blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3244678

EP3244678 - FACILITATING DETECTION OF CONTROL CHANNELS WITH DIFFERENT TRANSMISSION TIME INTERVALS IN A WIRELESS COMMUNICATION SYSTEM [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  05.03.2021
Database last updated on 13.07.2024
FormerThe patent has been granted
Status updated on  27.03.2020
FormerGrant of patent is intended
Status updated on  04.02.2020
FormerExamination is in progress
Status updated on  29.03.2019
FormerRequest for examination was made
Status updated on  06.04.2018
FormerThe application has been published
Status updated on  13.10.2017
Most recent event   Tooltip15.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 17.08.2022  [2022/33]
Applicant(s)For all designated states
ASUSTek Computer Inc.
No. 15, Lite Rd., Peitou Dist.
Taipei City 112 / TW
[2020/18]
Former [2017/46]For all designated states
ASUSTek Computer Inc.
No. 15, Lite Road
Peitou, Taipei-City 112 / TW
Inventor(s)01 / TSENG, Li-Chih
c/o ASUSTek Computer Inc.
No.15, Lite Rd.
Peitou Dist.
Taipei City 112 / TW
02 / LIN, Ko-Chiang
c/o ASUSTek Computer Inc.
No.15, Lite Rd.
Peitou Dist.
Taipei City 112 / TW
03 / LI, Ming-Che
c/o ASUSTek Computer Inc.
No.15, Lite Rd.
Peitou Dist.
Taipei City 112 / TW
 [2020/18]
Former [2017/46]01 / TSENG, Li-Chih
c/o ASUSTek Computer Inc.
No.15, Lite Rd., Peitou Dist.
112 Taipei City / TW
02 / LIN, Ko-Chiang
c/o ASUSTek Computer Inc.
No.15, Lite Rd., Peitou Dist.
112 Taipei City / TW
03 / LI, Ming-Che
c/o ASUSTek Computer Inc.
No.15, Lite Rd., Peitou Dist.
112 Taipei City / TW
Representative(s)Hoefer & Partner Patentanwälte mbB
Pilgersheimer Straße 20
81543 München / DE
[2017/46]
Application number, filing date17170834.012.05.2017
[2017/46]
Priority number, dateUS201662335517P12.05.2016         Original published format: US 201662335517 P
[2017/46]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3244678
Date:15.11.2017
Language:EN
[2017/46]
Type: B1 Patent specification 
No.:EP3244678
Date:29.04.2020
Language:EN
[2020/18]
Search report(s)(Supplementary) European search report - dispatched on:EP06.10.2017
ClassificationIPC:H04W72/04, H04W72/12, H04W74/00, H04L5/00
[2020/08]
CPC:
H04W74/006 (EP,US); H04L5/0053 (EP,CN,KR,US); H04W72/0446 (CN,US);
H04L1/0013 (CN); H04L1/0027 (CN); H04L1/0061 (CN);
H04L5/0007 (KR); H04L5/0037 (KR); H04W24/00 (US);
H04W52/143 (US); H04W72/21 (US); H04W72/23 (EP,CN,KR,US);
H04L5/0005 (CN); H04L5/0048 (CN); H04L5/0094 (CN) (-)
Former IPC [2017/46]H04W72/04, H04W72/12, H04W74/00
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/19]
Former [2017/46]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:ERLEICHTERUNG DES NACHWEISES VON STEUERKANÄLEN MIT UNTERSCHIEDLICHEN ÜBERTRAGUNGSZEITINTERVALLEN IN EINEM DRAHTLOSKOMMUNIKATIONSSYSTEM[2017/46]
English:FACILITATING DETECTION OF CONTROL CHANNELS WITH DIFFERENT TRANSMISSION TIME INTERVALS IN A WIRELESS COMMUNICATION SYSTEM[2017/46]
French:FACILITATION DE LA DÉTECTION DE CANAUX DE COMMANDE AYANT DIFFÉRENTS INTERVALLES DE TEMPS DE TRANSMISSION DANS UN SYSTÈME DE COMMUNICATION SANS FIL[2017/46]
Examination procedure12.05.2017Date on which the examining division has become responsible
28.03.2018Amendment by applicant (claims and/or description)
28.03.2018Examination requested  [2018/19]
02.04.2019Despatch of a communication from the examining division (Time limit: M04)
05.08.2019Reply to a communication from the examining division
05.02.2020Communication of intention to grant the patent
19.03.2020Fee for grant paid
19.03.2020Fee for publishing/printing paid
19.03.2020Receipt of the translation of the claim(s)
Opposition(s)01.02.2021No opposition filed within time limit [2021/14]
Fees paidRenewal fee
31.05.2019Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU12.05.2017
AL29.04.2020
AT29.04.2020
CY29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
MC29.04.2020
MK29.04.2020
MT29.04.2020
NL29.04.2020
PL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SI29.04.2020
SK29.04.2020
SM29.04.2020
TR29.04.2020
IE12.05.2020
LU12.05.2020
BE31.05.2020
CH31.05.2020
LI31.05.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
[2022/33]
Former [2022/27]HU12.05.2017
AL29.04.2020
AT29.04.2020
CY29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
MC29.04.2020
MT29.04.2020
NL29.04.2020
PL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SI29.04.2020
SK29.04.2020
SM29.04.2020
TR29.04.2020
IE12.05.2020
LU12.05.2020
BE31.05.2020
CH31.05.2020
LI31.05.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2021/24]AL29.04.2020
AT29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
MC29.04.2020
NL29.04.2020
PL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SI29.04.2020
SK29.04.2020
SM29.04.2020
IE12.05.2020
LU12.05.2020
BE31.05.2020
CH31.05.2020
LI31.05.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2021/20]AL29.04.2020
AT29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
MC29.04.2020
NL29.04.2020
PL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SK29.04.2020
SM29.04.2020
IE12.05.2020
LU12.05.2020
CH31.05.2020
LI31.05.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2021/15]AL29.04.2020
AT29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
MC29.04.2020
NL29.04.2020
PL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SK29.04.2020
SM29.04.2020
LU12.05.2020
CH31.05.2020
LI31.05.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2021/10]AL29.04.2020
AT29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
MC29.04.2020
NL29.04.2020
PL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SK29.04.2020
SM29.04.2020
CH31.05.2020
LI31.05.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2021/09]AL29.04.2020
AT29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
MC29.04.2020
NL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SM29.04.2020
CH31.05.2020
LI31.05.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2021/08]AL29.04.2020
DK29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
LT29.04.2020
LV29.04.2020
NL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SM29.04.2020
CH31.05.2020
LI31.05.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2021/04]AL29.04.2020
FI29.04.2020
HR29.04.2020
LT29.04.2020
LV29.04.2020
NL29.04.2020
RS29.04.2020
SE29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2021/01]FI29.04.2020
HR29.04.2020
LT29.04.2020
LV29.04.2020
RS29.04.2020
SE29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2020/51]FI29.04.2020
HR29.04.2020
LT29.04.2020
LV29.04.2020
RS29.04.2020
SE29.04.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2020/50]FI29.04.2020
HR29.04.2020
LT29.04.2020
LV29.04.2020
SE29.04.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2020/48]FI29.04.2020
LT29.04.2020
SE29.04.2020
NO29.07.2020
IS29.08.2020
PT31.08.2020
Former [2020/47]LT29.04.2020
NO29.07.2020
IS29.08.2020
Former [2020/46]IS29.08.2020
Documents cited:Search[XI]US2016128028  (MALLIK SIDDHARTHA [US], et al) [X] 1-3,5,6,8-10,12-17 * abstract * * figures 3B-18 * * paragraphs [0003] , [0007] , [0009] , [0010] , [0012] , [0014] , [0016] , [0043] - [0048] * * paragraphs [0058] - [0061] - [0069] - [0078] - [0087] - [0106] - [0120] , [0140] , [0142] , [0170] , [0171] * * claims 1-55 * [I] 4,7,11;
 [A]  - ERICSSON, "Downlink control signaling design for short TTI", vol. RAN WG1, no. Busan; 20160411 - 20160415, (20160401), 3GPP DRAFT; R1-163322_DOWNLINK CONTROL SIGNAL DESIGN FOR SHORT TTI, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRA, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_84b/Docs/, (20160401), XP051079812 [A] 1-17 * the whole document *
 [A]  - QUALCOMM INCORPORATED, "DL channel design for shortened TTI", vol. RAN WG1, no. Busan, Korea; 20160411 - 20160415, (20160402), 3GPP DRAFT; R1-163068 DL CHANNEL DESIGN FOR SHORTENED TTI, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_84b/Docs/, (20160402), XP051080512 [A] 1-17 * the whole document *
ExaminationWO2016064049
    - HUAWEI ET AL, "DCI design for short TTI", vol. RAN WG1, no. Busan, Korea; 20160411 - 20160415, (20160402), 3GPP DRAFT; R1-162588, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_84b/Docs/, (20160402), XP051080276
by applicant   - "E-UTRA Physical layer procedures (Release 13", 3GPP TS 36.213 VL3.1.1
    - "E-UTRA Study on latency reduction techniques for LTE (Release 13", 3GPP TR 36.211 V13.1.0
    - "E-UTRA Study on latency reduction techniques for LTE (Release 13", 3GPP TR 36.211 V 13.1.0
    - "On design of DL control channel for shorter TTI operation", RL-163267, 3GPP TSG-RAN WG1 MEETING #84BIS
    - "User throughput evaluation on mobility events", 3GPP TSG-RAN WG2 MEETING #93BIS
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.