EP3258018 - FITTING BODY FOR A SANITARY FITTING, COMPRISING A CAP WITH A CAVITY [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.06.2022 Database last updated on 29.06.2024 | |
Former | The patent has been granted Status updated on 25.06.2021 | ||
Former | Grant of patent is intended Status updated on 15.03.2021 | ||
Former | Examination is in progress Status updated on 14.05.2019 | ||
Former | Request for examination was made Status updated on 29.06.2018 | ||
Former | The application has been published Status updated on 17.11.2017 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states Grohe AG Postfach 13 61 58653 Hemer / DE | [2021/21] |
Former [2017/51] | For all designated states Grohe AG 58675 Hemer / DE | Inventor(s) | 01 /
Loi, Thomas Worthstraße 39 58511 Lüdenscheid / DE | 02 /
Mainka, David Dahlbreite 20 58640 Iserlohn / DE | [2017/51] | Application number, filing date | 17176504.3 | 16.06.2017 | [2017/51] | Priority number, date | DE20161007359 | 17.06.2016 Original published format: DE102016007359 | [2017/51] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3258018 | Date: | 20.12.2017 | Language: | DE | [2017/51] | Type: | B1 Patent specification | No.: | EP3258018 | Date: | 28.07.2021 | Language: | DE | [2021/30] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 17.11.2017 | Classification | IPC: | E03C1/02, // E03B7/07 | [2021/14] | CPC: |
E03C1/02 (EP);
E03B7/075 (EP);
E03C2201/60 (EP)
|
Former IPC [2017/51] | E03C1/02 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/31] |
Former [2017/51] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | ARMATURENKÖRPER FÜR EINE SANITÄRARMATUR, AUFWEISEND EINEN DECKEL MIT EINEM HOHLRAUM | [2017/51] | English: | FITTING BODY FOR A SANITARY FITTING, COMPRISING A CAP WITH A CAVITY | [2017/51] | French: | CORPS DE ROBINETTERIE SANITAIRE PRÉSENTANT UN COUVERCLE DOTÉ D'UN ESPACE CREUX | [2017/51] | Examination procedure | 16.06.2017 | Date on which the examining division has become responsible | 20.06.2018 | Amendment by applicant (claims and/or description) | 20.06.2018 | Examination requested [2018/31] | 17.05.2019 | Despatch of a communication from the examining division (Time limit: M06) | 20.11.2019 | Reply to a communication from the examining division | 02.06.2020 | Despatch of a communication from the examining division (Time limit: M04) | 08.10.2020 | Reply to a communication from the examining division | 16.03.2021 | Communication of intention to grant the patent | 17.06.2021 | Fee for grant paid | 17.06.2021 | Fee for publishing/printing paid | 17.06.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 29.04.2022 | No opposition filed within time limit [2022/27] | Fees paid | Renewal fee | 25.06.2019 | Renewal fee patent year 03 | 24.06.2020 | Renewal fee patent year 04 | 22.06.2021 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 16.06.2017 | AL | 28.07.2021 | CY | 28.07.2021 | CZ | 28.07.2021 | DK | 28.07.2021 | EE | 28.07.2021 | FI | 28.07.2021 | HR | 28.07.2021 | IT | 28.07.2021 | LT | 28.07.2021 | LV | 28.07.2021 | MC | 28.07.2021 | MK | 28.07.2021 | NL | 28.07.2021 | PL | 28.07.2021 | RO | 28.07.2021 | RS | 28.07.2021 | SE | 28.07.2021 | SI | 28.07.2021 | SK | 28.07.2021 | SM | 28.07.2021 | BG | 28.10.2021 | NO | 28.10.2021 | GR | 29.10.2021 | IS | 28.11.2021 | PT | 29.11.2021 | [2024/22] |
Former [2024/20] | HU | 16.06.2017 | |
AL | 28.07.2021 | ||
CY | 28.07.2021 | ||
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
IT | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
MC | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
Former [2024/18] | HU | 16.06.2017 | |
AL | 28.07.2021 | ||
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
IT | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
MC | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
Former [2023/08] | AL | 28.07.2021 | |
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
IT | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
MC | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
Former [2022/36] | AL | 28.07.2021 | |
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
IT | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
Former [2022/29] | AL | 28.07.2021 | |
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
Former [2022/25] | CZ | 28.07.2021 | |
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
Former [2022/24] | CZ | 28.07.2021 | |
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SK | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
Former [2022/21] | DK | 28.07.2021 | |
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
Former [2022/11] | FI | 28.07.2021 | |
HR | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
Former [2022/09] | FI | 28.07.2021 | |
LT | 28.07.2021 | ||
NL | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
PT | 29.11.2021 | ||
Former [2022/08] | FI | 28.07.2021 | |
LT | 28.07.2021 | ||
NL | 28.07.2021 | ||
SE | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
Former [2022/07] | LT | 28.07.2021 | |
NL | 28.07.2021 | ||
NO | 28.10.2021 | Documents cited: | Search | [A]DE1824211U (CONCORDIA MASCH & ELEKT [DE]) [A] 1-10 * pages 1, 2; figure 1 *; | [A]US3422853 (SCHMID JOHN H) [A] 1-10 * figure 1 *; | [A]DE7515682U (IDEAL-STANDARD GMBH) [A] 1-10* figures 1-4 *; | [A]DE2613457 (HANSA METALLWERKE AG) [A] 1-10 * pages 2, 3; figure 1 *; | [X]DE7610076U (HANSA METALLWERKE AG) [X] 1-3,5,7,9,10 * pages 1-5; figures 1, 3 *; | [XI]DE3330963 (GROHE KG HANS [DE]) [X] 1-7,9,10 * pages 5-11; figure 1 * [I] 8; | [XI]DE4127629 (GROHE KG HANS [DE]) [X] 1,3,5-7,9,10 * columns 1-4; figures 1, 2 * [I] 4,8; | [XI]JPH08145271 (SUZUKI SOGYO KK) [X] 1-5,7,9,10 * pages 2-6; figures 1-7 * [I] 6,8; | [A]EP1006241 (HANSGROHE AG [DE]) [A] 1-10 * pages 2, 3; figures 1-3 *; | [XI]EP1172599 (SUZUKI SOGYO KK [JP]) [X] 1-5,7,9,10 * paragraphs [0076] - [0091]; figures 17, 18 * [I] 6,8; | [A]DE102004052359 (DAIMLER CHRYSLER AG [DE]) [A] 1-10 * figure 1 * |