blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3252909

EP3252909 - PHOTOVOLTAIC POWER DEVICE AND WIRING [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  06.11.2020
Database last updated on 15.06.2024
FormerThe patent has been granted
Status updated on  05.12.2019
FormerGrant of patent is intended
Status updated on  11.07.2019
FormerExamination is in progress
Status updated on  30.11.2018
FormerRequest for examination was made
Status updated on  23.11.2018
FormerGrant of patent is intended
Status updated on  16.07.2018
FormerRequest for examination was made
Status updated on  15.06.2018
FormerThe application has been published
Status updated on  03.11.2017
Most recent event   Tooltip15.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 17.08.2022  [2022/33]
Applicant(s)For all designated states
Solaredge Technologies Ltd.
1 HaMada Street
4673335 Herzeliya / IL
[2018/35]
Former [2017/49]For all designated states
Solaredge Technologies Ltd.
Hamada Street 1
4673335 Herzliya / IL
Inventor(s)01 / Yoscovich, Ilan
c/o Solaredge Technologies Ltd.
1 HaMada Street
4673335 Herzeliya / IL
02 / Glovinsky, Tzachi
c/o Solaredge Technologies Ltd.
1 HaMada Street
4673335 Herzeliya / IL
03 / Bieber, Ofir
c/o Solaredge Technologies Ltd.
1 HaMada Street
4673335 Herzeliya / IL
 [2017/49]
Representative(s)V.O.
P.O. Box 87930
Carnegieplein 5
2508 DH Den Haag / NL
[2017/49]
Application number, filing date17171489.217.05.2017
[2017/49]
Priority number, dateUS201662341147P25.05.2016         Original published format: US 201662341147 P
US201662395461P16.09.2016         Original published format: US 201662395461 P
[2017/49]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3252909
Date:06.12.2017
Language:EN
[2017/49]
Type: B1 Patent specification 
No.:EP3252909
Date:01.01.2020
Language:EN
[2020/01]
Search report(s)(Supplementary) European search report - dispatched on:EP07.11.2017
ClassificationIPC:H02J3/38
[2017/49]
CPC:
H02J3/381 (EP,US); H02S40/30 (CN); H02J3/38 (US);
H02S10/00 (CN); H02S40/32 (EP,US); H02S40/34 (EP,US);
H02S50/10 (EP,US); H02J1/00 (EP,US); H02J2300/24 (EP,US);
H02J2300/26 (EP,US); H02J7/35 (EP,US); Y02E10/56 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/29]
Former [2017/49]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:PHOTOVOLTAIKSTROMVORRICHTUNG UND VERKABELUNG[2017/49]
English:PHOTOVOLTAIC POWER DEVICE AND WIRING[2017/49]
French:DISPOSITIF ET CÂBLAGE D'ALIMENTATION PHOTOVOLTAÏQUE[2017/49]
Examination procedure17.05.2017Date on which the examining division has become responsible
06.06.2018Amendment by applicant (claims and/or description)
06.06.2018Examination requested  [2018/29]
17.07.2018Communication of intention to grant the patent
21.11.2018Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
04.12.2018Despatch of a communication from the examining division (Time limit: M06)
13.06.2019Reply to a communication from the examining division
12.07.2019Communication of intention to grant the patent
21.11.2019Fee for grant paid
21.11.2019Fee for publishing/printing paid
21.11.2019Receipt of the translation of the claim(s)
Divisional application(s)EP19217486.0  / EP3687019
Opposition(s)02.10.2020No opposition filed within time limit [2020/50]
Fees paidRenewal fee
15.05.2019Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU17.05.2017
AL01.01.2020
AT01.01.2020
CY01.01.2020
CZ01.01.2020
DK01.01.2020
EE01.01.2020
ES01.01.2020
FI01.01.2020
HR01.01.2020
IT01.01.2020
LT01.01.2020
LV01.01.2020
MC01.01.2020
MK01.01.2020
MT01.01.2020
PL01.01.2020
RO01.01.2020
RS01.01.2020
SE01.01.2020
SI01.01.2020
SK01.01.2020
SM01.01.2020
TR01.01.2020
BG01.04.2020
NO01.04.2020
GR02.04.2020
IS01.05.2020
IE17.05.2020
LU17.05.2020
PT27.05.2020
BE31.05.2020
CH31.05.2020
LI31.05.2020
[2022/31]
Former [2022/30]HU17.05.2017
AL01.01.2020
AT01.01.2020
CY01.01.2020
CZ01.01.2020
DK01.01.2020
EE01.01.2020
ES01.01.2020
FI01.01.2020
HR01.01.2020
IT01.01.2020
LT01.01.2020
LV01.01.2020
MC01.01.2020
MT01.01.2020
PL01.01.2020
RO01.01.2020
RS01.01.2020
SE01.01.2020
SI01.01.2020
SK01.01.2020
SM01.01.2020
TR01.01.2020
BG01.04.2020
NO01.04.2020
GR02.04.2020
IS01.05.2020
IE17.05.2020
LU17.05.2020
PT27.05.2020
BE31.05.2020
CH31.05.2020
LI31.05.2020
Former [2022/27]HU17.05.2017
AT01.01.2020
CY01.01.2020
CZ01.01.2020
DK01.01.2020
EE01.01.2020
ES01.01.2020
FI01.01.2020
HR01.01.2020
IT01.01.2020
LT01.01.2020
LV01.01.2020
MC01.01.2020
MT01.01.2020
PL01.01.2020
RO01.01.2020
RS01.01.2020
SE01.01.2020
SI01.01.2020
SK01.01.2020
SM01.01.2020
TR01.01.2020
BG01.04.2020
NO01.04.2020
GR02.04.2020
IS01.05.2020
IE17.05.2020
LU17.05.2020
PT27.05.2020
BE31.05.2020
CH31.05.2020
LI31.05.2020
Former [2021/24]AT01.01.2020
CZ01.01.2020
DK01.01.2020
EE01.01.2020
ES01.01.2020
FI01.01.2020
HR01.01.2020
IT01.01.2020
LT01.01.2020
LV01.01.2020
MC01.01.2020
PL01.01.2020
RO01.01.2020
RS01.01.2020
SE01.01.2020
SI01.01.2020
SK01.01.2020
SM01.01.2020
BG01.04.2020
NO01.04.2020
GR02.04.2020
IS01.05.2020
IE17.05.2020
LU17.05.2020
PT27.05.2020
BE31.05.2020
CH31.05.2020
LI31.05.2020
Former [2021/20]AT01.01.2020
CZ01.01.2020
DK01.01.2020
EE01.01.2020
ES01.01.2020
FI01.01.2020
HR01.01.2020
IT01.01.2020
LT01.01.2020
LV01.01.2020
MC01.01.2020
PL01.01.2020
RO01.01.2020
RS01.01.2020
SE01.01.2020
SI01.01.2020
SK01.01.2020
SM01.01.2020
BG01.04.2020
NO01.04.2020
GR02.04.2020
IS01.05.2020
IE17.05.2020
LU17.05.2020
PT27.05.2020
CH31.05.2020
LI31.05.2020
Former [2021/15]AT01.01.2020
CZ01.01.2020
DK01.01.2020
EE01.01.2020
ES01.01.2020
FI01.01.2020
HR01.01.2020
IT01.01.2020
LT01.01.2020
LV01.01.2020
MC01.01.2020
PL01.01.2020
RO01.01.2020
RS01.01.2020
SE01.01.2020
SI01.01.2020
SK01.01.2020
SM01.01.2020
BG01.04.2020
NO01.04.2020
GR02.04.2020
IS01.05.2020
LU17.05.2020
PT27.05.2020
CH31.05.2020
LI31.05.2020
Former [2021/10]AT01.01.2020
CZ01.01.2020
DK01.01.2020
EE01.01.2020
ES01.01.2020
FI01.01.2020
HR01.01.2020
IT01.01.2020
LT01.01.2020
LV01.01.2020
MC01.01.2020
PL01.01.2020
RO01.01.2020
RS01.01.2020
SE01.01.2020
SI01.01.2020
SK01.01.2020
SM01.01.2020
BG01.04.2020
NO01.04.2020
GR02.04.2020
IS01.05.2020
PT27.05.2020
CH31.05.2020
LI31.05.2020
Former [2021/08]CZ01.01.2020
DK01.01.2020
EE01.01.2020
ES01.01.2020
FI01.01.2020
HR01.01.2020
LT01.01.2020
LV01.01.2020
RO01.01.2020
RS01.01.2020
SE01.01.2020
SK01.01.2020
SM01.01.2020
BG01.04.2020
NO01.04.2020
GR02.04.2020
IS01.05.2020
PT27.05.2020
CH31.05.2020
LI31.05.2020
Former [2020/50]CZ01.01.2020
DK01.01.2020
EE01.01.2020
ES01.01.2020
FI01.01.2020
HR01.01.2020
LT01.01.2020
LV01.01.2020
RO01.01.2020
RS01.01.2020
SE01.01.2020
SK01.01.2020
SM01.01.2020
BG01.04.2020
NO01.04.2020
GR02.04.2020
IS01.05.2020
PT27.05.2020
Former [2020/49]CZ01.01.2020
DK01.01.2020
ES01.01.2020
FI01.01.2020
HR01.01.2020
LT01.01.2020
LV01.01.2020
RO01.01.2020
RS01.01.2020
SE01.01.2020
SK01.01.2020
SM01.01.2020
BG01.04.2020
NO01.04.2020
GR02.04.2020
IS01.05.2020
PT27.05.2020
Former [2020/48]CZ01.01.2020
DK01.01.2020
ES01.01.2020
FI01.01.2020
HR01.01.2020
LT01.01.2020
LV01.01.2020
RO01.01.2020
RS01.01.2020
SE01.01.2020
SM01.01.2020
BG01.04.2020
NO01.04.2020
GR02.04.2020
IS01.05.2020
PT27.05.2020
Former [2020/47]CZ01.01.2020
DK01.01.2020
ES01.01.2020
FI01.01.2020
HR01.01.2020
LT01.01.2020
LV01.01.2020
RS01.01.2020
SE01.01.2020
BG01.04.2020
NO01.04.2020
GR02.04.2020
IS01.05.2020
PT27.05.2020
Former [2020/40]CZ01.01.2020
FI01.01.2020
HR01.01.2020
LT01.01.2020
LV01.01.2020
RS01.01.2020
SE01.01.2020
BG01.04.2020
NO01.04.2020
GR02.04.2020
IS01.05.2020
PT27.05.2020
Former [2020/39]CZ01.01.2020
FI01.01.2020
HR01.01.2020
LT01.01.2020
LV01.01.2020
RS01.01.2020
SE01.01.2020
BG01.04.2020
NO01.04.2020
GR02.04.2020
PT27.05.2020
Former [2020/38]CZ01.01.2020
FI01.01.2020
HR01.01.2020
LT01.01.2020
LV01.01.2020
RS01.01.2020
SE01.01.2020
NO01.04.2020
GR02.04.2020
PT27.05.2020
Former [2020/37]CZ01.01.2020
FI01.01.2020
HR01.01.2020
LT01.01.2020
LV01.01.2020
RS01.01.2020
SE01.01.2020
NO01.04.2020
PT27.05.2020
Former [2020/36]CZ01.01.2020
FI01.01.2020
LT01.01.2020
RS01.01.2020
NO01.04.2020
PT27.05.2020
Former [2020/35]CZ01.01.2020
FI01.01.2020
LT01.01.2020
NO01.04.2020
Documents cited:Search[A]DE4032569  (FLACHGLAS SOLARTECHNIK GMBH [DE]) [A] 1-15 * column 1, line 60 - column 2, line 55 ** column 3, line 6 - line 34 *;
 [A]US2005172995  (ROHRIG RUDIGER [DE], et al) [A] 1-15 * paragraph [0009] - paragraph [0017]; figure 6 * * paragraph [0074] - paragraph [0078]; figure 8 *;
 [A]CN203367304U  (NANJING JINENGYI NEW ENERGY TECHNOLOGY CO LTD) [A] 1-15 * paragraph [0023] - paragraph [0026]; figure 2 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.