EP3392669 - METHOD AND APPARATUS FOR RADAR ACCURACY MEASUREMENTS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 10.02.2023 Database last updated on 12.07.2024 | |
Former | The patent has been granted Status updated on 04.03.2022 | ||
Former | Grant of patent is intended Status updated on 27.01.2022 | ||
Former | Examination is in progress Status updated on 02.03.2020 | ||
Former | Request for examination was made Status updated on 21.09.2018 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Rohde & Schwarz GmbH & Co. KG Mühldorfstrasse 15 81671 München / DE | [2018/43] | Inventor(s) | 01 /
Schiessl, Andreas Grafinger Str. 113 81671 Munich / DE | 02 /
Ahmed, Sherif Weilheimerstr. 7 82319 Starnberg / DE | 03 /
Heuel, Steffen Lerchenauer Str. 181 80935 Munich / DE | [2018/43] | Representative(s) | Rupp, Christian, et al Mitscherlich PartmbB Patent- und Rechtsanwälte Karlstraße 7 80333 München / DE | [N/P] |
Former [2022/14] | Rupp, Christian, et al Mitscherlich PartmbB Patent- und Rechtsanwälte Sonnenstraße 33 80331 München / DE | ||
Former [2018/43] | Körfer, Thomas Mitscherlich PartmbB Patent- und Rechtsanwälte Sonnenstrasse 33 80331 München / DE | Application number, filing date | 17172341.4 | 23.05.2017 | [2018/43] | Priority number, date | US201715494092 | 21.04.2017 Original published format: US201715494092 | [2018/43] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3392669 | Date: | 24.10.2018 | Language: | EN | [2018/43] | Type: | B1 Patent specification | No.: | EP3392669 | Date: | 06.04.2022 | Language: | EN | [2022/14] | Type: | B8 Corrected title page of specification | No.: | EP3392669 | Date: | 25.05.2022 | [2022/21] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 22.12.2017 | Classification | IPC: | G01S7/40, H01Q1/42, G01S13/00, G01R29/08, G01S13/87 | [2022/03] | CPC: |
H01Q1/42 (EP,US);
G01R29/0835 (EP,US);
G01S13/87 (EP);
G01S7/40 (EP,US);
H01Q1/421 (EP,US);
G01S13/003 (EP);
G01S7/4086 (EP,US)
(-)
|
Former IPC [2018/43] | G01S7/40, H01Q1/42 | Designated contracting states | AL, AT, BE, BG, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IS, IT, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2022/16] |
Former [2018/43] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VERFAHREN UND VORRICHTUNG FÜR RADARGENAUIGKEITSMESSUNGEN | [2018/43] | English: | METHOD AND APPARATUS FOR RADAR ACCURACY MEASUREMENTS | [2018/43] | French: | PROCÉDÉ ET APPAREIL POUR DES MESURES DE PRÉCISION DE RADAR | [2018/43] | Examination procedure | 23.05.2017 | Date on which the examining division has become responsible | 15.01.2018 | Examination requested [2018/43] | 13.07.2018 | Amendment by applicant (claims and/or description) | 05.03.2020 | Despatch of a communication from the examining division (Time limit: M04) | 03.07.2020 | Reply to a communication from the examining division | 13.12.2021 | Cancellation of oral proceeding that was planned for 14.12.2021 | 14.12.2021 | Date of oral proceedings (cancelled) | 28.01.2022 | Communication of intention to grant the patent | 11.02.2022 | Fee for grant paid | 11.02.2022 | Fee for publishing/printing paid | 01.03.2022 | Receipt of the translation of the claim(s) | Divisional application(s) | EP22151904.4 / EP4009071 | Opposition(s) | 10.01.2023 | No opposition filed within time limit [2023/11] | Fees paid | Renewal fee | 29.05.2019 | Renewal fee patent year 03 | 28.05.2020 | Renewal fee patent year 04 | 21.05.2021 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 23.05.2017 | AL | 06.04.2022 | AT | 06.04.2022 | CY | 06.04.2022 | CZ | 06.04.2022 | DK | 06.04.2022 | EE | 06.04.2022 | ES | 06.04.2022 | FI | 06.04.2022 | HR | 06.04.2022 | IT | 06.04.2022 | LT | 06.04.2022 | LV | 06.04.2022 | MC | 06.04.2022 | MK | 06.04.2022 | NL | 06.04.2022 | PL | 06.04.2022 | RO | 06.04.2022 | RS | 06.04.2022 | SE | 06.04.2022 | SI | 06.04.2022 | SK | 06.04.2022 | SM | 06.04.2022 | TR | 06.04.2022 | LU | 23.05.2022 | BE | 31.05.2022 | BG | 06.07.2022 | NO | 06.07.2022 | GR | 07.07.2022 | IS | 06.08.2022 | PT | 08.08.2022 | [2024/29] |
Former [2024/22] | HU | 23.05.2017 | |
AL | 06.04.2022 | ||
AT | 06.04.2022 | ||
CY | 06.04.2022 | ||
CZ | 06.04.2022 | ||
DK | 06.04.2022 | ||
EE | 06.04.2022 | ||
ES | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
IT | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
MC | 06.04.2022 | ||
MK | 06.04.2022 | ||
NL | 06.04.2022 | ||
PL | 06.04.2022 | ||
RO | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
SI | 06.04.2022 | ||
SK | 06.04.2022 | ||
SM | 06.04.2022 | ||
LU | 23.05.2022 | ||
BE | 31.05.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
IS | 06.08.2022 | ||
PT | 08.08.2022 | ||
Former [2024/20] | HU | 23.05.2017 | |
AL | 06.04.2022 | ||
AT | 06.04.2022 | ||
CY | 06.04.2022 | ||
CZ | 06.04.2022 | ||
DK | 06.04.2022 | ||
EE | 06.04.2022 | ||
ES | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
IT | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
MC | 06.04.2022 | ||
NL | 06.04.2022 | ||
PL | 06.04.2022 | ||
RO | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
SI | 06.04.2022 | ||
SK | 06.04.2022 | ||
SM | 06.04.2022 | ||
LU | 23.05.2022 | ||
BE | 31.05.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
IS | 06.08.2022 | ||
PT | 08.08.2022 | ||
Former [2024/18] | HU | 23.05.2017 | |
AL | 06.04.2022 | ||
AT | 06.04.2022 | ||
CZ | 06.04.2022 | ||
DK | 06.04.2022 | ||
EE | 06.04.2022 | ||
ES | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
IT | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
MC | 06.04.2022 | ||
NL | 06.04.2022 | ||
PL | 06.04.2022 | ||
RO | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
SI | 06.04.2022 | ||
SK | 06.04.2022 | ||
SM | 06.04.2022 | ||
LU | 23.05.2022 | ||
BE | 31.05.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
IS | 06.08.2022 | ||
PT | 08.08.2022 | ||
Former [2024/11] | AL | 06.04.2022 | |
AT | 06.04.2022 | ||
CZ | 06.04.2022 | ||
DK | 06.04.2022 | ||
EE | 06.04.2022 | ||
ES | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
IT | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
MC | 06.04.2022 | ||
NL | 06.04.2022 | ||
PL | 06.04.2022 | ||
RO | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
SI | 06.04.2022 | ||
SK | 06.04.2022 | ||
SM | 06.04.2022 | ||
LU | 23.05.2022 | ||
BE | 31.05.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
IS | 06.08.2022 | ||
PT | 08.08.2022 | ||
Former [2023/25] | AL | 06.04.2022 | |
AT | 06.04.2022 | ||
CZ | 06.04.2022 | ||
DK | 06.04.2022 | ||
EE | 06.04.2022 | ||
ES | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
MC | 06.04.2022 | ||
NL | 06.04.2022 | ||
PL | 06.04.2022 | ||
RO | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
SI | 06.04.2022 | ||
SK | 06.04.2022 | ||
SM | 06.04.2022 | ||
LU | 23.05.2022 | ||
BE | 31.05.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
IS | 06.08.2022 | ||
PT | 08.08.2022 | ||
Former [2023/17] | AL | 06.04.2022 | |
AT | 06.04.2022 | ||
CZ | 06.04.2022 | ||
DK | 06.04.2022 | ||
EE | 06.04.2022 | ||
ES | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
MC | 06.04.2022 | ||
NL | 06.04.2022 | ||
PL | 06.04.2022 | ||
RO | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
SK | 06.04.2022 | ||
SM | 06.04.2022 | ||
LU | 23.05.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
IS | 06.08.2022 | ||
PT | 08.08.2022 | ||
Former [2023/09] | AT | 06.04.2022 | |
CZ | 06.04.2022 | ||
DK | 06.04.2022 | ||
EE | 06.04.2022 | ||
ES | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
MC | 06.04.2022 | ||
NL | 06.04.2022 | ||
PL | 06.04.2022 | ||
RO | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
SK | 06.04.2022 | ||
SM | 06.04.2022 | ||
LU | 23.05.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
IS | 06.08.2022 | ||
PT | 08.08.2022 | ||
Former [2023/08] | AT | 06.04.2022 | |
DK | 06.04.2022 | ||
ES | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
MC | 06.04.2022 | ||
NL | 06.04.2022 | ||
PL | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
LU | 23.05.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
IS | 06.08.2022 | ||
PT | 08.08.2022 | ||
Former [2023/07] | AT | 06.04.2022 | |
DK | 06.04.2022 | ||
ES | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
NL | 06.04.2022 | ||
PL | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
IS | 06.08.2022 | ||
PT | 08.08.2022 | ||
Former [2022/51] | AT | 06.04.2022 | |
ES | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
NL | 06.04.2022 | ||
PL | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
IS | 06.08.2022 | ||
PT | 08.08.2022 | ||
Former [2022/50] | AT | 06.04.2022 | |
ES | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
NL | 06.04.2022 | ||
PL | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
PT | 08.08.2022 | ||
Former [2022/49] | AT | 06.04.2022 | |
ES | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
NL | 06.04.2022 | ||
SE | 06.04.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
PT | 08.08.2022 | ||
Former [2022/47] | AT | 06.04.2022 | |
ES | 06.04.2022 | ||
FI | 06.04.2022 | ||
LT | 06.04.2022 | ||
NL | 06.04.2022 | ||
SE | 06.04.2022 | ||
NO | 06.07.2022 | ||
PT | 08.08.2022 | ||
Former [2022/44] | NL | 06.04.2022 | Documents cited: | Search | [X]US5066921 (ROPE EUGENE L [US], et al) [X] 11,13-18 * column 3, line 8 - line 13; figures 1,2 *; | [X]JP2011122892 (YOKOHAMA RUBBER CO LTD) [X] 11,13-18 * abstract * * paragraph [0018]; claims 3,10 *; | [XY]CN103412227B (CHINA SHIP DEV & DESIGN CT) [X] 11,13-18 * paragraph [0030] - paragraph [0043]; figures 1,2 * [Y] 1-18; | [A]CN204925281U (KUANG CHI INNOVATIVE TECH CO) [A] 12 * abstract * * paragraph [0029] *; | [Y]EP3115804 (DSPACE GMBH [DE]) [Y] 1-18 * paragraph [0011] - paragraph [0029]; figures 1-6 *; | [A] - HARTER MARLENE ET AL, "Self-Calibration of a 3-D-Digital Beamforming Radar System for Automotive Applications With Installation Behind Automotive Covers", IEEE TRANSACTIONS ON MICROWAVE THEORY AND TECHNIQUES, PLENUM, USA, vol. 64, no. 9, doi:10.1109/TMTT.2016.2593731, ISSN 0018-9480, (20160901), pages 2994 - 3000, (20160901), XP011621523 [A] 1-18 * page 2998, column r, paragraph 3 * DOI: http://dx.doi.org/10.1109/TMTT.2016.2593731 | Examination | EP3258288 | by applicant | WO2015043935 |