE | 31.05.2022 | CH | 31.05.2022 | LI | 31.05.2022 | BG | 13.07.2022 | NO | 13.07.2022 | GR | 14.07.2022 | IS | 13.08.2022 | PT | 16.08.2022 | [2024/42] |
Former [2024/22] | HU | 05.05.2017 | |
AL | 13.04.2022 | ||
AT | 13.04.2022 | ||
CY | 13.04.2022 | ||
CZ | 13.04.2022 | ||
DK | 13.04.2022 | ||
EE | 13.04.2022 | ||
ES | 13.04.2022 | ||
FI | 13.04.2022 | ||
HR | 13.04.2022 | ||
IT | 13.04.2022 | ||
LT | 13.04.2022 | ||
LV | 13.04.2022 | ||
MC | 13.04.2022 | ||
MK | 13.04.2022 | ||
PL | 13.04.2022 | ||
RO | 13.04.2022 | ||
RS | 13.04.2022 | ||
SE | 13.04.2022 | ||
SI | 13.04.2022 | ||
SK | 13.04.2022 | ||
SM | 13.04.2022 | ||
IE | 05.05.2022 | ||
LU | 05.05.2022 | ||
BE | 31.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
BG | 13.07.2022 | ||
NO | 13.07.2022 | ||
GR | 14.07.2022 | ||
IS | 13.08.2022 | ||
PT | 16.08.2022 | ||
Former [2024/20] | HU | 05.05.2017 | |
AL | 13.04.2022 | ||
AT | 13.04.2022 | ||
CY | 13.04.2022 | ||
CZ | 13.04.2022 | ||
DK | 13.04.2022 | ||
EE | 13.04.2022 | ||
ES | 13.04.2022 | ||
FI | 13.04.2022 | ||
HR | 13.04.2022 | ||
IT | 13.04.2022 | ||
LT | 13.04.2022 | ||
LV | 13.04.2022 | ||
MC | 13.04.2022 | ||
PL | 13.04.2022 | ||
RO | 13.04.2022 | ||
RS | 13.04.2022 | ||
SE | 13.04.2022 | ||
SI | 13.04.2022 | ||
SK | 13.04.2022 | ||
SM | 13.04.2022 | ||
IE | 05.05.2022 | ||
LU | 05.05.2022 | ||
BE | 31.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
BG | 13.07.2022 | ||
NO | 13.07.2022 | ||
GR | 14.07.2022 | ||
IS | 13.08.2022 | ||
PT | 16.08.2022 | ||
Former [2024/18] | HU | 05.05.2017 | |
AL | 13.04.2022 | ||
AT | 13.04.2022 | ||
CZ | 13.04.2022 | ||
DK | 13.04.2022 | ||
EE | 13.04.2022 | ||
ES | 13.04.2022 | ||
FI | 13.04.2022 | ||
HR | 13.04.2022 | ||
IT | 13.04.2022 | ||
LT | 13.04.2022 | ||
LV | 13.04.2022 | ||
MC | 13.04.2022 | ||
PL | 13.04.2022 | ||
RO | 13.04.2022 | ||
RS | 13.04.2022 | ||
SE | 13.04.2022 | ||
SI | 13.04.2022 | ||
SK | 13.04.2022 | ||
SM | 13.04.2022 | ||
IE | 05.05.2022 | ||
LU | 05.05.2022 | ||
BE | 31.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
BG | 13.07.2022 | ||
NO | 13.07.2022 | ||
GR | 14.07.2022 | ||
IS | 13.08.2022 | ||
PT | 16.08.2022 | ||
Former [2024/11] | AL | 13.04.2022 | |
AT | 13.04.2022 | ||
CZ | 13.04.2022 | ||
DK | 13.04.2022 | ||
EE | 13.04.2022 | ||
ES | 13.04.2022 | ||
FI | 13.04.2022 | ||
HR | 13.04.2022 | ||
IT | 13.04.2022 | ||
LT | 13.04.2022 | ||
LV | 13.04.2022 | ||
MC | 13.04.2022 | ||
PL | 13.04.2022 | ||
RO | 13.04.2022 | ||
RS | 13.04.2022 | ||
SE | 13.04.2022 | ||
SI | 13.04.2022 | ||
SK | 13.04.2022 | ||
SM | 13.04.2022 | ||
IE | 05.05.2022 | ||
LU | 05.05.2022 | ||
BE | 31.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
BG | 13.07.2022 | ||
NO | 13.07.2022 | ||
GR | 14.07.2022 | ||
IS | 13.08.2022 | ||
PT | 16.08.2022 | ||
Former [2023/25] | AL | 13.04.2022 | |
AT | 13.04.2022 | ||
CZ | 13.04.2022 | ||
DK | 13.04.2022 | ||
EE | 13.04.2022 | ||
ES | 13.04.2022 | ||
FI | 13.04.2022 | ||
HR | 13.04.2022 | ||
LT | 13.04.2022 | ||
LV | 13.04.2022 | ||
MC | 13.04.2022 | ||
PL | 13.04.2022 | ||
RO | 13.04.2022 | ||
RS | 13.04.2022 | ||
SE | 13.04.2022 | ||
SI | 13.04.2022 | ||
SK | 13.04.2022 | ||
SM | 13.04.2022 | ||
IE | 05.05.2022 | ||
LU | 05.05.2022 | ||
BE | 31.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
BG | 13.07.2022 | ||
NO | 13.07.2022 | ||
GR | 14.07.2022 | ||
IS | 13.08.2022 | ||
PT | 16.08.2022 | ||
Former [2023/20] | AL | 13.04.2022 | |
AT | 13.04.2022 | ||
CZ | 13.04.2022 | ||
DK | 13.04.2022 | ||
EE | 13.04.2022 | ||
ES | 13.04.2022 | ||
FI | 13.04.2022 | ||
HR | 13.04.2022 | ||
LT | 13.04.2022 | ||
LV | 13.04.2022 | ||
MC | 13.04.2022 | ||
PL | 13.04.2022 | ||
RO | 13.04.2022 | ||
RS | 13.04.2022 | ||
SE | 13.04.2022 | ||
SK | 13.04.2022 | ||
SM | 13.04.2022 | ||
IE | 05.05.2022 | ||
LU | 05.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
BG | 13.07.2022 | ||
NO | 13.07.2022 | ||
GR | 14.07.2022 | ||
IS | 13.08.2022 | ||
PT | 16.08.2022 | ||
Former [2023/17] | AL | 13.04.2022 | |
AT | 13.04.2022 | ||
CZ | 13.04.2022 | ||
DK | 13.04.2022 | ||
EE | 13.04.2022 | ||
ES | 13.04.2022 | ||
FI | 13.04.2022 | ||
HR | 13.04.2022 | ||
LT | 13.04.2022 | ||
LV | 13.04.2022 | ||
MC | 13.04.2022 | ||
PL | 13.04.2022 | ||
RO | 13.04.2022 | ||
RS | 13.04.2022 | ||
SE | 13.04.2022 | ||
SK | 13.04.2022 | ||
SM | 13.04.2022 | ||
LU | 05.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
BG | 13.07.2022 | ||
NO | 13.07.2022 | ||
GR | 14.07.2022 | ||
IS | 13.08.2022 | ||
PT | 16.08.2022 | ||
Former [2023/09] | AT | 13.04.2022 | |
CZ | 13.04.2022 | ||
DK | 13.04.2022 | ||
EE | 13.04.2022 | ||
ES | 13.04.2022 | ||
FI | 13.04.2022 | ||
HR | 13.04.2022 | ||
LT | 13.04.2022 | ||
LV | 13.04.2022 | ||
MC | 13.04.2022 | ||
PL | 13.04.2022 | ||
RO | 13.04.2022 | ||
RS | 13.04.2022 | ||
SE | 13.04.2022 | ||
SK | 13.04.2022 | ||
SM | 13.04.2022 | ||
LU | 05.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
BG | 13.07.2022 | ||
NO | 13.07.2022 | ||
GR | 14.07.2022 | ||
IS | 13.08.2022 | ||
PT | 16.08.2022 | ||
Former [2023/08] | AT | 13.04.2022 | |
DK | 13.04.2022 | ||
ES | 13.04.2022 | ||
FI | 13.04.2022 | ||
HR | 13.04.2022 | ||
LT | 13.04.2022 | ||
LV | 13.04.2022 | ||
MC | 13.04.2022 | ||
PL | 13.04.2022 | ||
RS | 13.04.2022 | ||
SE | 13.04.2022 | ||
LU | 05.05.2022 | ||
BG | 13.07.2022 | ||
NO | 13.07.2022 | ||
GR | 14.07.2022 | ||
IS | 13.08.2022 | ||
PT | 16.08.2022 | ||
Former [2023/07] | AT | 13.04.2022 | |
DK | 13.04.2022 | ||
ES | 13.04.2022 | ||
FI | 13.04.2022 | ||
HR | 13.04.2022 | ||
LT | 13.04.2022 | ||
LV | 13.04.2022 | ||
PL | 13.04.2022 | ||
RS | 13.04.2022 | ||
SE | 13.04.2022 | ||
BG | 13.07.2022 | ||
NO | 13.07.2022 | ||
GR | 14.07.2022 | ||
IS | 13.08.2022 | ||
PT | 16.08.2022 | ||
Former [2022/51] | AT | 13.04.2022 | |
ES | 13.04.2022 | ||
FI | 13.04.2022 | ||
HR | 13.04.2022 | ||
LT | 13.04.2022 | ||
LV | 13.04.2022 | ||
PL | 13.04.2022 | ||
RS | 13.04.2022 | ||
SE | 13.04.2022 | ||
BG | 13.07.2022 | ||
NO | 13.07.2022 | ||
GR | 14.07.2022 | ||
IS | 13.08.2022 | ||
PT | 16.08.2022 | ||
Former [2022/50] | AT | 13.04.2022 | |
ES | 13.04.2022 | ||
FI | 13.04.2022 | ||
HR | 13.04.2022 | ||
LT | 13.04.2022 | ||
LV | 13.04.2022 | ||
PL | 13.04.2022 | ||
RS | 13.04.2022 | ||
SE | 13.04.2022 | ||
BG | 13.07.2022 | ||
NO | 13.07.2022 | ||
GR | 14.07.2022 | ||
PT | 16.08.2022 | ||
Former [2022/49] | AT | 13.04.2022 | |
ES | 13.04.2022 | ||
FI | 13.04.2022 | ||
HR | 13.04.2022 | ||
LT | 13.04.2022 | ||
LV | 13.04.2022 | ||
SE | 13.04.2022 | ||
BG | 13.07.2022 | ||
NO | 13.07.2022 | ||
GR | 14.07.2022 | ||
PT | 16.08.2022 | ||
Former [2022/47] | AT | 13.04.2022 | |
ES | 13.04.2022 | ||
FI | 13.04.2022 | ||
LT | 13.04.2022 | ||
SE | 13.04.2022 | ||
NO | 13.07.2022 | ||
PT | 16.08.2022 | Documents cited: | Search | [XA]US3336711 (MENKE HENRY F) [X] 1,13 * column 2, line 51 - column 3, line 14; figures 1-4; claims 2, 3 * [A] 2-12,14,15; | [XI]US3509675 (MCCLAIN RICHARD C) [X] 1-3,7,11-13 * column 3, line 59 - column 4, line 38; figures 1-5 * [I] 4-6,8-10,14,15; | [XA]EP0062756 (ROBERTSON CO H H [US]) [X] 1,13 * page 13, paragraph 2 - page 15, paragraph 1; figures 1, 9A-9D * [A] 2-12,14,15; | [A]WO2008003232 (LENG LUHAO [CN]) [A] 1,13-15* abstract * | Examination | EP0095021 | DE4322631 | US6146048 | FR2856444 |