blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3252938

EP3252938 - PRECHARGE APPARATUS FOR POWER CONVERSION SYSTEM [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  19.03.2021
Database last updated on 30.07.2024
FormerThe patent has been granted
Status updated on  10.04.2020
FormerGrant of patent is intended
Status updated on  17.12.2019
FormerExamination is in progress
Status updated on  06.07.2018
FormerRequest for examination was made
Status updated on  01.06.2018
FormerThe application has been published
Status updated on  03.11.2017
Most recent event   Tooltip15.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 17.08.2022  [2022/33]
Applicant(s)For all designated states
Rockwell Automation Technologies, Inc.
1 Allen-Bradley Drive
Mayfield Heights, OH 44124 / US
[2017/49]
Inventor(s)01 / WEI, Lixiang
5341 W. Bayberry Pkwy.
Mequon, Wisconsin 53092 / US
02 / JANKOVIC, Zeljko Radomir
2626 N Newhall Street
Milwaukee, Wisconsin 53211 / US
 [2020/20]
Former [2017/49]01 / WEIi, Lixiang
5341 W. Bayberry Pkwy.
Mequon, WI Wisconsin 53092 / US
02 / JANKOVIC, Zeljko Radomir
2626 N Newhall Street
Milwaukee, WI Wisconsin 53211 / US
Representative(s)Grünecker Patent- und Rechtsanwälte PartG mbB
Leopoldstraße 4
80802 München / DE
[2017/49]
Application number, filing date17173261.329.05.2017
[2017/49]
Priority number, dateUS20161517138702.06.2016         Original published format: US201615171387
[2017/49]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3252938
Date:06.12.2017
Language:EN
[2017/49]
Type: B1 Patent specification 
No.:EP3252938
Date:13.05.2020
Language:EN
[2020/20]
Search report(s)(Supplementary) European search report - dispatched on:EP03.08.2017
ClassificationIPC:H02M1/36, H02M7/12, // H02M1/12, H02M5/458, H02M7/219
[2020/01]
CPC:
H02M7/125 (EP,US); H02M1/36 (EP,CN,US); H02M1/32 (CN);
H02M1/126 (EP,US); H02M5/458 (US); H02M5/4585 (EP,US);
H02M7/219 (EP,US) (-)
Former IPC [2017/49]H02M1/36, H02M7/12, H02H9/00
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/27]
Former [2017/49]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:VORLADUNGSVORRICHTUNG FÜR STROMUMWANDLUNGSSYSTEM[2017/49]
English:PRECHARGE APPARATUS FOR POWER CONVERSION SYSTEM[2017/49]
French:APPAREIL DE PRÉCHARGE POUR SYSTÈME DE CONVERSION DE PUISSANCE[2017/49]
Examination procedure29.05.2017Date on which the examining division has become responsible
24.05.2018Amendment by applicant (claims and/or description)
24.05.2018Examination requested  [2018/27]
09.07.2018Despatch of a communication from the examining division (Time limit: M04)
24.10.2018Reply to a communication from the examining division
18.12.2019Communication of intention to grant the patent
03.04.2020Fee for grant paid
03.04.2020Fee for publishing/printing paid
03.04.2020Receipt of the translation of the claim(s)
Opposition(s)16.02.2021No opposition filed within time limit [2021/16]
Fees paidRenewal fee
28.05.2019Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU29.05.2017
AL13.05.2020
AT13.05.2020
CY13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
MK13.05.2020
MT13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SI13.05.2020
SK13.05.2020
SM13.05.2020
TR13.05.2020
IE29.05.2020
LU29.05.2020
BE31.05.2020
CH31.05.2020
LI31.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
[2022/33]
Former [2022/27]HU29.05.2017
AL13.05.2020
AT13.05.2020
CY13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
MT13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SI13.05.2020
SK13.05.2020
SM13.05.2020
TR13.05.2020
IE29.05.2020
LU29.05.2020
BE31.05.2020
CH31.05.2020
LI31.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/24]AL13.05.2020
AT13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SI13.05.2020
SK13.05.2020
SM13.05.2020
IE29.05.2020
LU29.05.2020
BE31.05.2020
CH31.05.2020
LI31.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/20]AL13.05.2020
AT13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SK13.05.2020
SM13.05.2020
IE29.05.2020
LU29.05.2020
CH31.05.2020
LI31.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/15]AL13.05.2020
AT13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SK13.05.2020
SM13.05.2020
LU29.05.2020
CH31.05.2020
LI31.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/13]AL13.05.2020
AT13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SK13.05.2020
SM13.05.2020
CH31.05.2020
LI31.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/10]AL13.05.2020
AT13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SK13.05.2020
SM13.05.2020
CH31.05.2020
LI31.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/09]AL13.05.2020
AT13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
NL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SM13.05.2020
CH31.05.2020
LI31.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/08]AL13.05.2020
DK13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
NL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SM13.05.2020
CH31.05.2020
LI31.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/04]AL13.05.2020
FI13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
NL13.05.2020
RS13.05.2020
SE13.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/01]FI13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
RS13.05.2020
SE13.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2020/51]FI13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
RS13.05.2020
SE13.05.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2020/50]FI13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
SE13.05.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2020/48]FI13.05.2020
LT13.05.2020
SE13.05.2020
NO13.08.2020
IS13.09.2020
PT14.09.2020
Former [2020/47]LT13.05.2020
NO13.08.2020
IS13.09.2020
Former [2020/46]IS13.09.2020
Documents cited:Search[A]JPH07322484  (TOSHIBA CORP) [A] 1-15* abstract *;
 [Y]EP2200165  (DAIKIN IND LTD [JP]) [Y] 1-15 * paragraph [0025] * * paragraph [0064] * * paragraphs [0091] - [0099] * * paragraphs [0106] , [0107] * * figures 1,2,7,8,11 *;
 [A]WO2012097529  (CHANG ZHOU CURRENT SUPPLY COMPANY OF JIANGSU ELECTRIC POWER COMPANY [CN], et al) [A] 1-15 * abstract *;
 [Y]US2013076285  (CHOI JUNG MUK [KR], et al) [Y] 1-15 * paragraphs [0050] - [0053]; figure 3 *;
 [A]EP2660961  (ROCKWELL AUTOMATION TECH INC [US]) [A] 1-15 * paragraph [0013]; figures 1,1A,2 *;
 [T]  - LIXIANG WEI ET AL, "Single phase precharge control method for active front end rectifier", 2016 IEEE ENERGY CONVERSION CONGRESS AND EXPOSITION (ECCE), (20160901), doi:10.1109/ECCE.2016.7855436, ISBN 978-1-5090-0737-0, pages 1 - 6, XP055392206 [T] * the whole document *

DOI:   http://dx.doi.org/10.1109/ECCE.2016.7855436
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.