| EP3258585 - ISOLATED POWER CONVERTER WITH OUTPUT VOLTAGE PROTECTION [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 04.02.2022 Database last updated on 14.03.2026 | |
| Former | The patent has been granted Status updated on 26.02.2021 | ||
| Former | Grant of patent is intended Status updated on 01.12.2020 | ||
| Former | Examination is in progress Status updated on 02.09.2019 | ||
| Former | Request for examination was made Status updated on 29.06.2018 | ||
| Former | The application has been published Status updated on 17.11.2017 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states NXP B.V. High Tech Campus Building 60 5656 AG Eindhoven / NL | [2017/51] | Inventor(s) | 01 /
Langeslag, Wilhelmus Hinderikus Maria c/o NXP Semiconductors, Intellectual Property Group Abbey House 25 Clarendon Road Redhill, Surrey RH1 1QZ / GB | 02 /
Kleinpenning, Jeroen c/o NXP Semiconductors, Intellectual Property Group Abbey House 25 Clarendon Road Redhill, Surrey RH1 1QZ / GB | [2017/51] | Representative(s) | Miles, John Richard NXP Semiconductors Intellectual Property Group The Cattle Barn, Upper Ashfield Farm Hoe Lane Romsey, Hampshire SO51 9NJ / GB | [N/P] |
| Former [2017/51] | Miles, John Richard NXP SEMICONDUCTORS Intellectual Property Group Abbey House 25 Clarendon Road Redhill, Surrey RH1 1QZ / GB | Application number, filing date | 17172959.3 | 25.05.2017 | [2017/51] | Priority number, date | US201615184432 | 16.06.2016 Original published format: US201615184432 | [2017/51] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3258585 | Date: | 20.12.2017 | Language: | EN | [2017/51] | Type: | B1 Patent specification | No.: | EP3258585 | Date: | 31.03.2021 | Language: | EN | [2021/13] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 08.11.2017 | Classification | IPC: | H02M3/335, H02M1/32, H02M1/00 | [2017/51] | CPC: |
H02M3/33523 (EP,US);
H02M7/217 (CN);
H02H7/1213 (CN);
H02M1/08 (US);
H02M1/32 (EP,US);
H02M3/33561 (CN);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/31] |
| Former [2017/51] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | ISOLIERTER STROMWANDLER MIT AUSGANGSSPANNUNGSSCHUTZ | [2017/51] | English: | ISOLATED POWER CONVERTER WITH OUTPUT VOLTAGE PROTECTION | [2017/51] | French: | CONVERTISSEUR DE PUISSANCE ISOLÉ AVEC PROTECTION DE LA TENSION DE SORTIE | [2017/51] | Examination procedure | 25.05.2017 | Date on which the examining division has become responsible | 29.05.2018 | Amendment by applicant (claims and/or description) | 20.06.2018 | Examination requested [2018/31] | 05.09.2019 | Despatch of a communication from the examining division (Time limit: M04) | 11.12.2019 | Reply to a communication from the examining division | 02.12.2020 | Communication of intention to grant the patent | 22.02.2021 | Fee for grant paid | 22.02.2021 | Fee for publishing/printing paid | 22.02.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 04.01.2022 | No opposition filed within time limit [2022/10] | Fees paid | Renewal fee | 31.05.2019 | Renewal fee patent year 03 | 02.06.2020 | Renewal fee patent year 04 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 25.05.2017 | AL | 31.03.2021 | AT | 31.03.2021 | CY | 31.03.2021 | CZ | 31.03.2021 | DK | 31.03.2021 | EE | 31.03.2021 | ES | 31.03.2021 | FI | 31.03.2021 | GR | 31.03.2021 | HR | 31.03.2021 | IT | 31.03.2021 | LT | 31.03.2021 | LV | 31.03.2021 | MC | 31.03.2021 | MK | 31.03.2021 | MT | 31.03.2021 | NL | 31.03.2021 | PL | 31.03.2021 | RO | 31.03.2021 | RS | 31.03.2021 | SE | 31.03.2021 | SI | 31.03.2021 | SK | 31.03.2021 | SM | 31.03.2021 | TR | 31.03.2021 | IE | 25.05.2021 | LU | 25.05.2021 | BE | 31.05.2021 | CH | 31.05.2021 | FR | 31.05.2021 | LI | 31.05.2021 | BG | 30.06.2021 | GB | 30.06.2021 | NO | 30.06.2021 | IS | 31.07.2021 | PT | 02.08.2021 | [2024/41] |
| Former [2024/29] | HU | 25.05.2017 | |
| AL | 31.03.2021 | ||
| AT | 31.03.2021 | ||
| CY | 31.03.2021 | ||
| CZ | 31.03.2021 | ||
| DK | 31.03.2021 | ||
| EE | 31.03.2021 | ||
| ES | 31.03.2021 | ||
| FI | 31.03.2021 | ||
| GR | 31.03.2021 | ||
| HR | 31.03.2021 | ||
| IT | 31.03.2021 | ||
| LT | 31.03.2021 | ||
| LV | 31.03.2021 | ||
| MC | 31.03.2021 | ||
| MK | 31.03.2021 | ||
| NL | 31.03.2021 | ||
| PL | 31.03.2021 | ||
| RO | 31.03.2021 | ||
| RS | 31.03.2021 | ||
| SE | 31.03.2021 | ||
| SI | 31.03.2021 | ||
| SK | 31.03.2021 | ||
| SM | 31.03.2021 | ||
| TR | 31.03.2021 | ||
| IE | 25.05.2021 | ||
| LU | 25.05.2021 | ||
| BE | 31.05.2021 | ||
| CH | 31.05.2021 | ||
| FR | 31.05.2021 | ||
| LI | 31.05.2021 | ||
| BG | 30.06.2021 | ||
| GB | 30.06.2021 | ||
| NO | 30.06.2021 | ||
| IS | 31.07.2021 | ||
| PT | 02.08.2021 | ||
| Former [2024/22] | HU | 25.05.2017 | |
| AL | 31.03.2021 | ||
| AT | 31.03.2021 | ||
| CY | 31.03.2021 | ||
| CZ | 31.03.2021 | ||
| DK | 31.03.2021 | ||
| EE | 31.03.2021 | ||
| ES | 31.03.2021 | ||
| FI | 31.03.2021 | ||
| GR | 31.03.2021 | ||
| HR | 31.03.2021 | ||
| IT | 31.03.2021 | ||
| LT | 31.03.2021 | ||
| LV | 31.03.2021 | ||
| MC | 31.03.2021 | ||
| MK | 31.03.2021 | ||
| NL | 31.03.2021 | ||
| PL | 31.03.2021 | ||
| RO | 31.03.2021 | ||
| RS | 31.03.2021 | ||
| SE | 31.03.2021 | ||
| SI | 31.03.2021 | ||
| SK | 31.03.2021 | ||
| SM | 31.03.2021 | ||
| IE | 25.05.2021 | ||
| LU | 25.05.2021 | ||
| BE | 31.05.2021 | ||
| CH | 31.05.2021 | ||
| FR | 31.05.2021 | ||
| LI | 31.05.2021 | ||
| BG | 30.06.2021 | ||
| GB | 30.06.2021 | ||
| NO | 30.06.2021 | ||
| IS | 31.07.2021 | ||
| PT | 02.08.2021 | ||
| Former [2023/36] | HU | 25.05.2017 | |
| AL | 31.03.2021 | ||
| AT | 31.03.2021 | ||
| CY | 31.03.2021 | ||
| CZ | 31.03.2021 | ||
| DK | 31.03.2021 | ||
| EE | 31.03.2021 | ||
| ES | 31.03.2021 | ||
| FI | 31.03.2021 | ||
| GR | 31.03.2021 | ||
| HR | 31.03.2021 | ||
| IT | 31.03.2021 | ||
| LT | 31.03.2021 | ||
| LV | 31.03.2021 | ||
| MC | 31.03.2021 | ||
| NL | 31.03.2021 | ||
| PL | 31.03.2021 | ||
| RO | 31.03.2021 | ||
| RS | 31.03.2021 | ||
| SE | 31.03.2021 | ||
| SI | 31.03.2021 | ||
| SK | 31.03.2021 | ||
| SM | 31.03.2021 | ||
| IE | 25.05.2021 | ||
| LU | 25.05.2021 | ||
| BE | 31.05.2021 | ||
| CH | 31.05.2021 | ||
| FR | 31.05.2021 | ||
| LI | 31.05.2021 | ||
| BG | 30.06.2021 | ||
| GB | 30.06.2021 | ||
| NO | 30.06.2021 | ||
| IS | 31.07.2021 | ||
| PT | 02.08.2021 | ||
| Former [2023/30] | HU | 25.05.2017 | |
| AL | 31.03.2021 | ||
| AT | 31.03.2021 | ||
| CY | 31.03.2021 | ||
| CZ | 31.03.2021 | ||
| DK | 31.03.2021 | ||
| EE | 31.03.2021 | ||
| ES | 31.03.2021 | ||
| FI | 31.03.2021 | ||
| HR | 31.03.2021 | ||
| IT | 31.03.2021 | ||
| LT | 31.03.2021 | ||
| LV | 31.03.2021 | ||
| MC | 31.03.2021 | ||
| NL | 31.03.2021 | ||
| PL | 31.03.2021 | ||
| RO | 31.03.2021 | ||
| RS | 31.03.2021 | ||
| SE | 31.03.2021 | ||
| SI | 31.03.2021 | ||
| SK | 31.03.2021 | ||
| SM | 31.03.2021 | ||
| IE | 25.05.2021 | ||
| LU | 25.05.2021 | ||
| BE | 31.05.2021 | ||
| CH | 31.05.2021 | ||
| FR | 31.05.2021 | ||
| LI | 31.05.2021 | ||
| BG | 30.06.2021 | ||
| GB | 30.06.2021 | ||
| NO | 30.06.2021 | ||
| IS | 31.07.2021 | ||
| PT | 02.08.2021 | ||
| Former [2023/28] | HU | 25.05.2017 | |
| AL | 31.03.2021 | ||
| AT | 31.03.2021 | ||
| CZ | 31.03.2021 | ||
| DK | 31.03.2021 | ||
| EE | 31.03.2021 | ||
| ES | 31.03.2021 | ||
| FI | 31.03.2021 | ||
| HR | 31.03.2021 | ||
| IT | 31.03.2021 | ||
| LT | 31.03.2021 | ||
| LV | 31.03.2021 | ||
| MC | 31.03.2021 | ||
| NL | 31.03.2021 | ||
| PL | 31.03.2021 | ||
| RO | 31.03.2021 | ||
| RS | 31.03.2021 | ||
| SE | 31.03.2021 | ||
| SI | 31.03.2021 | ||
| SK | 31.03.2021 | ||
| SM | 31.03.2021 | ||
| IE | 25.05.2021 | ||
| LU | 25.05.2021 | ||
| BE | 31.05.2021 | ||
| CH | 31.05.2021 | ||
| FR | 31.05.2021 | ||
| LI | 31.05.2021 | ||
| BG | 30.06.2021 | ||
| GB | 30.06.2021 | ||
| NO | 30.06.2021 | ||
| IS | 31.07.2021 | ||
| PT | 02.08.2021 | ||
| Former [2022/36] | AL | 31.03.2021 | |
| AT | 31.03.2021 | ||
| CZ | 31.03.2021 | ||
| DK | 31.03.2021 | ||
| EE | 31.03.2021 | ||
| ES | 31.03.2021 | ||
| FI | 31.03.2021 | ||
| HR | 31.03.2021 | ||
| IT | 31.03.2021 | ||
| LT | 31.03.2021 | ||
| LV | 31.03.2021 | ||
| MC | 31.03.2021 | ||
| NL | 31.03.2021 | ||
| PL | 31.03.2021 | ||
| RO | 31.03.2021 | ||
| RS | 31.03.2021 | ||
| SE | 31.03.2021 | ||
| SI | 31.03.2021 | ||
| SK | 31.03.2021 | ||
| SM | 31.03.2021 | ||
| IE | 25.05.2021 | ||
| LU | 25.05.2021 | ||
| BE | 31.05.2021 | ||
| CH | 31.05.2021 | ||
| FR | 31.05.2021 | ||
| LI | 31.05.2021 | ||
| BG | 30.06.2021 | ||
| GB | 30.06.2021 | ||
| NO | 30.06.2021 | ||
| IS | 31.07.2021 | ||
| PT | 02.08.2021 | ||
| Former [2022/34] | AL | 31.03.2021 | |
| AT | 31.03.2021 | ||
| CZ | 31.03.2021 | ||
| DK | 31.03.2021 | ||
| EE | 31.03.2021 | ||
| ES | 31.03.2021 | ||
| FI | 31.03.2021 | ||
| HR | 31.03.2021 | ||
| LT | 31.03.2021 | ||
| LV | 31.03.2021 | ||
| MC | 31.03.2021 | ||
| NL | 31.03.2021 | ||
| PL | 31.03.2021 | ||
| RO | 31.03.2021 | ||
| RS | 31.03.2021 | ||
| SE | 31.03.2021 | ||
| SI | 31.03.2021 | ||
| SK | 31.03.2021 | ||
| SM | 31.03.2021 | ||
| IE | 25.05.2021 | ||
| LU | 25.05.2021 | ||
| BE | 31.05.2021 | ||
| CH | 31.05.2021 | ||
| FR | 31.05.2021 | ||
| LI | 31.05.2021 | ||
| BG | 30.06.2021 | ||
| GB | 30.06.2021 | ||
| NO | 30.06.2021 | ||
| IS | 31.07.2021 | ||
| PT | 02.08.2021 | ||
| Former [2022/29] | AL | 31.03.2021 | |
| AT | 31.03.2021 | ||
| CZ | 31.03.2021 | ||
| DK | 31.03.2021 | ||
| EE | 31.03.2021 | ||
| ES | 31.03.2021 | ||
| FI | 31.03.2021 | ||
| HR | 31.03.2021 | ||
| LT | 31.03.2021 | ||
| LV | 31.03.2021 | ||
| MC | 31.03.2021 | ||
| NL | 31.03.2021 | ||
| PL | 31.03.2021 | ||
| RO | 31.03.2021 | ||
| RS | 31.03.2021 | ||
| SE | 31.03.2021 | ||
| SI | 31.03.2021 | ||
| SK | 31.03.2021 | ||
| SM | 31.03.2021 | ||
| IE | 25.05.2021 | ||
| LU | 25.05.2021 | ||
| CH | 31.05.2021 | ||
| FR | 31.05.2021 | ||
| LI | 31.05.2021 | ||
| BG | 30.06.2021 | ||
| GB | 30.06.2021 | ||
| NO | 30.06.2021 | ||
| IS | 31.07.2021 | ||
| PT | 02.08.2021 | ||
| Former [2022/23] | AL | 31.03.2021 | |
| AT | 31.03.2021 | ||
| CZ | 31.03.2021 | ||
| DK | 31.03.2021 | ||
| EE | 31.03.2021 | ||
| ES | 31.03.2021 | ||
| FI | 31.03.2021 | ||
| HR | 31.03.2021 | ||
| LT | 31.03.2021 | ||
| LV | 31.03.2021 | ||
| MC | 31.03.2021 | ||
| NL | 31.03.2021 | ||
| PL | 31.03.2021 | ||
| RO | 31.03.2021 | ||
| RS | 31.03.2021 | ||
| SE | 31.03.2021 | ||
| SK | 31.03.2021 | ||
| SM | 31.03.2021 | ||
| IE | 25.05.2021 | ||
| LU | 25.05.2021 | ||
| CH | 31.05.2021 | ||
| FR | 31.05.2021 | ||
| LI | 31.05.2021 | ||
| BG | 30.06.2021 | ||
| GB | 30.06.2021 | ||
| NO | 30.06.2021 | ||
| IS | 31.07.2021 | ||
| PT | 02.08.2021 | ||
| Former [2022/22] | AL | 31.03.2021 | |
| AT | 31.03.2021 | ||
| CZ | 31.03.2021 | ||
| DK | 31.03.2021 | ||
| EE | 31.03.2021 | ||
| ES | 31.03.2021 | ||
| FI | 31.03.2021 | ||
| HR | 31.03.2021 | ||
| LT | 31.03.2021 | ||
| LV | 31.03.2021 | ||
| MC | 31.03.2021 | ||
| NL | 31.03.2021 | ||
| PL | 31.03.2021 | ||
| RO | 31.03.2021 | ||
| RS | 31.03.2021 | ||
| SE | 31.03.2021 | ||
| SK | 31.03.2021 | ||
| SM | 31.03.2021 | ||
| IE | 25.05.2021 | ||
| LU | 25.05.2021 | ||
| CH | 31.05.2021 | ||
| LI | 31.05.2021 | ||
| BG | 30.06.2021 | ||
| GB | 30.06.2021 | ||
| NO | 30.06.2021 | ||
| PT | 02.08.2021 | ||
| IS | 24.12.2021 | ||
| Former [2022/21] | AL | 31.03.2021 | |
| AT | 31.03.2021 | ||
| CZ | 31.03.2021 | ||
| DK | 31.03.2021 | ||
| EE | 31.03.2021 | ||
| ES | 31.03.2021 | ||
| FI | 31.03.2021 | ||
| HR | 31.03.2021 | ||
| LT | 31.03.2021 | ||
| LV | 31.03.2021 | ||
| MC | 31.03.2021 | ||
| NL | 31.03.2021 | ||
| PL | 31.03.2021 | ||
| RO | 31.03.2021 | ||
| RS | 31.03.2021 | ||
| SE | 31.03.2021 | ||
| SK | 31.03.2021 | ||
| SM | 31.03.2021 | ||
| IE | 25.05.2021 | ||
| LU | 25.05.2021 | ||
| CH | 31.05.2021 | ||
| LI | 31.05.2021 | ||
| BG | 30.06.2021 | ||
| NO | 30.06.2021 | ||
| PT | 02.08.2021 | ||
| IS | 24.12.2021 | ||
| Former [2022/10] | AL | 31.03.2021 | |
| AT | 31.03.2021 | ||
| CZ | 31.03.2021 | ||
| DK | 31.03.2021 | ||
| EE | 31.03.2021 | ||
| ES | 31.03.2021 | ||
| FI | 31.03.2021 | ||
| HR | 31.03.2021 | ||
| LT | 31.03.2021 | ||
| LV | 31.03.2021 | ||
| MC | 31.03.2021 | ||
| NL | 31.03.2021 | ||
| PL | 31.03.2021 | ||
| RO | 31.03.2021 | ||
| RS | 31.03.2021 | ||
| SE | 31.03.2021 | ||
| SK | 31.03.2021 | ||
| SM | 31.03.2021 | ||
| LU | 25.05.2021 | ||
| CH | 31.05.2021 | ||
| LI | 31.05.2021 | ||
| BG | 30.06.2021 | ||
| NO | 30.06.2021 | ||
| PT | 02.08.2021 | ||
| IS | 24.12.2021 | ||
| Former [2022/08] | AL | 31.03.2021 | |
| AT | 31.03.2021 | ||
| CZ | 31.03.2021 | ||
| DK | 31.03.2021 | ||
| EE | 31.03.2021 | ||
| ES | 31.03.2021 | ||
| FI | 31.03.2021 | ||
| HR | 31.03.2021 | ||
| LT | 31.03.2021 | ||
| LV | 31.03.2021 | ||
| MC | 31.03.2021 | ||
| NL | 31.03.2021 | ||
| PL | 31.03.2021 | ||
| RO | 31.03.2021 | ||
| RS | 31.03.2021 | ||
| SE | 31.03.2021 | ||
| SK | 31.03.2021 | ||
| SM | 31.03.2021 | ||
| LU | 25.05.2021 | ||
| BG | 30.06.2021 | ||
| NO | 30.06.2021 | ||
| IS | 31.07.2021 | ||
| PT | 02.08.2021 | ||
| Former [2022/07] | AL | 31.03.2021 | |
| AT | 31.03.2021 | ||
| CZ | 31.03.2021 | ||
| EE | 31.03.2021 | ||
| FI | 31.03.2021 | ||
| HR | 31.03.2021 | ||
| LT | 31.03.2021 | ||
| LV | 31.03.2021 | ||
| MC | 31.03.2021 | ||
| NL | 31.03.2021 | ||
| PL | 31.03.2021 | ||
| RO | 31.03.2021 | ||
| RS | 31.03.2021 | ||
| SE | 31.03.2021 | ||
| SK | 31.03.2021 | ||
| SM | 31.03.2021 | ||
| BG | 30.06.2021 | ||
| NO | 30.06.2021 | ||
| IS | 31.07.2021 | ||
| PT | 02.08.2021 | ||
| Former [2021/52] | AT | 31.03.2021 | |
| CZ | 31.03.2021 | ||
| EE | 31.03.2021 | ||
| FI | 31.03.2021 | ||
| HR | 31.03.2021 | ||
| LT | 31.03.2021 | ||
| LV | 31.03.2021 | ||
| NL | 31.03.2021 | ||
| PL | 31.03.2021 | ||
| RO | 31.03.2021 | ||
| RS | 31.03.2021 | ||
| SE | 31.03.2021 | ||
| SK | 31.03.2021 | ||
| SM | 31.03.2021 | ||
| BG | 30.06.2021 | ||
| NO | 30.06.2021 | ||
| IS | 31.07.2021 | ||
| PT | 02.08.2021 | ||
| Former [2021/51] | AT | 31.03.2021 | |
| CZ | 31.03.2021 | ||
| EE | 31.03.2021 | ||
| FI | 31.03.2021 | ||
| HR | 31.03.2021 | ||
| LT | 31.03.2021 | ||
| LV | 31.03.2021 | ||
| NL | 31.03.2021 | ||
| RO | 31.03.2021 | ||
| RS | 31.03.2021 | ||
| SE | 31.03.2021 | ||
| SK | 31.03.2021 | ||
| SM | 31.03.2021 | ||
| BG | 30.06.2021 | ||
| NO | 30.06.2021 | ||
| IS | 31.07.2021 | ||
| PT | 02.08.2021 | ||
| Former [2021/50] | AT | 31.03.2021 | |
| CZ | 31.03.2021 | ||
| EE | 31.03.2021 | ||
| FI | 31.03.2021 | ||
| HR | 31.03.2021 | ||
| LT | 31.03.2021 | ||
| LV | 31.03.2021 | ||
| NL | 31.03.2021 | ||
| RO | 31.03.2021 | ||
| RS | 31.03.2021 | ||
| SE | 31.03.2021 | ||
| SK | 31.03.2021 | ||
| SM | 31.03.2021 | ||
| BG | 30.06.2021 | ||
| NO | 30.06.2021 | ||
| PT | 02.08.2021 | ||
| Former [2021/48] | AT | 31.03.2021 | |
| CZ | 31.03.2021 | ||
| EE | 31.03.2021 | ||
| FI | 31.03.2021 | ||
| HR | 31.03.2021 | ||
| LT | 31.03.2021 | ||
| LV | 31.03.2021 | ||
| NL | 31.03.2021 | ||
| RS | 31.03.2021 | ||
| SE | 31.03.2021 | ||
| SM | 31.03.2021 | ||
| BG | 30.06.2021 | ||
| NO | 30.06.2021 | ||
| Former [2021/47] | AT | 31.03.2021 | |
| FI | 31.03.2021 | ||
| HR | 31.03.2021 | ||
| LT | 31.03.2021 | ||
| LV | 31.03.2021 | ||
| NL | 31.03.2021 | ||
| RS | 31.03.2021 | ||
| SE | 31.03.2021 | ||
| SM | 31.03.2021 | ||
| BG | 30.06.2021 | ||
| NO | 30.06.2021 | ||
| Former [2021/46] | AT | 31.03.2021 | |
| FI | 31.03.2021 | ||
| HR | 31.03.2021 | ||
| LT | 31.03.2021 | ||
| LV | 31.03.2021 | ||
| RS | 31.03.2021 | ||
| SE | 31.03.2021 | ||
| SM | 31.03.2021 | ||
| BG | 30.06.2021 | ||
| NO | 30.06.2021 | ||
| Former [2021/38] | FI | 31.03.2021 | |
| HR | 31.03.2021 | ||
| LV | 31.03.2021 | ||
| RS | 31.03.2021 | ||
| SE | 31.03.2021 | ||
| BG | 30.06.2021 | ||
| NO | 30.06.2021 | ||
| Former [2021/37] | FI | 31.03.2021 | |
| HR | 31.03.2021 | ||
| LV | 31.03.2021 | ||
| RS | 31.03.2021 | ||
| BG | 30.06.2021 | ||
| NO | 30.06.2021 | ||
| Former [2021/36] | FI | 31.03.2021 | |
| HR | 31.03.2021 | ||
| BG | 30.06.2021 | ||
| NO | 30.06.2021 | ||
| Former [2021/35] | FI | 31.03.2021 | |
| HR | 31.03.2021 | ||
| NO | 30.06.2021 | ||
| Former [2021/33] | FI | 31.03.2021 | |
| NO | 30.06.2021 | Documents cited: | Search | [XAY] US5841313 (LEVIN GEDALY et al.) [X] 1,8 * column 13, lines 15-60; figures 1,2 * * column 30, lines 25-35 *[A] 3,5-7 [Y] 2,4,9-15 | [Y] US2014169046 (CHEN FU-CHUAN et al.) [Y] 2,4,12,15 * paragraph [0021] - paragraph [0024]; figures 1,2 * * paragraph [0037] * * paragraph [0048] - paragraph [0050] * | [Y] US2015043248 (HSIAO YUNG-HUNG et al.) [Y] 9,13,14 * paragraph [0043] - paragraph [0044]; figures 1-9 * * paragraph [0056] - paragraph [0058] * * paragraph [0061] - paragraph [0062] * * paragraph [0065] * * paragraph [0072] - paragraph [0074] * | [Y] US2015212566 (BODNAR ERIC O et al.) [Y] 10,11 * paragraph [0038] - paragraph [0039]; figure 4 * |