EP3266993 - A MOUNTING BRACKET [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 18.06.2021 Database last updated on 14.06.2024 | |
Former | The patent has been granted Status updated on 10.07.2020 | ||
Former | Grant of patent is intended Status updated on 21.04.2020 | ||
Former | Examination is in progress Status updated on 03.08.2018 | ||
Former | Request for examination was made Status updated on 20.07.2018 | ||
Former | The application has been published Status updated on 08.12.2017 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Rolls-Royce plc Kings Place 90 York Way London N1 9FX / GB | [2020/09] |
Former [2018/02] | For all designated states Rolls-Royce plc 62 Buckingham Gate London SW1E 6AT / GB | Inventor(s) | 01 /
Peace, Richard c/o Rolls-Royce plc PO Box 31 Derby, Derbyshire DE24 8BJ / GB | 02 /
Yang, Rong c/o Rolls-Royce plc PO Box 31 Derby, Derbyshire DE24 8BJ / GB | 03 /
Lee, Joshua c/o Rolls-Royce plc PO Box 31 Derby, Derbyshire DE24 8BJ / GB | 04 /
Kelly, Liam c/o Rolls-Royce plc PO Box 31 Derby, Derbyshire DE24 8BJ / GB | [2018/02] | Representative(s) | Rolls-Royce plc Moor Lane (ML-9) PO Box 31 Derby DE24 8BJ / GB | [N/P] |
Former [2018/02] | Rolls-Royce plc Intellectual Property Dept SinA-48 PO Box 31 Derby DE24 8BJ / GB | Application number, filing date | 17175986.3 | 14.06.2017 | [2018/02] | Priority number, date | GB20160011801 | 07.07.2016 Original published format: GB 201611801 | [2018/02] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3266993 | Date: | 10.01.2018 | Language: | EN | [2018/02] | Type: | B1 Patent specification | No.: | EP3266993 | Date: | 12.08.2020 | Language: | EN | [2020/33] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 29.11.2017 | Classification | IPC: | F01D25/28, F02C7/32 | [2018/02] | CPC: |
F02C7/32 (EP,US);
F01D25/24 (US);
F01D25/28 (EP,US);
F05D2220/32 (US);
F05D2230/30 (EP,US);
F05D2250/75 (US);
Y02T50/60 (EP,US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/34] |
Former [2018/02] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | MONTAGEKLAMMER | [2018/02] | English: | A MOUNTING BRACKET | [2018/02] | French: | SUPPORT DE MONTAGE | [2018/02] | Examination procedure | 14.06.2017 | Date on which the examining division has become responsible | 11.07.2018 | Examination requested [2018/34] | 07.08.2018 | Despatch of a communication from the examining division (Time limit: M04) | 06.12.2018 | Reply to a communication from the examining division | 22.04.2020 | Communication of intention to grant the patent | 01.07.2020 | Fee for grant paid | 01.07.2020 | Fee for publishing/printing paid | 01.07.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 14.05.2021 | No opposition filed within time limit [2021/29] | Request for further processing for: | The application is deemed to be withdrawn due to non-payment of the examination fee | 11.07.2018 | Request for further processing filed | 11.07.2018 | Full payment received (date of receipt of payment) Request granted | 26.07.2018 | Decision despatched | The application is deemed to be withdrawn due to non-payment of designation fees TR, SM, SK, SI, SE, RS, RO, PT, PL, NO, NL, MT, MK, MC, LV, LU, LT, IT, IS, IE, HU, HR, GR, GB, FR, FI, ES, EE, DK, DE, CZ, CY, CH, BG, BE, AT, AL | 11.07.2018 | Request for further processing filed | 11.07.2018 | Full payment received (date of receipt of payment) Request granted | 26.07.2018 | Decision despatched | Fees paid | Renewal fee | 27.06.2019 | Renewal fee patent year 03 | 25.06.2020 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 14.06.2017 | AL | 12.08.2020 | AT | 12.08.2020 | CY | 12.08.2020 | CZ | 12.08.2020 | DK | 12.08.2020 | EE | 12.08.2020 | ES | 12.08.2020 | FI | 12.08.2020 | HR | 12.08.2020 | IT | 12.08.2020 | LT | 12.08.2020 | LV | 12.08.2020 | MC | 12.08.2020 | MK | 12.08.2020 | NL | 12.08.2020 | PL | 12.08.2020 | RO | 12.08.2020 | RS | 12.08.2020 | SE | 12.08.2020 | SI | 12.08.2020 | SK | 12.08.2020 | SM | 12.08.2020 | TR | 12.08.2020 | BG | 12.11.2020 | NO | 12.11.2020 | GR | 13.11.2020 | IS | 12.12.2020 | PT | 14.12.2020 | [2024/29] |
Former [2024/22] | HU | 14.06.2017 | |
AL | 12.08.2020 | ||
AT | 12.08.2020 | ||
CY | 12.08.2020 | ||
CZ | 12.08.2020 | ||
DK | 12.08.2020 | ||
EE | 12.08.2020 | ||
ES | 12.08.2020 | ||
FI | 12.08.2020 | ||
HR | 12.08.2020 | ||
IT | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
MC | 12.08.2020 | ||
MK | 12.08.2020 | ||
NL | 12.08.2020 | ||
PL | 12.08.2020 | ||
RO | 12.08.2020 | ||
RS | 12.08.2020 | ||
SE | 12.08.2020 | ||
SI | 12.08.2020 | ||
SK | 12.08.2020 | ||
SM | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IS | 12.12.2020 | ||
PT | 14.12.2020 | ||
Former [2023/30] | HU | 14.06.2017 | |
AL | 12.08.2020 | ||
AT | 12.08.2020 | ||
CY | 12.08.2020 | ||
CZ | 12.08.2020 | ||
DK | 12.08.2020 | ||
EE | 12.08.2020 | ||
ES | 12.08.2020 | ||
FI | 12.08.2020 | ||
HR | 12.08.2020 | ||
IT | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
MC | 12.08.2020 | ||
NL | 12.08.2020 | ||
PL | 12.08.2020 | ||
RO | 12.08.2020 | ||
RS | 12.08.2020 | ||
SE | 12.08.2020 | ||
SI | 12.08.2020 | ||
SK | 12.08.2020 | ||
SM | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IS | 12.12.2020 | ||
PT | 14.12.2020 | ||
Former [2023/29] | HU | 14.06.2017 | |
AL | 12.08.2020 | ||
AT | 12.08.2020 | ||
CZ | 12.08.2020 | ||
DK | 12.08.2020 | ||
EE | 12.08.2020 | ||
ES | 12.08.2020 | ||
FI | 12.08.2020 | ||
HR | 12.08.2020 | ||
IT | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
MC | 12.08.2020 | ||
NL | 12.08.2020 | ||
PL | 12.08.2020 | ||
RO | 12.08.2020 | ||
RS | 12.08.2020 | ||
SE | 12.08.2020 | ||
SI | 12.08.2020 | ||
SK | 12.08.2020 | ||
SM | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IS | 12.12.2020 | ||
PT | 14.12.2020 | ||
Former [2023/20] | AL | 12.08.2020 | |
AT | 12.08.2020 | ||
CZ | 12.08.2020 | ||
DK | 12.08.2020 | ||
EE | 12.08.2020 | ||
ES | 12.08.2020 | ||
FI | 12.08.2020 | ||
HR | 12.08.2020 | ||
IT | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
MC | 12.08.2020 | ||
NL | 12.08.2020 | ||
PL | 12.08.2020 | ||
RO | 12.08.2020 | ||
RS | 12.08.2020 | ||
SE | 12.08.2020 | ||
SI | 12.08.2020 | ||
SK | 12.08.2020 | ||
SM | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IS | 12.12.2020 | ||
PT | 14.12.2020 | ||
Former [2022/08] | AL | 12.08.2020 | |
AT | 12.08.2020 | ||
CZ | 12.08.2020 | ||
DK | 12.08.2020 | ||
EE | 12.08.2020 | ||
ES | 12.08.2020 | ||
FI | 12.08.2020 | ||
HR | 12.08.2020 | ||
IT | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
MC | 12.08.2020 | ||
NL | 12.08.2020 | ||
PL | 12.08.2020 | ||
RO | 12.08.2020 | ||
RS | 12.08.2020 | ||
SE | 12.08.2020 | ||
SI | 12.08.2020 | ||
SK | 12.08.2020 | ||
SM | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IS | 12.12.2020 | ||
Former [2021/36] | AL | 12.08.2020 | |
AT | 12.08.2020 | ||
CZ | 12.08.2020 | ||
DK | 12.08.2020 | ||
EE | 12.08.2020 | ||
ES | 12.08.2020 | ||
FI | 12.08.2020 | ||
HR | 12.08.2020 | ||
IT | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
NL | 12.08.2020 | ||
PL | 12.08.2020 | ||
RO | 12.08.2020 | ||
RS | 12.08.2020 | ||
SE | 12.08.2020 | ||
SI | 12.08.2020 | ||
SK | 12.08.2020 | ||
SM | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IS | 12.12.2020 | ||
Former [2021/34] | AL | 12.08.2020 | |
AT | 12.08.2020 | ||
CZ | 12.08.2020 | ||
DK | 12.08.2020 | ||
EE | 12.08.2020 | ||
ES | 12.08.2020 | ||
FI | 12.08.2020 | ||
HR | 12.08.2020 | ||
IT | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
NL | 12.08.2020 | ||
PL | 12.08.2020 | ||
RO | 12.08.2020 | ||
RS | 12.08.2020 | ||
SE | 12.08.2020 | ||
SK | 12.08.2020 | ||
SM | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IS | 12.12.2020 | ||
Former [2021/28] | AL | 12.08.2020 | |
AT | 12.08.2020 | ||
CZ | 12.08.2020 | ||
DK | 12.08.2020 | ||
EE | 12.08.2020 | ||
ES | 12.08.2020 | ||
FI | 12.08.2020 | ||
HR | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
NL | 12.08.2020 | ||
PL | 12.08.2020 | ||
RO | 12.08.2020 | ||
RS | 12.08.2020 | ||
SE | 12.08.2020 | ||
SK | 12.08.2020 | ||
SM | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IS | 12.12.2020 | ||
Former [2021/25] | AL | 12.08.2020 | |
AT | 12.08.2020 | ||
CZ | 12.08.2020 | ||
DK | 12.08.2020 | ||
EE | 12.08.2020 | ||
ES | 12.08.2020 | ||
FI | 12.08.2020 | ||
HR | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
NL | 12.08.2020 | ||
PL | 12.08.2020 | ||
RO | 12.08.2020 | ||
RS | 12.08.2020 | ||
SE | 12.08.2020 | ||
SM | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IS | 12.12.2020 | ||
Former [2021/23] | AT | 12.08.2020 | |
CZ | 12.08.2020 | ||
DK | 12.08.2020 | ||
EE | 12.08.2020 | ||
FI | 12.08.2020 | ||
HR | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
NL | 12.08.2020 | ||
PL | 12.08.2020 | ||
RO | 12.08.2020 | ||
RS | 12.08.2020 | ||
SE | 12.08.2020 | ||
SM | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IS | 12.12.2020 | ||
Former [2021/22] | CZ | 12.08.2020 | |
DK | 12.08.2020 | ||
EE | 12.08.2020 | ||
FI | 12.08.2020 | ||
HR | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
NL | 12.08.2020 | ||
PL | 12.08.2020 | ||
RO | 12.08.2020 | ||
RS | 12.08.2020 | ||
SE | 12.08.2020 | ||
SM | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IS | 12.12.2020 | ||
Former [2021/21] | DK | 12.08.2020 | |
FI | 12.08.2020 | ||
HR | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
NL | 12.08.2020 | ||
PL | 12.08.2020 | ||
RS | 12.08.2020 | ||
SE | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IS | 12.12.2020 | ||
Former [2021/12] | FI | 12.08.2020 | |
HR | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
NL | 12.08.2020 | ||
PL | 12.08.2020 | ||
RS | 12.08.2020 | ||
SE | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IS | 12.12.2020 | ||
Former [2021/10] | FI | 12.08.2020 | |
HR | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
PL | 12.08.2020 | ||
RS | 12.08.2020 | ||
SE | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IS | 12.12.2020 | ||
Former [2021/09] | FI | 12.08.2020 | |
LT | 12.08.2020 | ||
SE | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
Former [2021/08] | FI | 12.08.2020 | |
LT | 12.08.2020 | ||
SE | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
Former [2021/07] | FI | 12.08.2020 | |
LT | 12.08.2020 | ||
NO | 12.11.2020 | Documents cited: | Search | [A]US2011002782 (BOUCHER BRICE [FR], et al) [A] 1-12* abstract *; | [A]US2012110821 (CALLAGHAN CRAIG M [US]) [A] 1-12 * paragraph [0020] - paragraph [0023]; figures 6,7 *; | [A]WO2015065525 (UNITED TECHNOLOGIES CORP [US]) [A] 1-12 * paragraph [0024] - paragraph [0025]; figures 6a,6c * | Examination | US2016169046 |