Extract from the Register of European Patents

EP About this file: EP3258585

EP3258585 - ISOLATED POWER CONVERTER WITH OUTPUT VOLTAGE PROTECTION [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  04.02.2022
Database last updated on 14.03.2026
FormerThe patent has been granted
Status updated on  26.02.2021
FormerGrant of patent is intended
Status updated on  01.12.2020
FormerExamination is in progress
Status updated on  02.09.2019
FormerRequest for examination was made
Status updated on  29.06.2018
FormerThe application has been published
Status updated on  17.11.2017
Most recent event   Tooltip06.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 09.10.2024  [2024/41]
Applicant(s)For all designated states
NXP B.V.
High Tech Campus Building 60
5656 AG Eindhoven / NL
[2017/51]
Inventor(s)01 / Langeslag, Wilhelmus Hinderikus Maria
c/o NXP Semiconductors,
Intellectual Property Group
Abbey House
25 Clarendon Road
Redhill, Surrey RH1 1QZ / GB
02 / Kleinpenning, Jeroen
c/o NXP Semiconductors,
Intellectual Property Group
Abbey House
25 Clarendon Road
Redhill, Surrey RH1 1QZ / GB
 [2017/51]
Representative(s)Miles, John Richard
NXP Semiconductors
Intellectual Property Group The Cattle Barn, Upper Ashfield Farm
Hoe Lane
Romsey, Hampshire SO51 9NJ / GB
[N/P]
Former [2017/51]Miles, John Richard
NXP SEMICONDUCTORS
Intellectual Property Group
Abbey House
25 Clarendon Road
Redhill, Surrey RH1 1QZ / GB
Application number, filing date17172959.325.05.2017
[2017/51]
Priority number, dateUS20161518443216.06.2016         Original published format: US201615184432
[2017/51]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3258585
Date:20.12.2017
Language:EN
[2017/51]
Type: B1 Patent specification 
No.:EP3258585
Date:31.03.2021
Language:EN
[2021/13]
Search report(s)(Supplementary) European search report - dispatched on:EP08.11.2017
ClassificationIPC:H02M3/335, H02M1/32, H02M1/00
[2017/51]
CPC:
H02M3/33523 (EP,US); H02M7/217 (CN); H02H7/1213 (CN);
H02M1/08 (US); H02M1/32 (EP,US); H02M3/33561 (CN);
H02M3/33592 (CN); H02M1/0032 (EP,US); Y02B70/10 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/31]
Former [2017/51]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:ISOLIERTER STROMWANDLER MIT AUSGANGSSPANNUNGSSCHUTZ[2017/51]
English:ISOLATED POWER CONVERTER WITH OUTPUT VOLTAGE PROTECTION[2017/51]
French:CONVERTISSEUR DE PUISSANCE ISOLÉ AVEC PROTECTION DE LA TENSION DE SORTIE[2017/51]
Examination procedure25.05.2017Date on which the examining division has become responsible
29.05.2018Amendment by applicant (claims and/or description)
20.06.2018Examination requested  [2018/31]
05.09.2019Despatch of a communication from the examining division (Time limit: M04)
11.12.2019Reply to a communication from the examining division
02.12.2020Communication of intention to grant the patent
22.02.2021Fee for grant paid
22.02.2021Fee for publishing/printing paid
22.02.2021Receipt of the translation of the claim(s)
Opposition(s)04.01.2022No opposition filed within time limit [2022/10]
Fees paidRenewal fee
31.05.2019Renewal fee patent year 03
02.06.2020Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU25.05.2017
AL31.03.2021
AT31.03.2021
CY31.03.2021
CZ31.03.2021
DK31.03.2021
EE31.03.2021
ES31.03.2021
FI31.03.2021
GR31.03.2021
HR31.03.2021
IT31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
MK31.03.2021
MT31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SE31.03.2021
SI31.03.2021
SK31.03.2021
SM31.03.2021
TR31.03.2021
IE25.05.2021
LU25.05.2021
BE31.05.2021
CH31.05.2021
FR31.05.2021
LI31.05.2021
BG30.06.2021
GB30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
[2024/41]
Former [2024/29]HU25.05.2017
AL31.03.2021
AT31.03.2021
CY31.03.2021
CZ31.03.2021
DK31.03.2021
EE31.03.2021
ES31.03.2021
FI31.03.2021
GR31.03.2021
HR31.03.2021
IT31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
MK31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SE31.03.2021
SI31.03.2021
SK31.03.2021
SM31.03.2021
TR31.03.2021
IE25.05.2021
LU25.05.2021
BE31.05.2021
CH31.05.2021
FR31.05.2021
LI31.05.2021
BG30.06.2021
GB30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
Former [2024/22]HU25.05.2017
AL31.03.2021
AT31.03.2021
CY31.03.2021
CZ31.03.2021
DK31.03.2021
EE31.03.2021
ES31.03.2021
FI31.03.2021
GR31.03.2021
HR31.03.2021
IT31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
MK31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SE31.03.2021
SI31.03.2021
SK31.03.2021
SM31.03.2021
IE25.05.2021
LU25.05.2021
BE31.05.2021
CH31.05.2021
FR31.05.2021
LI31.05.2021
BG30.06.2021
GB30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
Former [2023/36]HU25.05.2017
AL31.03.2021
AT31.03.2021
CY31.03.2021
CZ31.03.2021
DK31.03.2021
EE31.03.2021
ES31.03.2021
FI31.03.2021
GR31.03.2021
HR31.03.2021
IT31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SE31.03.2021
SI31.03.2021
SK31.03.2021
SM31.03.2021
IE25.05.2021
LU25.05.2021
BE31.05.2021
CH31.05.2021
FR31.05.2021
LI31.05.2021
BG30.06.2021
GB30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
Former [2023/30]HU25.05.2017
AL31.03.2021
AT31.03.2021
CY31.03.2021
CZ31.03.2021
DK31.03.2021
EE31.03.2021
ES31.03.2021
FI31.03.2021
HR31.03.2021
IT31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SE31.03.2021
SI31.03.2021
SK31.03.2021
SM31.03.2021
IE25.05.2021
LU25.05.2021
BE31.05.2021
CH31.05.2021
FR31.05.2021
LI31.05.2021
BG30.06.2021
GB30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
Former [2023/28]HU25.05.2017
AL31.03.2021
AT31.03.2021
CZ31.03.2021
DK31.03.2021
EE31.03.2021
ES31.03.2021
FI31.03.2021
HR31.03.2021
IT31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SE31.03.2021
SI31.03.2021
SK31.03.2021
SM31.03.2021
IE25.05.2021
LU25.05.2021
BE31.05.2021
CH31.05.2021
FR31.05.2021
LI31.05.2021
BG30.06.2021
GB30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
Former [2022/36]AL31.03.2021
AT31.03.2021
CZ31.03.2021
DK31.03.2021
EE31.03.2021
ES31.03.2021
FI31.03.2021
HR31.03.2021
IT31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SE31.03.2021
SI31.03.2021
SK31.03.2021
SM31.03.2021
IE25.05.2021
LU25.05.2021
BE31.05.2021
CH31.05.2021
FR31.05.2021
LI31.05.2021
BG30.06.2021
GB30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
Former [2022/34]AL31.03.2021
AT31.03.2021
CZ31.03.2021
DK31.03.2021
EE31.03.2021
ES31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SE31.03.2021
SI31.03.2021
SK31.03.2021
SM31.03.2021
IE25.05.2021
LU25.05.2021
BE31.05.2021
CH31.05.2021
FR31.05.2021
LI31.05.2021
BG30.06.2021
GB30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
Former [2022/29]AL31.03.2021
AT31.03.2021
CZ31.03.2021
DK31.03.2021
EE31.03.2021
ES31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SE31.03.2021
SI31.03.2021
SK31.03.2021
SM31.03.2021
IE25.05.2021
LU25.05.2021
CH31.05.2021
FR31.05.2021
LI31.05.2021
BG30.06.2021
GB30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
Former [2022/23]AL31.03.2021
AT31.03.2021
CZ31.03.2021
DK31.03.2021
EE31.03.2021
ES31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SE31.03.2021
SK31.03.2021
SM31.03.2021
IE25.05.2021
LU25.05.2021
CH31.05.2021
FR31.05.2021
LI31.05.2021
BG30.06.2021
GB30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
Former [2022/22]AL31.03.2021
AT31.03.2021
CZ31.03.2021
DK31.03.2021
EE31.03.2021
ES31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SE31.03.2021
SK31.03.2021
SM31.03.2021
IE25.05.2021
LU25.05.2021
CH31.05.2021
LI31.05.2021
BG30.06.2021
GB30.06.2021
NO30.06.2021
PT02.08.2021
IS24.12.2021
Former [2022/21]AL31.03.2021
AT31.03.2021
CZ31.03.2021
DK31.03.2021
EE31.03.2021
ES31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SE31.03.2021
SK31.03.2021
SM31.03.2021
IE25.05.2021
LU25.05.2021
CH31.05.2021
LI31.05.2021
BG30.06.2021
NO30.06.2021
PT02.08.2021
IS24.12.2021
Former [2022/10]AL31.03.2021
AT31.03.2021
CZ31.03.2021
DK31.03.2021
EE31.03.2021
ES31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SE31.03.2021
SK31.03.2021
SM31.03.2021
LU25.05.2021
CH31.05.2021
LI31.05.2021
BG30.06.2021
NO30.06.2021
PT02.08.2021
IS24.12.2021
Former [2022/08]AL31.03.2021
AT31.03.2021
CZ31.03.2021
DK31.03.2021
EE31.03.2021
ES31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SE31.03.2021
SK31.03.2021
SM31.03.2021
LU25.05.2021
BG30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
Former [2022/07]AL31.03.2021
AT31.03.2021
CZ31.03.2021
EE31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SE31.03.2021
SK31.03.2021
SM31.03.2021
BG30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
Former [2021/52]AT31.03.2021
CZ31.03.2021
EE31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SE31.03.2021
SK31.03.2021
SM31.03.2021
BG30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
Former [2021/51]AT31.03.2021
CZ31.03.2021
EE31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
NL31.03.2021
RO31.03.2021
RS31.03.2021
SE31.03.2021
SK31.03.2021
SM31.03.2021
BG30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
Former [2021/50]AT31.03.2021
CZ31.03.2021
EE31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
NL31.03.2021
RO31.03.2021
RS31.03.2021
SE31.03.2021
SK31.03.2021
SM31.03.2021
BG30.06.2021
NO30.06.2021
PT02.08.2021
Former [2021/48]AT31.03.2021
CZ31.03.2021
EE31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
NL31.03.2021
RS31.03.2021
SE31.03.2021
SM31.03.2021
BG30.06.2021
NO30.06.2021
Former [2021/47]AT31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
NL31.03.2021
RS31.03.2021
SE31.03.2021
SM31.03.2021
BG30.06.2021
NO30.06.2021
Former [2021/46]AT31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
RS31.03.2021
SE31.03.2021
SM31.03.2021
BG30.06.2021
NO30.06.2021
Former [2021/38]FI31.03.2021
HR31.03.2021
LV31.03.2021
RS31.03.2021
SE31.03.2021
BG30.06.2021
NO30.06.2021
Former [2021/37]FI31.03.2021
HR31.03.2021
LV31.03.2021
RS31.03.2021
BG30.06.2021
NO30.06.2021
Former [2021/36]FI31.03.2021
HR31.03.2021
BG30.06.2021
NO30.06.2021
Former [2021/35]FI31.03.2021
HR31.03.2021
NO30.06.2021
Former [2021/33]FI31.03.2021
NO30.06.2021
Documents cited:Search[XAY] US5841313  (LEVIN GEDALY et al.) [X] 1,8 * column 13, lines 15-60; figures 1,2 * * column 30, lines 25-35 *[A] 3,5-7 [Y] 2,4,9-15
 [Y] US2014169046  (CHEN FU-CHUAN et al.) [Y] 2,4,12,15 * paragraph [0021] - paragraph [0024]; figures 1,2 * * paragraph [0037] * * paragraph [0048] - paragraph [0050] *
 [Y] US2015043248  (HSIAO YUNG-HUNG et al.) [Y] 9,13,14 * paragraph [0043] - paragraph [0044]; figures 1-9 * * paragraph [0056] - paragraph [0058] * * paragraph [0061] - paragraph [0062] * * paragraph [0065] * * paragraph [0072] - paragraph [0074] *
 [Y] US2015212566  (BODNAR ERIC O et al.) [Y] 10,11 * paragraph [0038] - paragraph [0039]; figure 4 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.