blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3251934

EP3251934 - ACTUATION DEVICE OF THE CONTROL CABLE OF A BICYCLE GEARSHIFT [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  21.05.2021
Database last updated on 14.09.2024
FormerThe patent has been granted
Status updated on  12.06.2020
FormerGrant of patent is intended
Status updated on  05.03.2020
FormerRequest for examination was made
Status updated on  08.06.2018
FormerThe application has been published
Status updated on  03.11.2017
Most recent event   Tooltip06.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 09.10.2024 [2024/41]
Applicant(s)For all designated states
CAMPAGNOLO S.R.L.
Via della Chimica 4
36100 Vicenza / IT
[2017/49]
Inventor(s)01 / MARANGON, Christian
Via Dell'Artigianato, 10
I-36016 Thiene (VI) / IT
 [2017/49]
Representative(s)Porta & Consulenti Associati S.p.A.
Via Vittoria Colonna, 4
20149 Milano / IT
[2020/29]
Former [2017/49]Porta, Checcacci & Associati S.p.A
Via Trebbia, 20
20135 Milano / IT
Application number, filing date17172766.224.05.2017
[2017/49]
Priority number, dateIT2016UA0400531.05.2016         Original published format: IT UA20164005
[2017/49]
Filing languageIT
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3251934
Date:06.12.2017
Language:EN
[2017/49]
Type: B1 Patent specification 
No.:EP3251934
Date:15.07.2020
Language:EN
[2020/29]
Search report(s)(Supplementary) European search report - dispatched on:EP07.11.2017
ClassificationIPC:B62K23/06, B62M25/04
[2017/49]
CPC:
B62M25/04 (EP,CN,US); B62K23/06 (EP,US); B62M11/04 (US);
B62L3/02 (US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/28]
Former [2017/49]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:BETÄTIGUNGSVORRICHTUNG DES SEILZUGS EINER FAHRRADGANGSCHALTUNG[2017/49]
English:ACTUATION DEVICE OF THE CONTROL CABLE OF A BICYCLE GEARSHIFT[2017/49]
French:DISPOSITIF D'ACTIONNEMENT DU CÂBLE DE COMMANDE DE CHANGEMENT DE VITESSES DE BICYCLETTE[2017/49]
Examination procedure24.05.2017Date on which the examining division has become responsible
04.06.2018Amendment by applicant (claims and/or description)
04.06.2018Examination requested  [2018/28]
06.03.2020Communication of intention to grant the patent
22.05.2020Fee for grant paid
22.05.2020Fee for publishing/printing paid
22.05.2020Receipt of the translation of the claim(s)
Opposition(s)16.04.2021No opposition filed within time limit [2021/25]
Fees paidRenewal fee
28.05.2019Renewal fee patent year 03
27.05.2020Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU24.05.2017
AL15.07.2020
AT15.07.2020
CY15.07.2020
CZ15.07.2020
DK15.07.2020
EE15.07.2020
ES15.07.2020
FI15.07.2020
HR15.07.2020
LT15.07.2020
LV15.07.2020
MC15.07.2020
MK15.07.2020
MT15.07.2020
NL15.07.2020
PL15.07.2020
RO15.07.2020
RS15.07.2020
SE15.07.2020
SI15.07.2020
SK15.07.2020
SM15.07.2020
BG15.10.2020
NO15.10.2020
GR16.10.2020
IS15.11.2020
PT16.11.2020
[2024/41]
Former [2024/22]HU24.05.2017
AL15.07.2020
AT15.07.2020
CY15.07.2020
CZ15.07.2020
DK15.07.2020
EE15.07.2020
ES15.07.2020
FI15.07.2020
HR15.07.2020
LT15.07.2020
LV15.07.2020
MC15.07.2020
MK15.07.2020
NL15.07.2020
PL15.07.2020
RO15.07.2020
RS15.07.2020
SE15.07.2020
SI15.07.2020
SK15.07.2020
SM15.07.2020
BG15.10.2020
NO15.10.2020
GR16.10.2020
IS15.11.2020
PT16.11.2020
Former [2023/30]HU24.05.2017
AL15.07.2020
AT15.07.2020
CY15.07.2020
CZ15.07.2020
DK15.07.2020
EE15.07.2020
ES15.07.2020
FI15.07.2020
HR15.07.2020
LT15.07.2020
LV15.07.2020
MC15.07.2020
NL15.07.2020
PL15.07.2020
RO15.07.2020
RS15.07.2020
SE15.07.2020
SI15.07.2020
SK15.07.2020
SM15.07.2020
BG15.10.2020
NO15.10.2020
GR16.10.2020
IS15.11.2020
PT16.11.2020
Former [2023/29]HU24.05.2017
AL15.07.2020
AT15.07.2020
CZ15.07.2020
DK15.07.2020
EE15.07.2020
ES15.07.2020
FI15.07.2020
HR15.07.2020
LT15.07.2020
LV15.07.2020
MC15.07.2020
NL15.07.2020
PL15.07.2020
RO15.07.2020
RS15.07.2020
SE15.07.2020
SI15.07.2020
SK15.07.2020
SM15.07.2020
BG15.10.2020
NO15.10.2020
GR16.10.2020
IS15.11.2020
PT16.11.2020
Former [2022/07]AL15.07.2020
AT15.07.2020
CZ15.07.2020
DK15.07.2020
EE15.07.2020
ES15.07.2020
FI15.07.2020
HR15.07.2020
LT15.07.2020
LV15.07.2020
MC15.07.2020
NL15.07.2020
PL15.07.2020
RO15.07.2020
RS15.07.2020
SE15.07.2020
SI15.07.2020
SK15.07.2020
SM15.07.2020
BG15.10.2020
NO15.10.2020
GR16.10.2020
IS15.11.2020
PT16.11.2020
Former [2021/36]AL15.07.2020
AT15.07.2020
CZ15.07.2020
DK15.07.2020
EE15.07.2020
ES15.07.2020
FI15.07.2020
HR15.07.2020
LT15.07.2020
LV15.07.2020
NL15.07.2020
PL15.07.2020
RO15.07.2020
RS15.07.2020
SE15.07.2020
SI15.07.2020
SK15.07.2020
SM15.07.2020
BG15.10.2020
NO15.10.2020
GR16.10.2020
IS15.11.2020
PT16.11.2020
Former [2021/28]AL15.07.2020
AT15.07.2020
CZ15.07.2020
DK15.07.2020
EE15.07.2020
ES15.07.2020
FI15.07.2020
HR15.07.2020
LT15.07.2020
LV15.07.2020
NL15.07.2020
PL15.07.2020
RO15.07.2020
RS15.07.2020
SE15.07.2020
SK15.07.2020
SM15.07.2020
BG15.10.2020
NO15.10.2020
GR16.10.2020
IS15.11.2020
PT16.11.2020
Former [2021/25]AL15.07.2020
AT15.07.2020
CZ15.07.2020
DK15.07.2020
EE15.07.2020
ES15.07.2020
FI15.07.2020
HR15.07.2020
LT15.07.2020
LV15.07.2020
NL15.07.2020
PL15.07.2020
RO15.07.2020
RS15.07.2020
SE15.07.2020
SM15.07.2020
BG15.10.2020
NO15.10.2020
GR16.10.2020
IS15.11.2020
PT16.11.2020
Former [2021/22]AT15.07.2020
CZ15.07.2020
DK15.07.2020
EE15.07.2020
ES15.07.2020
FI15.07.2020
HR15.07.2020
LT15.07.2020
LV15.07.2020
NL15.07.2020
PL15.07.2020
RO15.07.2020
RS15.07.2020
SE15.07.2020
SM15.07.2020
BG15.10.2020
NO15.10.2020
GR16.10.2020
IS15.11.2020
PT16.11.2020
Former [2021/21]AT15.07.2020
DK15.07.2020
ES15.07.2020
FI15.07.2020
HR15.07.2020
LT15.07.2020
LV15.07.2020
NL15.07.2020
PL15.07.2020
RS15.07.2020
SE15.07.2020
BG15.10.2020
NO15.10.2020
GR16.10.2020
IS15.11.2020
PT16.11.2020
Former [2021/17]AT15.07.2020
ES15.07.2020
FI15.07.2020
HR15.07.2020
LT15.07.2020
LV15.07.2020
NL15.07.2020
PL15.07.2020
RS15.07.2020
SE15.07.2020
BG15.10.2020
NO15.10.2020
GR16.10.2020
IS15.11.2020
PT16.11.2020
Former [2021/10]AT15.07.2020
ES15.07.2020
FI15.07.2020
HR15.07.2020
LT15.07.2020
LV15.07.2020
PL15.07.2020
RS15.07.2020
SE15.07.2020
BG15.10.2020
NO15.10.2020
GR16.10.2020
IS15.11.2020
PT16.11.2020
Former [2021/09]AT15.07.2020
ES15.07.2020
FI15.07.2020
LT15.07.2020
SE15.07.2020
BG15.10.2020
NO15.10.2020
GR16.10.2020
PT16.11.2020
Former [2021/08]ES15.07.2020
FI15.07.2020
LT15.07.2020
SE15.07.2020
BG15.10.2020
NO15.10.2020
PT16.11.2020
Former [2021/07]FI15.07.2020
LT15.07.2020
NO15.10.2020
Documents cited:Search[I]US5615580  (CHEN FU H [TW], et al) [I] 1 * column 3, line 1 - line 55; figures 3-5 *;
 [XI]EP1564131  (CAMPAGNOLO SRL [IT]) [X] 1-3 * paragraph [0110] - paragraph [0120]; figures 1-5,14-18 * [I] 4,5,9,12-15,17;
 [XI]EP1749738  (CAMPAGNOLO SRL [IT]) [X] 1-3 * paragraph [0080] - paragraph [0088]; figures 3-6 * [I] 4,5,9,12-15,17;
 [A]CN203381765U  (AD II ENGINEERING INC) [A] 1* abstract *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.