EP3421895 - AIR PREPARATION DEVICE FOR USE IN AN AIR FLOW PATH OF AN AIR-CONDITIONING SYSTEM IN A MOBILE DEVICE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 24.09.2021 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 16.10.2020 | ||
Former | Grant of patent is intended Status updated on 28.06.2020 | ||
Former | Request for examination was made Status updated on 25.01.2019 | ||
Former | The application has been published Status updated on 30.11.2018 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Carl Freudenberg KG Höhnerweg 2-4 69469 Weinheim / DE | [2019/01] | Inventor(s) | 01 /
Stahl, Ulrich Heppenheimer Str. 33 69514 Laudenbach / DE | 02 /
Bräunling, Volker Siegfriedstraße 97 64646 Heppenheim / DE | [2019/01] | Application number, filing date | 17177848.3 | 26.06.2017 | [2019/01] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3421895 | Date: | 02.01.2019 | Language: | DE | [2019/01] | Type: | B1 Patent specification | No.: | EP3421895 | Date: | 18.11.2020 | Language: | DE | [2020/47] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 19.12.2017 | Classification | IPC: | F24F3/12, B60H3/00, F24F3/16 | [2020/29] | CPC: |
B60H3/0021 (EP,US);
B60H3/0028 (CN,KR,US);
A61L9/012 (KR);
A61L9/03 (KR);
B01D39/14 (KR);
B01D46/42 (KR);
F24F3/12 (EP,US);
F24F8/50 (EP,US);
A61L2209/134 (KR);
A61L2209/16 (KR);
B60H2003/0042 (EP,KR,US);
B60H2003/005 (CN,KR);
B60H2003/0064 (CN)
(-)
|
Former IPC [2019/01] | F24F3/12, B60H3/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/09] |
Former [2019/01] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | LUFTAUFBEREITUNGSEINRICHTUNG ZUM EINSATZ IN EINEM LUFTSTRÖMUNGSPFAD EINES KLIMATISIERUNGSSYSTEMS IN EINER MOBILEN EINRICHTUNG | [2019/01] | English: | AIR PREPARATION DEVICE FOR USE IN AN AIR FLOW PATH OF AN AIR-CONDITIONING SYSTEM IN A MOBILE DEVICE | [2019/01] | French: | DISPOSITIF DE PRÉPARATION D'AIR DESTINÉ À ÊTRE UTILISÉ DANS UN CHEMIN D'ÉCOULEMENT D'AIR D'UN SYSTÈME DE CLIMATISATION DANS UN DISPOSITIF MOBILE | [2019/01] | Examination procedure | 17.01.2019 | Amendment by applicant (claims and/or description) | 17.01.2019 | Examination requested [2019/09] | 17.01.2019 | Date on which the examining division has become responsible | 29.06.2020 | Communication of intention to grant the patent | 08.10.2020 | Fee for grant paid | 08.10.2020 | Fee for publishing/printing paid | 08.10.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 19.08.2021 | No opposition filed within time limit [2021/43] | Fees paid | Renewal fee | 21.06.2019 | Renewal fee patent year 03 | 31.03.2020 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 26.06.2017 | AL | 18.11.2020 | CY | 18.11.2020 | CZ | 18.11.2020 | DK | 18.11.2020 | EE | 18.11.2020 | ES | 18.11.2020 | FI | 18.11.2020 | HR | 18.11.2020 | IT | 18.11.2020 | LT | 18.11.2020 | LV | 18.11.2020 | MC | 18.11.2020 | MK | 18.11.2020 | MT | 18.11.2020 | NL | 18.11.2020 | PL | 18.11.2020 | RO | 18.11.2020 | RS | 18.11.2020 | SE | 18.11.2020 | SI | 18.11.2020 | SK | 18.11.2020 | SM | 18.11.2020 | BG | 18.02.2021 | NO | 18.02.2021 | GR | 19.02.2021 | IS | 18.03.2021 | PT | 18.03.2021 | GB | 26.06.2021 | IE | 26.06.2021 | LU | 26.06.2021 | BE | 30.06.2021 | CH | 30.06.2021 | FR | 30.06.2021 | LI | 30.06.2021 | [2024/42] |
Former [2024/22] | HU | 26.06.2017 | |
AL | 18.11.2020 | ||
CY | 18.11.2020 | ||
CZ | 18.11.2020 | ||
DK | 18.11.2020 | ||
EE | 18.11.2020 | ||
ES | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
IT | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
MC | 18.11.2020 | ||
MK | 18.11.2020 | ||
NL | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
SI | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
GB | 26.06.2021 | ||
IE | 26.06.2021 | ||
LU | 26.06.2021 | ||
BE | 30.06.2021 | ||
CH | 30.06.2021 | ||
FR | 30.06.2021 | ||
LI | 30.06.2021 | ||
Former [2023/33] | HU | 26.06.2017 | |
AL | 18.11.2020 | ||
CY | 18.11.2020 | ||
CZ | 18.11.2020 | ||
DK | 18.11.2020 | ||
EE | 18.11.2020 | ||
ES | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
IT | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
MC | 18.11.2020 | ||
NL | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
SI | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
GB | 26.06.2021 | ||
IE | 26.06.2021 | ||
LU | 26.06.2021 | ||
BE | 30.06.2021 | ||
CH | 30.06.2021 | ||
FR | 30.06.2021 | ||
LI | 30.06.2021 | ||
Former [2023/30] | AL | 18.11.2020 | |
CY | 18.11.2020 | ||
CZ | 18.11.2020 | ||
DK | 18.11.2020 | ||
EE | 18.11.2020 | ||
ES | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
IT | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
MC | 18.11.2020 | ||
NL | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
SI | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
GB | 26.06.2021 | ||
IE | 26.06.2021 | ||
LU | 26.06.2021 | ||
BE | 30.06.2021 | ||
CH | 30.06.2021 | ||
FR | 30.06.2021 | ||
LI | 30.06.2021 | ||
Former [2022/34] | AL | 18.11.2020 | |
CZ | 18.11.2020 | ||
DK | 18.11.2020 | ||
EE | 18.11.2020 | ||
ES | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
IT | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
MC | 18.11.2020 | ||
NL | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
SI | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
GB | 26.06.2021 | ||
IE | 26.06.2021 | ||
LU | 26.06.2021 | ||
BE | 30.06.2021 | ||
CH | 30.06.2021 | ||
FR | 30.06.2021 | ||
LI | 30.06.2021 | ||
Former [2022/23] | AL | 18.11.2020 | |
CZ | 18.11.2020 | ||
DK | 18.11.2020 | ||
EE | 18.11.2020 | ||
ES | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
IT | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
MC | 18.11.2020 | ||
NL | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
SI | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
GB | 26.06.2021 | ||
IE | 26.06.2021 | ||
LU | 26.06.2021 | ||
CH | 30.06.2021 | ||
FR | 30.06.2021 | ||
LI | 30.06.2021 | ||
Former [2022/22] | AL | 18.11.2020 | |
CZ | 18.11.2020 | ||
DK | 18.11.2020 | ||
EE | 18.11.2020 | ||
ES | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
IT | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
MC | 18.11.2020 | ||
NL | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
SI | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
PT | 18.03.2021 | ||
GB | 26.06.2021 | ||
IE | 26.06.2021 | ||
LU | 26.06.2021 | ||
CH | 30.06.2021 | ||
LI | 30.06.2021 | ||
Former [2022/21] | AL | 18.11.2020 | |
CZ | 18.11.2020 | ||
DK | 18.11.2020 | ||
EE | 18.11.2020 | ||
ES | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
IT | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
MC | 18.11.2020 | ||
NL | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
SI | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
PT | 18.03.2021 | ||
IE | 26.06.2021 | ||
LU | 26.06.2021 | ||
CH | 30.06.2021 | ||
LI | 30.06.2021 | ||
Former [2022/18] | AL | 18.11.2020 | |
CZ | 18.11.2020 | ||
DK | 18.11.2020 | ||
EE | 18.11.2020 | ||
ES | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
IT | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
MC | 18.11.2020 | ||
NL | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
SI | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
PT | 18.03.2021 | ||
LU | 26.06.2021 | ||
Former [2022/10] | AL | 18.11.2020 | |
CZ | 18.11.2020 | ||
DK | 18.11.2020 | ||
EE | 18.11.2020 | ||
ES | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
IT | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
MC | 18.11.2020 | ||
NL | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
SI | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
PT | 18.03.2021 | ||
Former [2022/08] | AL | 18.11.2020 | |
CZ | 18.11.2020 | ||
DK | 18.11.2020 | ||
EE | 18.11.2020 | ||
ES | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
IT | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
MC | 18.11.2020 | ||
NL | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
SI | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2021/50] | AL | 18.11.2020 | |
CZ | 18.11.2020 | ||
DK | 18.11.2020 | ||
EE | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
IT | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
NL | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
SI | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2021/48] | AL | 18.11.2020 | |
CZ | 18.11.2020 | ||
DK | 18.11.2020 | ||
EE | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
IT | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
NL | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2021/46] | AL | 18.11.2020 | |
CZ | 18.11.2020 | ||
DK | 18.11.2020 | ||
EE | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
NL | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2021/45] | AL | 18.11.2020 | |
CZ | 18.11.2020 | ||
DK | 18.11.2020 | ||
EE | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2021/37] | CZ | 18.11.2020 | |
DK | 18.11.2020 | ||
EE | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2021/36] | CZ | 18.11.2020 | |
EE | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2021/35] | CZ | 18.11.2020 | |
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2021/33] | FI | 18.11.2020 | |
HR | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
PL | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2021/32] | FI | 18.11.2020 | |
HR | 18.11.2020 | ||
LV | 18.11.2020 | ||
PL | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2021/28] | FI | 18.11.2020 | |
HR | 18.11.2020 | ||
LV | 18.11.2020 | ||
PL | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2021/25] | FI | 18.11.2020 | |
LV | 18.11.2020 | ||
PL | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2021/24] | FI | 18.11.2020 | |
LV | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
PT | 18.03.2021 | ||
Former [2021/23] | FI | 18.11.2020 | |
LV | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
PT | 18.03.2021 | ||
Former [2021/22] | FI | 18.11.2020 | |
RS | 18.11.2020 | ||
NO | 18.02.2021 | ||
PT | 18.03.2021 | ||
Former [2021/21] | FI | 18.11.2020 | |
PT | 18.03.2021 | ||
Former [2021/20] | FI | 18.11.2020 | Documents cited: | Search | [XI]EP0645148 (DUDLEY IND LTD [GB]) [X] 1 * the whole document * [I] 2-10; | [XI]EP0720925 (SUPAIR AG [CH]) [X] 1,2,4,9,10 * column 2, line 32 - column 4, line 9; figures 1-6 * [I] 3,5-8; | [A]US2006005711 (OLEFSON ANDREW [US]) [A] 6,7 * paragraphs [0019] - [0039]; figures 1,3,4a,4b *; | [A]DE102007044978 (BEHR GMBH & CO KG [DE]) [A] 8* abstract *; | [XI]DE102009058111 (DAIMLER AG [DE]) [X] 1,5,9,10 * paragraphs [0021] - [0032]; figures 1,4,5 * [I] 2-4,6-8; | [A]DE102013015649 (MANN & HUMMEL GMBH [DE]) [A] 2,3 * paragraphs [0036] - [0044]; figures 1,2,3 * |