blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3406440

EP3406440 - MULTILAYER TUBE FOR GUIDING FUEL FLUID AND METHOD OF MANUFACTURING SAME [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  08.09.2023
Database last updated on 08.06.2024
FormerThe patent has been granted
Status updated on  30.09.2022
FormerGrant of patent is intended
Status updated on  10.01.2022
FormerExamination is in progress
Status updated on  09.06.2020
FormerRequest for examination was made
Status updated on  07.06.2019
FormerThe application has been published
Status updated on  26.10.2018
Most recent event   Tooltip24.05.2024Lapse of the patent in a contracting state
New state(s): IT
published on 26.06.2024 [2024/26]
Applicant(s)For all designated states
Cooper-Standard Automotive (Deutschland) GmbH
Ehinger Strasse 28
89601 Schelklingen / DE
[2018/48]
Inventor(s)01 / PETERS, Michael
Justusstraße 11
35447 Reiskirchen-Saasen / DE
02 / ROLOFF, Dietmar
Auf dem langen Land 30
33739 Bielefeld / DE
 [2018/48]
Representative(s)Witte, Weller & Partner Patentanwälte mbB
Postfach 10 54 62
70047 Stuttgart / DE
[2018/48]
Application number, filing date17172476.823.05.2017
[2018/48]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3406440
Date:28.11.2018
Language:EN
[2018/48]
Type: B1 Patent specification 
No.:EP3406440
Date:02.11.2022
Language:EN
[2022/44]
Search report(s)(Supplementary) European search report - dispatched on:EP15.11.2017
ClassificationIPC:B32B27/08, B32B27/34, B32B1/08
[2018/48]
CPC:
B32B27/08 (EP,CN,US); B32B1/08 (EP,CN,US); F16L11/04 (US);
B32B27/34 (EP,CN,US); B29C48/09 (EP,US); B29C48/21 (EP,US);
B29K2077/00 (US); B29K2995/0067 (US); B29K2995/0077 (US);
B29K2995/0082 (US); B29K2995/0089 (US); B32B2250/24 (EP,US);
B32B2274/00 (EP,US); B32B2307/202 (EP,CN,US); B32B2307/54 (US);
B32B2307/546 (US); B32B2307/558 (US); B32B2307/714 (EP,US);
B32B2307/7242 (US); B32B2307/726 (CN); B32B2307/7265 (EP,US);
B32B2307/732 (EP,US); B32B2597/00 (EP,US); B32B2605/00 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/28]
Former [2018/48]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:MEHRSCHICHTIGES ROHR ZUR FÜHRUNG VON BRENNSTOFFFLUID UND VERFAHREN ZUR HERSTELLUNG DAVON[2018/48]
English:MULTILAYER TUBE FOR GUIDING FUEL FLUID AND METHOD OF MANUFACTURING SAME[2018/48]
French:TUBE MULTICOUCHE POUR GUIDER UN FLUIDE COMBUSTIBLE ET SON PROCÉDÉ DE FABRICATION[2018/48]
Examination procedure28.05.2019Amendment by applicant (claims and/or description)
28.05.2019Examination requested  [2019/28]
28.05.2019Date on which the examining division has become responsible
15.06.2020Despatch of a communication from the examining division (Time limit: M06)
24.11.2020Reply to a communication from the examining division
11.01.2022Communication of intention to grant the patent
18.05.2022Fee for grant paid
18.05.2022Fee for publishing/printing paid
18.05.2022Receipt of the translation of the claim(s)
Opposition(s)03.08.2023No opposition filed within time limit [2023/41]
Fees paidRenewal fee
22.05.2019Renewal fee patent year 03
26.03.2020Renewal fee patent year 04
27.05.2021Renewal fee patent year 05
28.09.2022Renewal fee patent year 06
Penalty fee
Additional fee for renewal fee
31.05.202206   M06   Fee paid on   28.09.2022
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAL02.11.2022
AT02.11.2022
CZ02.11.2022
DK02.11.2022
EE02.11.2022
ES02.11.2022
FI02.11.2022
HR02.11.2022
IT02.11.2022
LT02.11.2022
LV02.11.2022
MC02.11.2022
NL02.11.2022
PL02.11.2022
RO02.11.2022
RS02.11.2022
SE02.11.2022
SI02.11.2022
SK02.11.2022
SM02.11.2022
NO02.02.2023
GR03.02.2023
IS02.03.2023
PT02.03.2023
GB23.05.2023
IE23.05.2023
LU23.05.2023
BE31.05.2023
CH31.05.2023
LI31.05.2023
[2024/26]
Former [2024/24]AL02.11.2022
AT02.11.2022
CZ02.11.2022
DK02.11.2022
EE02.11.2022
ES02.11.2022
FI02.11.2022
HR02.11.2022
LT02.11.2022
LV02.11.2022
MC02.11.2022
NL02.11.2022
PL02.11.2022
RO02.11.2022
RS02.11.2022
SE02.11.2022
SI02.11.2022
SK02.11.2022
SM02.11.2022
NO02.02.2023
GR03.02.2023
IS02.03.2023
PT02.03.2023
GB23.05.2023
IE23.05.2023
LU23.05.2023
BE31.05.2023
CH31.05.2023
LI31.05.2023
Former [2024/21]AL02.11.2022
AT02.11.2022
CZ02.11.2022
DK02.11.2022
EE02.11.2022
ES02.11.2022
FI02.11.2022
HR02.11.2022
LT02.11.2022
LV02.11.2022
MC02.11.2022
NL02.11.2022
PL02.11.2022
RO02.11.2022
RS02.11.2022
SE02.11.2022
SI02.11.2022
SK02.11.2022
SM02.11.2022
NO02.02.2023
GR03.02.2023
IS02.03.2023
PT02.03.2023
IE23.05.2023
LU23.05.2023
CH31.05.2023
LI31.05.2023
Former [2024/09]AL02.11.2022
AT02.11.2022
CZ02.11.2022
DK02.11.2022
EE02.11.2022
ES02.11.2022
FI02.11.2022
HR02.11.2022
LT02.11.2022
LV02.11.2022
MC02.11.2022
NL02.11.2022
PL02.11.2022
RO02.11.2022
RS02.11.2022
SE02.11.2022
SI02.11.2022
SK02.11.2022
SM02.11.2022
NO02.02.2023
GR03.02.2023
IS02.03.2023
PT02.03.2023
LU23.05.2023
CH31.05.2023
LI31.05.2023
Former [2024/08]AL02.11.2022
AT02.11.2022
CZ02.11.2022
DK02.11.2022
EE02.11.2022
ES02.11.2022
FI02.11.2022
HR02.11.2022
LT02.11.2022
LV02.11.2022
MC02.11.2022
NL02.11.2022
PL02.11.2022
RO02.11.2022
RS02.11.2022
SE02.11.2022
SI02.11.2022
SK02.11.2022
SM02.11.2022
NO02.02.2023
GR03.02.2023
IS02.03.2023
PT02.03.2023
LU23.05.2023
Former [2023/51]AL02.11.2022
AT02.11.2022
CZ02.11.2022
DK02.11.2022
EE02.11.2022
ES02.11.2022
FI02.11.2022
HR02.11.2022
LT02.11.2022
LV02.11.2022
NL02.11.2022
PL02.11.2022
RO02.11.2022
RS02.11.2022
SE02.11.2022
SI02.11.2022
SK02.11.2022
SM02.11.2022
NO02.02.2023
GR03.02.2023
IS02.03.2023
PT02.03.2023
Former [2023/38]AL02.11.2022
AT02.11.2022
CZ02.11.2022
DK02.11.2022
EE02.11.2022
ES02.11.2022
FI02.11.2022
HR02.11.2022
LT02.11.2022
LV02.11.2022
NL02.11.2022
PL02.11.2022
RO02.11.2022
RS02.11.2022
SE02.11.2022
SK02.11.2022
SM02.11.2022
NO02.02.2023
GR03.02.2023
IS02.03.2023
PT02.03.2023
Former [2023/37]AL02.11.2022
AT02.11.2022
CZ02.11.2022
DK02.11.2022
EE02.11.2022
ES02.11.2022
FI02.11.2022
HR02.11.2022
LT02.11.2022
LV02.11.2022
NL02.11.2022
PL02.11.2022
RO02.11.2022
RS02.11.2022
SE02.11.2022
SM02.11.2022
NO02.02.2023
GR03.02.2023
IS02.03.2023
PT02.03.2023
Former [2023/35]AT02.11.2022
CZ02.11.2022
DK02.11.2022
EE02.11.2022
ES02.11.2022
FI02.11.2022
HR02.11.2022
LT02.11.2022
LV02.11.2022
NL02.11.2022
PL02.11.2022
RO02.11.2022
RS02.11.2022
SE02.11.2022
SM02.11.2022
NO02.02.2023
GR03.02.2023
IS02.03.2023
PT02.03.2023
Former [2023/34]AT02.11.2022
DK02.11.2022
EE02.11.2022
ES02.11.2022
FI02.11.2022
HR02.11.2022
LT02.11.2022
LV02.11.2022
NL02.11.2022
PL02.11.2022
RS02.11.2022
SE02.11.2022
SM02.11.2022
NO02.02.2023
GR03.02.2023
IS02.03.2023
PT02.03.2023
Former [2023/33]AT02.11.2022
DK02.11.2022
ES02.11.2022
FI02.11.2022
HR02.11.2022
LT02.11.2022
LV02.11.2022
NL02.11.2022
PL02.11.2022
RS02.11.2022
SE02.11.2022
SM02.11.2022
NO02.02.2023
GR03.02.2023
IS02.03.2023
PT02.03.2023
Former [2023/29]AT02.11.2022
ES02.11.2022
FI02.11.2022
HR02.11.2022
LT02.11.2022
LV02.11.2022
NL02.11.2022
PL02.11.2022
RS02.11.2022
SE02.11.2022
NO02.02.2023
GR03.02.2023
IS02.03.2023
PT02.03.2023
Former [2023/26]AT02.11.2022
ES02.11.2022
FI02.11.2022
HR02.11.2022
LT02.11.2022
LV02.11.2022
PL02.11.2022
RS02.11.2022
SE02.11.2022
NO02.02.2023
GR03.02.2023
IS02.03.2023
PT02.03.2023
Former [2023/24]AT02.11.2022
ES02.11.2022
FI02.11.2022
HR02.11.2022
LT02.11.2022
LV02.11.2022
SE02.11.2022
NO02.02.2023
GR03.02.2023
PT02.03.2023
Former [2023/23]AT02.11.2022
ES02.11.2022
FI02.11.2022
LT02.11.2022
LV02.11.2022
SE02.11.2022
NO02.02.2023
GR03.02.2023
PT02.03.2023
Former [2023/22]AT02.11.2022
ES02.11.2022
FI02.11.2022
LT02.11.2022
SE02.11.2022
NO02.02.2023
PT02.03.2023
Former [2023/20]LT02.11.2022
NO02.02.2023
Documents cited:Search[A]US2008057246  (SCHWITTER PAUL [CH], et al) [A] 1-10 * paragraphs [0019] , [0027] , [0044] *;
 [XI]US2009017247  (BELLET GAELLE [FR], et al) [X] 1,3,7,10 * paragraphs [0002] , [0008] - [0047] - [0056] , [0065] , [0083]; claims 1,4,5,7 * [I] 2,4-6,8,9;
 [A]US9200731  (DOSHI SHAILESH RATILAL [CA], et al) [A] 1-10 * column 1, line 10 - line 22 * * column 2, line 6 - line 57 * * column 7, line 63 - column 8, line 66 ** column 11, line 46 - line 52 *
ExaminationWO2016039445
 EP3192650
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.