EP3261217 - ROTOR SYSTEM FOR AN ELECTRIC MACHINE, ELECTRICAL MACHINE COMPRISING THE ROTOR SYSTEM, AND A METHOD OF PRODUCING THE ROTOR SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 14.07.2023 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 05.08.2022 | ||
Former | Grant of patent is intended Status updated on 28.06.2022 | ||
Former | Examination is in progress Status updated on 28.02.2020 | ||
Former | Request for examination was made Status updated on 05.10.2018 | ||
Former | The application has been published Status updated on 24.11.2017 | Most recent event Tooltip | 26.01.2024 | Lapse of the patent in a contracting state New state(s): MC | published on 28.02.2024 [2024/09] | Applicant(s) | For all designated states Robert Bosch GmbH Postfach 30 02 20 70442 Stuttgart / DE | [2020/18] |
Former [2017/52] | For all designated states Robert Bosch GmbH P.O. Box 30 02 20 70442 Stuttgart / DE | Inventor(s) | 01 /
Derhardt, Steffen Jahnstr. 3/2 70839 Gerlingen / DE | 02 /
Paweletz, Anton Pecserstrasse 52 70736 Fellbach / DE | [2017/52] | Application number, filing date | 17175721.4 | 13.06.2017 | [2017/52] | Priority number, date | DE201610211253 | 23.06.2016 Original published format: DE102016211253 | [2017/52] | Filing language | DE | Procedural language | DE | Publication | Type: | A2 Application without search report | No.: | EP3261217 | Date: | 27.12.2017 | Language: | DE | [2017/52] | Type: | A3 Search report | No.: | EP3261217 | Date: | 28.03.2018 | Language: | DE | [2018/13] | Type: | B1 Patent specification | No.: | EP3261217 | Date: | 07.09.2022 | Language: | DE | [2022/36] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 22.02.2018 | Classification | IPC: | H02K1/27, H02K1/30, H02K7/00, // H02K15/03 | [2018/12] | CPC: |
H02K7/003 (EP);
H02K1/278 (EP,US);
H02K1/2733 (EP);
H02K1/30 (EP);
H02K15/03 (EP)
|
Former IPC [2017/52] | H02K1/17 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/45] |
Former [2017/52] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | ROTORSYSTEM FÜR EINE ELEKTRISCHE MASCHINE, ELEKTRISCHE MASCHINE MIT DEM ROTORSYSTEM UND HERSTELLUNGSVERFAHREN FÜR DAS ROTORSYSTEM | [2017/52] | English: | ROTOR SYSTEM FOR AN ELECTRIC MACHINE, ELECTRICAL MACHINE COMPRISING THE ROTOR SYSTEM, AND A METHOD OF PRODUCING THE ROTOR SYSTEM | [2017/52] | French: | SYSTÈME DE ROTOR POUR UNE MACHINE ÉLECTRIQUE, MACHINE ÉLECTRIQUE COMPRENANT LE SYSTÈME DE ROTOR ET PROCÉDÉ DE FABRICATION DU SYSTÈME DE ROTOR | [2017/52] | Examination procedure | 02.05.2018 | Amendment by applicant (claims and/or description) | 28.09.2018 | Examination requested [2018/45] | 28.09.2018 | Date on which the examining division has become responsible | 04.03.2020 | Despatch of a communication from the examining division (Time limit: M04) | 26.06.2020 | Reply to a communication from the examining division | 04.05.2022 | Date of oral proceedings | 20.05.2022 | Minutes of oral proceedings despatched | 29.06.2022 | Communication of intention to grant the patent | 01.08.2022 | Fee for grant paid | 01.08.2022 | Fee for publishing/printing paid | 01.08.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 08.06.2023 | No opposition filed within time limit [2023/33] | Fees paid | Renewal fee | 01.07.2019 | Renewal fee patent year 03 | 30.06.2020 | Renewal fee patent year 04 | 30.06.2021 | Renewal fee patent year 05 | 30.06.2022 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 07.09.2022 | CZ | 07.09.2022 | DK | 07.09.2022 | EE | 07.09.2022 | ES | 07.09.2022 | FI | 07.09.2022 | HR | 07.09.2022 | LT | 07.09.2022 | LV | 07.09.2022 | MC | 07.09.2022 | NL | 07.09.2022 | PL | 07.09.2022 | RO | 07.09.2022 | RS | 07.09.2022 | SE | 07.09.2022 | SI | 07.09.2022 | SK | 07.09.2022 | SM | 07.09.2022 | NO | 07.12.2022 | GR | 08.12.2022 | IS | 07.01.2023 | PT | 09.01.2023 | [2024/09] |
Former [2023/37] | AL | 07.09.2022 | |
CZ | 07.09.2022 | ||
DK | 07.09.2022 | ||
EE | 07.09.2022 | ||
ES | 07.09.2022 | ||
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
NL | 07.09.2022 | ||
PL | 07.09.2022 | ||
RO | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
SI | 07.09.2022 | ||
SK | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
IS | 07.01.2023 | ||
PT | 09.01.2023 | ||
Former [2023/34] | AL | 07.09.2022 | |
CZ | 07.09.2022 | ||
DK | 07.09.2022 | ||
EE | 07.09.2022 | ||
ES | 07.09.2022 | ||
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
NL | 07.09.2022 | ||
PL | 07.09.2022 | ||
RO | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
SK | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
IS | 07.01.2023 | ||
PT | 09.01.2023 | ||
Former [2023/30] | AL | 07.09.2022 | |
CZ | 07.09.2022 | ||
EE | 07.09.2022 | ||
ES | 07.09.2022 | ||
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
NL | 07.09.2022 | ||
PL | 07.09.2022 | ||
RO | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
SK | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
IS | 07.01.2023 | ||
PT | 09.01.2023 | ||
Former [2023/29] | AL | 07.09.2022 | |
CZ | 07.09.2022 | ||
EE | 07.09.2022 | ||
ES | 07.09.2022 | ||
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
PL | 07.09.2022 | ||
RO | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
SK | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
IS | 07.01.2023 | ||
PT | 09.01.2023 | ||
Former [2023/26] | CZ | 07.09.2022 | |
EE | 07.09.2022 | ||
ES | 07.09.2022 | ||
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
PL | 07.09.2022 | ||
RO | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
SK | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
IS | 07.01.2023 | ||
PT | 09.01.2023 | ||
Former [2023/23] | CZ | 07.09.2022 | |
EE | 07.09.2022 | ||
ES | 07.09.2022 | ||
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
RO | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
SK | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
PT | 09.01.2023 | ||
Former [2023/22] | CZ | 07.09.2022 | |
ES | 07.09.2022 | ||
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
RO | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
PT | 09.01.2023 | ||
Former [2023/20] | FI | 07.09.2022 | |
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
Former [2023/10] | FI | 07.09.2022 | |
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
Former [2023/09] | FI | 07.09.2022 | |
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
NO | 07.12.2022 | ||
Former [2023/08] | FI | 07.09.2022 | |
LT | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
NO | 07.12.2022 | Documents cited: | Search | [Y]EP0388147 (HITACHI LTD [JP], et al) [Y] 11* paragraph [0038]; figure 20 *; | [Y]WO2007072536 (HITACHI LTD [JP], et al) [Y] 2,11,13,14 * abstract *; | [XYI]EP2072826 (GRUNDFOS MANAGEMENT AS [DK]) [X] 1,3-6 * paragraph [0039]; figure 11 * [Y] 10,14 [I] 8,9; | [Y]US2013200735 (LYNCH JONATHAN A [US], et al) [Y] 7,10 * paragraph [0038]; figure 5B *; | [XY]WO2014080087 (SAIMAAN AMMATTIKORKEAKOULU OY [FI]) [X] 1,3-5 * page 5, line 26 - page 7, line 17; figure 1 * [Y] 2,7,11,13,14 | by applicant | US4433261 |