blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3263856

EP3263856 - EXHAUST FLAP [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  04.02.2022
Database last updated on 03.08.2024
FormerThe patent has been granted
Status updated on  26.02.2021
FormerGrant of patent is intended
Status updated on  22.11.2020
FormerExamination is in progress
Status updated on  01.06.2018
FormerRequest for examination was made
Status updated on  20.04.2018
FormerThe application has been published
Status updated on  01.12.2017
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024  [2024/29]
Applicant(s)For all designated states
Eberspächer Exhaust Technology GmbH & Co. KG
Homburger Strasse 95
66539 Neunkirchen / DE
[2018/01]
Inventor(s)01 / Varelis, Stefanos
Dornbuschweg 22
70771 Leinfelden / DE
02 / Schmitt, Steffen
Reyherstraße 15
73760 Ostfildern / DE
 [2018/01]
Representative(s)Ruttensperger Lachnit Trossin Gomoll
Patent- und Rechtsanwälte
PartG mbB
Postfach 20 16 55
80016 München / DE
[2021/13]
Former [2018/01]RLTG
Ruttensperger Lachnit Trossin Gomoll
Patent- und Rechtsanwälte
Postfach 20 16 55
80016 München / DE
Application number, filing date17176528.219.06.2017
[2018/01]
Priority number, dateDE20161011168127.06.2016         Original published format: DE102016111681
[2018/01]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3263856
Date:03.01.2018
Language:DE
[2018/01]
Type: B1 Patent specification 
No.:EP3263856
Date:31.03.2021
Language:DE
[2021/13]
Search report(s)(Supplementary) European search report - dispatched on:EP17.10.2017
ClassificationIPC:F01N1/18, F02D9/10, F16K1/226, F02D9/04, // F16K1/22, F01N1/16, F02M26/70
[2020/47]
CPC:
F02D9/1045 (EP,US); F01N1/18 (EP,US); F02D9/04 (EP,US);
F02D9/1005 (EP,US); F02D9/107 (EP,US); F16K1/222 (EP,US);
F16K1/2263 (EP,US); F01N1/165 (EP,US); F01N1/166 (EP,US);
F01N2240/36 (EP,US); F02M26/70 (EP); F16K15/148 (US) (-)
Former IPC [2018/01]F01N1/18, F02D9/10, F16K1/226, // F16K1/22
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/21]
Former [2018/01]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:ABGASKLAPPE[2018/01]
English:EXHAUST FLAP[2018/01]
French:PAPILLON D'ÉCHAPPEMENT[2018/01]
Examination procedure19.06.2017Date on which the examining division has become responsible
11.04.2018Amendment by applicant (claims and/or description)
11.04.2018Examination requested  [2018/21]
31.05.2018Despatch of a communication from the examining division (Time limit: M04)
03.09.2018Reply to a communication from the examining division
27.02.2019Despatch of a communication from the examining division (Time limit: M04)
18.04.2019Reply to a communication from the examining division
17.02.2020Despatch of a communication from the examining division (Time limit: M04)
23.06.2020Reply to a communication from the examining division
23.11.2020Communication of intention to grant the patent
22.02.2021Fee for grant paid
22.02.2021Fee for publishing/printing paid
22.02.2021Receipt of the translation of the claim(s)
Opposition(s)04.01.2022No opposition filed within time limit [2022/10]
Fees paidRenewal fee
25.06.2019Renewal fee patent year 03
23.06.2020Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU19.06.2017
AL31.03.2021
CY31.03.2021
CZ31.03.2021
DK31.03.2021
EE31.03.2021
ES31.03.2021
FI31.03.2021
GR31.03.2021
HR31.03.2021
IT31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
MK31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SI31.03.2021
SK31.03.2021
SM31.03.2021
TR31.03.2021
IE19.06.2021
LU19.06.2021
BE30.06.2021
BG30.06.2021
CH30.06.2021
LI30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
[2024/29]
Former [2024/22]HU19.06.2017
AL31.03.2021
CY31.03.2021
CZ31.03.2021
DK31.03.2021
EE31.03.2021
ES31.03.2021
FI31.03.2021
GR31.03.2021
HR31.03.2021
IT31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
MK31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SI31.03.2021
SK31.03.2021
SM31.03.2021
IE19.06.2021
LU19.06.2021
BE30.06.2021
BG30.06.2021
CH30.06.2021
LI30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
Former [2023/36]HU19.06.2017
AL31.03.2021
CY31.03.2021
CZ31.03.2021
DK31.03.2021
EE31.03.2021
ES31.03.2021
FI31.03.2021
GR31.03.2021
HR31.03.2021
IT31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SI31.03.2021
SK31.03.2021
SM31.03.2021
IE19.06.2021
LU19.06.2021
BE30.06.2021
BG30.06.2021
CH30.06.2021
LI30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
Former [2023/30]HU19.06.2017
AL31.03.2021
CY31.03.2021
CZ31.03.2021
DK31.03.2021
EE31.03.2021
ES31.03.2021
FI31.03.2021
HR31.03.2021
IT31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SI31.03.2021
SK31.03.2021
SM31.03.2021
IE19.06.2021
LU19.06.2021
BE30.06.2021
BG30.06.2021
CH30.06.2021
LI30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
Former [2023/29]HU19.06.2017
AL31.03.2021
CZ31.03.2021
DK31.03.2021
EE31.03.2021
ES31.03.2021
FI31.03.2021
HR31.03.2021
IT31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SI31.03.2021
SK31.03.2021
SM31.03.2021
IE19.06.2021
LU19.06.2021
BE30.06.2021
BG30.06.2021
CH30.06.2021
LI30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
Former [2022/36]AL31.03.2021
CZ31.03.2021
DK31.03.2021
EE31.03.2021
ES31.03.2021
FI31.03.2021
HR31.03.2021
IT31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SI31.03.2021
SK31.03.2021
SM31.03.2021
IE19.06.2021
LU19.06.2021
BE30.06.2021
BG30.06.2021
CH30.06.2021
LI30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
Former [2022/34]AL31.03.2021
CZ31.03.2021
DK31.03.2021
EE31.03.2021
ES31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SI31.03.2021
SK31.03.2021
SM31.03.2021
IE19.06.2021
LU19.06.2021
BE30.06.2021
BG30.06.2021
CH30.06.2021
LI30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
Former [2022/29]AL31.03.2021
CZ31.03.2021
DK31.03.2021
EE31.03.2021
ES31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SI31.03.2021
SK31.03.2021
SM31.03.2021
IE19.06.2021
LU19.06.2021
BG30.06.2021
CH30.06.2021
LI30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
Former [2022/23]AL31.03.2021
CZ31.03.2021
DK31.03.2021
EE31.03.2021
ES31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SK31.03.2021
SM31.03.2021
IE19.06.2021
LU19.06.2021
BG30.06.2021
CH30.06.2021
LI30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
Former [2022/21]AL31.03.2021
CZ31.03.2021
DK31.03.2021
EE31.03.2021
ES31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SK31.03.2021
SM31.03.2021
IE19.06.2021
LU19.06.2021
BG30.06.2021
CH30.06.2021
LI30.06.2021
NO30.06.2021
PT02.08.2021
IS24.12.2021
Former [2022/18]AL31.03.2021
CZ31.03.2021
DK31.03.2021
EE31.03.2021
ES31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SK31.03.2021
SM31.03.2021
LU19.06.2021
BG30.06.2021
NO30.06.2021
PT02.08.2021
IS24.12.2021
Former [2022/10]AL31.03.2021
CZ31.03.2021
DK31.03.2021
EE31.03.2021
ES31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SK31.03.2021
SM31.03.2021
BG30.06.2021
NO30.06.2021
PT02.08.2021
IS24.12.2021
Former [2022/08]AL31.03.2021
CZ31.03.2021
DK31.03.2021
EE31.03.2021
ES31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SK31.03.2021
SM31.03.2021
BG30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
Former [2022/07]AL31.03.2021
CZ31.03.2021
EE31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SK31.03.2021
SM31.03.2021
BG30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
Former [2021/52]CZ31.03.2021
EE31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SK31.03.2021
SM31.03.2021
BG30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
Former [2021/51]CZ31.03.2021
EE31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
NL31.03.2021
RO31.03.2021
RS31.03.2021
SK31.03.2021
SM31.03.2021
BG30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
Former [2021/50]CZ31.03.2021
EE31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
NL31.03.2021
RO31.03.2021
RS31.03.2021
SK31.03.2021
SM31.03.2021
BG30.06.2021
NO30.06.2021
PT02.08.2021
Former [2021/48]CZ31.03.2021
EE31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
NL31.03.2021
RS31.03.2021
SM31.03.2021
BG30.06.2021
NO30.06.2021
Former [2021/47]FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
NL31.03.2021
RS31.03.2021
SM31.03.2021
BG30.06.2021
NO30.06.2021
Former [2021/46]FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
RS31.03.2021
SM31.03.2021
BG30.06.2021
NO30.06.2021
Former [2021/37]FI31.03.2021
HR31.03.2021
LV31.03.2021
RS31.03.2021
BG30.06.2021
NO30.06.2021
Former [2021/36]FI31.03.2021
HR31.03.2021
BG30.06.2021
NO30.06.2021
Former [2021/35]FI31.03.2021
HR31.03.2021
NO30.06.2021
Former [2021/33]FI31.03.2021
NO30.06.2021
Documents cited:Search[A]FR1150573  (TAILLEFERRE HENRI) [A] 5-10 * figures 1-5 * * page 1 - page 2 *;
 [A]US4032108  (KINTNER EDWIN K) [A] 5-10 * abstract * * figures 1, 2 ** column 1 - column 2 *;
 [X]DE102008034341  (BAYERISCHE MOTOREN WERKE AG [DE], et al) [X] 1-13 * abstract * * figures 1-10 * * paragraph [0001] - paragraph [0004] * * paragraph [0017] * * paragraph [0064] - paragraph [0074] *;
 [X]DE112010005713T  (MITSUBISHI ELECTRIC CORP [JP]) [X] 1-4,11-13 * abstract * * figures 1-4 * * paragraph [0019] - paragraph [0039] *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.