EP3421844 - PLANETARY GEARING CARRIER ASSEMBLY, VERTICAL MILL GEAR AND VERTICAL MILL [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 02.07.2021 Database last updated on 28.05.2024 | |
Former | The patent has been granted Status updated on 24.07.2020 | ||
Former | Grant of patent is intended Status updated on 27.04.2020 | ||
Former | Request for examination was made Status updated on 05.07.2019 | ||
Former | The application has been published Status updated on 30.11.2018 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states Flender GmbH Alfred-Flender-Straße 77 46395 Bocholt / DE | [N/P] |
Former [2019/07] | For all designated states Flender GmbH Alfred-Flender-Strasse 77 46395 Bocholt / DE | ||
Former [2019/01] | For all designated states Siemens Aktiengesellschaft Werner-von-Siemens-Straße 1 80333 München / DE | Inventor(s) | 01 /
Becka, Simon Kaupenstraße 10 45128 Essen / DE | 02 /
Brun, Steffen Realschulstraße 8a 46325 Borken / DE | 03 /
Friedrich, Matthias In den Gärten 50 46395 Bocholt / DE | 04 /
Josten, Guido Böwings Stegge 30 46395 Bocholt / DE | 05 /
Messink, Christoph Vehnsweg 12a 46399 Bocholt / DE | 06 /
Prusak, Robert Neustr. 28 45891 Gelsenkirchen / DE | 07 /
Schlegel, Eugen Ziegelstr. 4 46117 Oberhausen / DE | 08 /
Schmeink, Franz In Bollwerks Busch 33 A 46395 Bocholt / DE | 09 /
Schroer, Dirk Münsterstr. 43 46414 Rhede / DE | 10 /
Tegelkamp, Michael Vehnsweg 5 46399 Bocholt / DE | [2019/01] | Representative(s) | Michalski Hüttermann & Partner Patentanwälte mbB Kaistraße 16A 40221 Düsseldorf / DE | [N/P] |
Former [2020/35] | Maier, Daniel Oliver Siemens AG Postfach 22 16 34 80506 München / DE | Application number, filing date | 17179080.1 | 30.06.2017 | [2019/01] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3421844 | Date: | 02.01.2019 | Language: | DE | [2019/01] | Type: | B1 Patent specification | No.: | EP3421844 | Date: | 26.08.2020 | Language: | DE | [2020/35] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 11.12.2017 | Classification | IPC: | F16H57/08, B02C15/00 | [2019/01] | CPC: |
F16H57/082 (EP,US);
F16H1/32 (CN);
B02C15/006 (EP,US);
B02C15/007 (US);
F16C19/38 (US);
F16C23/086 (EP,US);
F16H1/46 (US);
F16H37/041 (US);
F16H57/021 (CN);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/32] |
Former [2019/01] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | PLANETENRADTRÄGERANORDNUNG, VERTIKALMÜHLENGETRIEBE UND VERTIKALMÜHLE | [2019/01] | English: | PLANETARY GEARING CARRIER ASSEMBLY, VERTICAL MILL GEAR AND VERTICAL MILL | [2019/01] | French: | SYSTÈME DE SUPPORT DE ROUE SATELLITE, ENGRENAGE DE BROYEUR VERTICAL ET BROYEUR VERTICAL | [2019/01] | Examination procedure | 27.06.2019 | Amendment by applicant (claims and/or description) | 01.07.2019 | Examination requested [2019/32] | 01.07.2019 | Date on which the examining division has become responsible | 28.04.2020 | Communication of intention to grant the patent | 15.07.2020 | Receipt of the translation of the claim(s) | 16.07.2020 | Fee for grant paid | 16.07.2020 | Fee for publishing/printing paid | Opposition(s) | 27.05.2021 | No opposition filed within time limit [2021/31] | Fees paid | Renewal fee | 17.06.2019 | Renewal fee patent year 03 | 19.06.2020 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 30.06.2017 | AL | 26.08.2020 | CY | 26.08.2020 | CZ | 26.08.2020 | DK | 26.08.2020 | EE | 26.08.2020 | HR | 26.08.2020 | LT | 26.08.2020 | LV | 26.08.2020 | MC | 26.08.2020 | MK | 26.08.2020 | NL | 26.08.2020 | PL | 26.08.2020 | RO | 26.08.2020 | RS | 26.08.2020 | SE | 26.08.2020 | SI | 26.08.2020 | SK | 26.08.2020 | SM | 26.08.2020 | BG | 26.11.2020 | NO | 26.11.2020 | GR | 27.11.2020 | IS | 26.12.2020 | PT | 28.12.2020 | [2024/22] |
Former [2023/33] | HU | 30.06.2017 | |
AL | 26.08.2020 | ||
CY | 26.08.2020 | ||
CZ | 26.08.2020 | ||
DK | 26.08.2020 | ||
EE | 26.08.2020 | ||
HR | 26.08.2020 | ||
LT | 26.08.2020 | ||
LV | 26.08.2020 | ||
MC | 26.08.2020 | ||
NL | 26.08.2020 | ||
PL | 26.08.2020 | ||
RO | 26.08.2020 | ||
RS | 26.08.2020 | ||
SE | 26.08.2020 | ||
SI | 26.08.2020 | ||
SK | 26.08.2020 | ||
SM | 26.08.2020 | ||
BG | 26.11.2020 | ||
NO | 26.11.2020 | ||
GR | 27.11.2020 | ||
IS | 26.12.2020 | ||
PT | 28.12.2020 | ||
Former [2023/30] | AL | 26.08.2020 | |
CY | 26.08.2020 | ||
CZ | 26.08.2020 | ||
DK | 26.08.2020 | ||
EE | 26.08.2020 | ||
HR | 26.08.2020 | ||
LT | 26.08.2020 | ||
LV | 26.08.2020 | ||
MC | 26.08.2020 | ||
NL | 26.08.2020 | ||
PL | 26.08.2020 | ||
RO | 26.08.2020 | ||
RS | 26.08.2020 | ||
SE | 26.08.2020 | ||
SI | 26.08.2020 | ||
SK | 26.08.2020 | ||
SM | 26.08.2020 | ||
BG | 26.11.2020 | ||
NO | 26.11.2020 | ||
GR | 27.11.2020 | ||
IS | 26.12.2020 | ||
PT | 28.12.2020 | ||
Former [2022/08] | AL | 26.08.2020 | |
CZ | 26.08.2020 | ||
DK | 26.08.2020 | ||
EE | 26.08.2020 | ||
HR | 26.08.2020 | ||
LT | 26.08.2020 | ||
LV | 26.08.2020 | ||
MC | 26.08.2020 | ||
NL | 26.08.2020 | ||
PL | 26.08.2020 | ||
RO | 26.08.2020 | ||
RS | 26.08.2020 | ||
SE | 26.08.2020 | ||
SI | 26.08.2020 | ||
SK | 26.08.2020 | ||
SM | 26.08.2020 | ||
BG | 26.11.2020 | ||
NO | 26.11.2020 | ||
GR | 27.11.2020 | ||
IS | 26.12.2020 | ||
PT | 28.12.2020 | ||
Former [2021/36] | AL | 26.08.2020 | |
CZ | 26.08.2020 | ||
DK | 26.08.2020 | ||
EE | 26.08.2020 | ||
HR | 26.08.2020 | ||
LT | 26.08.2020 | ||
LV | 26.08.2020 | ||
NL | 26.08.2020 | ||
PL | 26.08.2020 | ||
RO | 26.08.2020 | ||
RS | 26.08.2020 | ||
SE | 26.08.2020 | ||
SI | 26.08.2020 | ||
SK | 26.08.2020 | ||
SM | 26.08.2020 | ||
BG | 26.11.2020 | ||
NO | 26.11.2020 | ||
GR | 27.11.2020 | ||
IS | 26.12.2020 | ||
PT | 28.12.2020 | ||
Former [2021/28] | AL | 26.08.2020 | |
CZ | 26.08.2020 | ||
DK | 26.08.2020 | ||
EE | 26.08.2020 | ||
HR | 26.08.2020 | ||
LT | 26.08.2020 | ||
LV | 26.08.2020 | ||
NL | 26.08.2020 | ||
PL | 26.08.2020 | ||
RO | 26.08.2020 | ||
RS | 26.08.2020 | ||
SE | 26.08.2020 | ||
SK | 26.08.2020 | ||
SM | 26.08.2020 | ||
BG | 26.11.2020 | ||
NO | 26.11.2020 | ||
GR | 27.11.2020 | ||
IS | 26.12.2020 | ||
PT | 28.12.2020 | ||
Former [2021/25] | AL | 26.08.2020 | |
CZ | 26.08.2020 | ||
DK | 26.08.2020 | ||
EE | 26.08.2020 | ||
HR | 26.08.2020 | ||
LT | 26.08.2020 | ||
LV | 26.08.2020 | ||
NL | 26.08.2020 | ||
PL | 26.08.2020 | ||
RO | 26.08.2020 | ||
RS | 26.08.2020 | ||
SE | 26.08.2020 | ||
SM | 26.08.2020 | ||
BG | 26.11.2020 | ||
NO | 26.11.2020 | ||
GR | 27.11.2020 | ||
IS | 26.12.2020 | ||
PT | 28.12.2020 | ||
Former [2021/22] | CZ | 26.08.2020 | |
DK | 26.08.2020 | ||
EE | 26.08.2020 | ||
HR | 26.08.2020 | ||
LT | 26.08.2020 | ||
LV | 26.08.2020 | ||
NL | 26.08.2020 | ||
PL | 26.08.2020 | ||
RO | 26.08.2020 | ||
RS | 26.08.2020 | ||
SE | 26.08.2020 | ||
SM | 26.08.2020 | ||
BG | 26.11.2020 | ||
NO | 26.11.2020 | ||
GR | 27.11.2020 | ||
IS | 26.12.2020 | ||
PT | 28.12.2020 | ||
Former [2021/21] | DK | 26.08.2020 | |
HR | 26.08.2020 | ||
LT | 26.08.2020 | ||
LV | 26.08.2020 | ||
NL | 26.08.2020 | ||
PL | 26.08.2020 | ||
RS | 26.08.2020 | ||
SE | 26.08.2020 | ||
BG | 26.11.2020 | ||
NO | 26.11.2020 | ||
GR | 27.11.2020 | ||
IS | 26.12.2020 | ||
PT | 28.12.2020 | ||
Former [2021/12] | HR | 26.08.2020 | |
LT | 26.08.2020 | ||
LV | 26.08.2020 | ||
NL | 26.08.2020 | ||
PL | 26.08.2020 | ||
RS | 26.08.2020 | ||
SE | 26.08.2020 | ||
BG | 26.11.2020 | ||
NO | 26.11.2020 | ||
GR | 27.11.2020 | ||
IS | 26.12.2020 | ||
PT | 28.12.2020 | ||
Former [2021/10] | HR | 26.08.2020 | |
LT | 26.08.2020 | ||
LV | 26.08.2020 | ||
PL | 26.08.2020 | ||
RS | 26.08.2020 | ||
SE | 26.08.2020 | ||
BG | 26.11.2020 | ||
NO | 26.11.2020 | ||
GR | 27.11.2020 | ||
IS | 26.12.2020 | ||
PT | 28.12.2020 | ||
Former [2021/09] | LT | 26.08.2020 | |
SE | 26.08.2020 | ||
BG | 26.11.2020 | ||
NO | 26.11.2020 | ||
GR | 27.11.2020 | ||
PT | 28.12.2020 | ||
Former [2021/07] | LT | 26.08.2020 | |
NO | 26.11.2020 | Documents cited: | Search | [A]US5616098 (KATAYAMA MASANORI [JP], et al) [A] 1-13* the whole document *; | [XY]DE102010028028 (ZAHNRADFABRIK FRIEDRICHSHAFEN [DE]) [X] 1,4,8,9 * paragraph [0013]; figure 1 * [Y] 10-13; | [AD]EP2816246 (SKF AB [SE]) [AD] 1-13 * the whole document *; | [YD]DE102013212464 (SIEMENS AG [DE]) [YD] 10-13 * figure 1 * | by applicant | EP2816246 | DE102013212464 | EP20170176001 |