EP3246779 - SYSTEMS AND METHODS FOR PRIORITIZING AND MONITORING DEVICE STATUS IN A CONDITION MONITORING SOFTWARE APPLICATION [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 26.01.2024 Database last updated on 03.06.2024 | |
Former | The patent has been granted Status updated on 17.02.2023 | ||
Former | Grant of patent is intended Status updated on 10.11.2022 | ||
Former | Examination is in progress Status updated on 13.09.2019 | ||
Former | Request for examination was made Status updated on 25.05.2018 | ||
Former | The application has been published Status updated on 20.10.2017 | Most recent event Tooltip | 24.05.2024 | Lapse of the patent in a contracting state New state(s): IT | published on 26.06.2024 [2024/26] | Applicant(s) | For all designated states General Electric Company 1 River Road Schenectady, NY 12345 / US | [2023/12] |
Former [2017/47] | For all designated states General Electric Company 1 River Road Schenectady, NY 12345 / US | Inventor(s) | 01 /
ABOUMRAD, Nicholas Ryan 1631 Bently Parkway South Minden, NV 89423 / US | 02 /
ROALDSON, Ryan Gregory 1631 Bently Parkway South Minden, NV 89423 / US | 03 /
TAPPAN, Jacqueline Marie 1631 Bently Parkway South Minden, NV 89423 / US | [2017/47] | Representative(s) | Novagraaf Group Chemin de l'Echo 3 1213 Onex / Geneva / CH | [2023/12] |
Former [2017/47] | Lee, Brenda GE International Inc. Global Patent Operation - Europe The Ark 201 Talgarth Road Hammersmith London W6 8BJ / GB | Application number, filing date | 17171505.5 | 17.05.2017 | [2017/47] | Priority number, date | US201662337739P | 17.05.2016 Original published format: US 201662337739 P | US201615377747 | 13.12.2016 Original published format: US201615377747 | [2017/47] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3246779 | Date: | 22.11.2017 | Language: | EN | [2017/47] | Type: | B1 Patent specification | No.: | EP3246779 | Date: | 22.03.2023 | Language: | EN | [2023/12] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 20.09.2017 | Classification | IPC: | G05B23/02 | [2017/47] | CPC: |
G05B23/0272 (EP,US);
G06F3/0482 (US);
G08B21/18 (US);
G05B2219/23178 (EP,US);
G06T11/206 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/26] |
Former [2017/47] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | SYSTEME UND VERFAHREN ZUR PRIORISIERUNG UND ÜBERWACHUNG DES VORRICHTUNGSSTATUS IN EINER ZUSTANDSÜBERWACHUNGSSOFTWAREANWENDUNG | [2017/47] | English: | SYSTEMS AND METHODS FOR PRIORITIZING AND MONITORING DEVICE STATUS IN A CONDITION MONITORING SOFTWARE APPLICATION | [2017/47] | French: | SYSTÈMES ET PROCÉDÉS DE HIÉRARCHISATION ET DE SURVEILLANCE DE L'ÉTAT D'UN DISPOSITIF DANS UNE APPLICATION LOGICIELLE DE SURVEILLANCE D'ÉTAT | [2017/47] | Examination procedure | 17.05.2017 | Date on which the examining division has become responsible | 18.05.2018 | Amendment by applicant (claims and/or description) | 22.05.2018 | Examination requested [2018/26] | 17.09.2019 | Despatch of a communication from the examining division (Time limit: M06) | 12.03.2020 | Reply to a communication from the examining division | 14.09.2020 | Despatch of a communication from the examining division (Time limit: M06) | 17.03.2021 | Reply to a communication from the examining division | 20.10.2022 | Cancellation of oral proceeding that was planned for 26.10.2022 | 20.10.2022 | Despatch of a communication from the examining division (Time limit: M01) | 21.10.2022 | Reply to a communication from the examining division | 26.10.2022 | Date of oral proceedings (cancelled) | 11.11.2022 | Communication of intention to grant the patent | 07.02.2023 | Fee for grant paid | 07.02.2023 | Fee for publishing/printing paid | 07.02.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 02.01.2024 | No opposition filed within time limit [2024/09] | Fees paid | Renewal fee | 29.05.2019 | Renewal fee patent year 03 | 20.05.2020 | Renewal fee patent year 04 | 19.05.2021 | Renewal fee patent year 05 | 18.05.2022 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 22.03.2023 | CZ | 22.03.2023 | EE | 22.03.2023 | ES | 22.03.2023 | FI | 22.03.2023 | HR | 22.03.2023 | IT | 22.03.2023 | LT | 22.03.2023 | LV | 22.03.2023 | MC | 22.03.2023 | NL | 22.03.2023 | PL | 22.03.2023 | RO | 22.03.2023 | RS | 22.03.2023 | SI | 22.03.2023 | SK | 22.03.2023 | SM | 22.03.2023 | IE | 17.05.2023 | LU | 17.05.2023 | FR | 22.05.2023 | BE | 31.05.2023 | NO | 22.06.2023 | GR | 23.06.2023 | IS | 22.07.2023 | PT | 24.07.2023 | [2024/26] |
Former [2024/24] | AT | 22.03.2023 | |
CZ | 22.03.2023 | ||
EE | 22.03.2023 | ||
ES | 22.03.2023 | ||
FI | 22.03.2023 | ||
HR | 22.03.2023 | ||
LT | 22.03.2023 | ||
LV | 22.03.2023 | ||
MC | 22.03.2023 | ||
NL | 22.03.2023 | ||
PL | 22.03.2023 | ||
RO | 22.03.2023 | ||
RS | 22.03.2023 | ||
SI | 22.03.2023 | ||
SK | 22.03.2023 | ||
SM | 22.03.2023 | ||
IE | 17.05.2023 | ||
LU | 17.05.2023 | ||
FR | 22.05.2023 | ||
BE | 31.05.2023 | ||
NO | 22.06.2023 | ||
GR | 23.06.2023 | ||
IS | 22.07.2023 | ||
PT | 24.07.2023 | ||
Former [2024/21] | AT | 22.03.2023 | |
CZ | 22.03.2023 | ||
EE | 22.03.2023 | ||
ES | 22.03.2023 | ||
FI | 22.03.2023 | ||
HR | 22.03.2023 | ||
LT | 22.03.2023 | ||
LV | 22.03.2023 | ||
MC | 22.03.2023 | ||
NL | 22.03.2023 | ||
PL | 22.03.2023 | ||
RO | 22.03.2023 | ||
RS | 22.03.2023 | ||
SI | 22.03.2023 | ||
SK | 22.03.2023 | ||
SM | 22.03.2023 | ||
IE | 17.05.2023 | ||
LU | 17.05.2023 | ||
NO | 22.06.2023 | ||
GR | 23.06.2023 | ||
IS | 22.07.2023 | ||
PT | 24.07.2023 | ||
Former [2024/10] | AT | 22.03.2023 | |
CZ | 22.03.2023 | ||
EE | 22.03.2023 | ||
ES | 22.03.2023 | ||
FI | 22.03.2023 | ||
HR | 22.03.2023 | ||
LT | 22.03.2023 | ||
LV | 22.03.2023 | ||
MC | 22.03.2023 | ||
NL | 22.03.2023 | ||
PL | 22.03.2023 | ||
RO | 22.03.2023 | ||
RS | 22.03.2023 | ||
SI | 22.03.2023 | ||
SK | 22.03.2023 | ||
SM | 22.03.2023 | ||
LU | 17.05.2023 | ||
NO | 22.06.2023 | ||
GR | 23.06.2023 | ||
IS | 22.07.2023 | ||
PT | 24.07.2023 | ||
Former [2024/08] | AT | 22.03.2023 | |
EE | 22.03.2023 | ||
ES | 22.03.2023 | ||
FI | 22.03.2023 | ||
HR | 22.03.2023 | ||
LT | 22.03.2023 | ||
LV | 22.03.2023 | ||
MC | 22.03.2023 | ||
NL | 22.03.2023 | ||
PL | 22.03.2023 | ||
RO | 22.03.2023 | ||
RS | 22.03.2023 | ||
SK | 22.03.2023 | ||
SM | 22.03.2023 | ||
LU | 17.05.2023 | ||
NO | 22.06.2023 | ||
GR | 23.06.2023 | ||
IS | 22.07.2023 | ||
PT | 24.07.2023 | ||
Former [2023/50] | AT | 22.03.2023 | |
EE | 22.03.2023 | ||
ES | 22.03.2023 | ||
FI | 22.03.2023 | ||
HR | 22.03.2023 | ||
LT | 22.03.2023 | ||
LV | 22.03.2023 | ||
NL | 22.03.2023 | ||
PL | 22.03.2023 | ||
RO | 22.03.2023 | ||
RS | 22.03.2023 | ||
SK | 22.03.2023 | ||
SM | 22.03.2023 | ||
NO | 22.06.2023 | ||
GR | 23.06.2023 | ||
IS | 22.07.2023 | ||
PT | 24.07.2023 | ||
Former [2023/49] | AT | 22.03.2023 | |
EE | 22.03.2023 | ||
ES | 22.03.2023 | ||
FI | 22.03.2023 | ||
HR | 22.03.2023 | ||
LT | 22.03.2023 | ||
LV | 22.03.2023 | ||
NL | 22.03.2023 | ||
RO | 22.03.2023 | ||
RS | 22.03.2023 | ||
SM | 22.03.2023 | ||
NO | 22.06.2023 | ||
GR | 23.06.2023 | ||
PT | 24.07.2023 | ||
Former [2023/48] | AT | 22.03.2023 | |
EE | 22.03.2023 | ||
ES | 22.03.2023 | ||
FI | 22.03.2023 | ||
HR | 22.03.2023 | ||
LT | 22.03.2023 | ||
LV | 22.03.2023 | ||
NL | 22.03.2023 | ||
RS | 22.03.2023 | ||
SM | 22.03.2023 | ||
NO | 22.06.2023 | ||
GR | 23.06.2023 | ||
PT | 24.07.2023 | ||
Former [2023/46] | ES | 22.03.2023 | |
FI | 22.03.2023 | ||
HR | 22.03.2023 | ||
LT | 22.03.2023 | ||
LV | 22.03.2023 | ||
NL | 22.03.2023 | ||
RS | 22.03.2023 | ||
SM | 22.03.2023 | ||
NO | 22.06.2023 | ||
GR | 23.06.2023 | ||
PT | 24.07.2023 | ||
Former [2023/38] | FI | 22.03.2023 | |
HR | 22.03.2023 | ||
LT | 22.03.2023 | ||
LV | 22.03.2023 | ||
NL | 22.03.2023 | ||
RS | 22.03.2023 | ||
NO | 22.06.2023 | ||
GR | 23.06.2023 | ||
Former [2023/37] | FI | 22.03.2023 | |
HR | 22.03.2023 | ||
LT | 22.03.2023 | ||
LV | 22.03.2023 | ||
RS | 22.03.2023 | ||
NO | 22.06.2023 | ||
GR | 23.06.2023 | ||
Former [2023/36] | FI | 22.03.2023 | |
HR | 22.03.2023 | ||
LT | 22.03.2023 | ||
LV | 22.03.2023 | ||
RS | 22.03.2023 | ||
NO | 22.06.2023 | ||
Former [2023/35] | HR | 22.03.2023 | |
LT | 22.03.2023 | ||
RS | 22.03.2023 | ||
NO | 22.06.2023 | ||
Former [2023/34] | LT | 22.03.2023 | |
RS | 22.03.2023 | ||
Former [2023/33] | LT | 22.03.2023 | Documents cited: | Search | [Y]US2004186927 (ERYUREK EVREN [US], et al) [Y] 12,14 * paragraph [0067] - paragraph [0068]; figure 9 *; | [T]US2011264424 (MIWA TOSHIHARU [JP], et al) [T] 1-15 * paragraph [0073]; figure 2 ** paragraph [0076]; figure 3 *; | [IY]WO2015099895 (GEN ELECTRIC [US]) [I] 1-11,13,15 * paragraph [0005] * * paragraph [0023] - paragraph [0024]; figure 1 * * paragraph [0029]; figure 2 * * paragraph [0032] - paragraph [0036]; figures 3, 4A-D * [Y] 12,14 | Examination | US2004139085 | EP2833229 | - Microsys ET AL, "Alarm and Event system", https://www.promotic.eu/en/firm/microsys.htm, (20160325), URL: https://web.archive.org/web/20160325200737/https://www.promotic.eu/en/pmdoc/Subsystems/AlEv/AlarmEvent.htm, (20190911), XP055621249 |