EP3267462 - INTERCONNECT MODULE OF A CIRCUIT BREAKER AND OF A CONTACTOR FOR AN ELECTRICAL ASSEMBLY [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 15.10.2021 Database last updated on 15.06.2024 | |
Former | The patent has been granted Status updated on 06.11.2020 | ||
Former | Grant of patent is intended Status updated on 06.07.2020 | ||
Former | Request for examination was made Status updated on 29.06.2018 | ||
Former | The application has been published Status updated on 08.12.2017 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states Schneider Electric Industries SAS 35, rue Joseph Monier 92500 Rueil-Malmaison / FR | [2018/02] | Inventor(s) | 01 /
COMTOIS, Patrick SCHNEIDER ELECTRIC INDUSTRIES SAS World Trade Center 38EE1 5 Place Robert Schuman 38050 Grenoble Cedex 09 / FR | 02 /
BAURAND, Gilles SCHNEIDER ELECTRIC INDUSTRIES SAS World Trade Center 38EE1 5 Place Robert Schuman 38050 Grenoble Cedex 09 / FR | [2018/02] | Representative(s) | Lavoix 62, rue de Bonnel 69448 Lyon Cedex 03 / FR | [2018/02] | Application number, filing date | 17180204.4 | 07.07.2017 | [2018/02] | Priority number, date | FR20160056573 | 08.07.2016 Original published format: FR 1656573 | [2018/02] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | EP3267462 | Date: | 10.01.2018 | Language: | FR | [2018/02] | Type: | B1 Patent specification | No.: | EP3267462 | Date: | 09.12.2020 | Language: | FR | [2020/50] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 13.09.2017 | Classification | IPC: | H01H89/06, G01R15/16 | [2018/02] | CPC: |
H01H89/06 (EP,US);
H05K5/0017 (US);
G01R15/16 (US);
G05B15/02 (US);
H01H2089/065 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/31] |
Former [2018/02] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VERBINDUNGSMODUL EINES SCHUTZSCHALTERS UND EINES KONTAKTSCHALTERS FÜR EINE ELEKTRISCHE EINHEIT | [2018/02] | English: | INTERCONNECT MODULE OF A CIRCUIT BREAKER AND OF A CONTACTOR FOR AN ELECTRICAL ASSEMBLY | [2018/02] | French: | MODULE D'INTERCONNEXION D'UN DISJONCTEUR ET D'UN CONTACTEUR POUR UN ENSEMBLE ÉLECTRIQUE | [2018/02] | Examination procedure | 07.07.2017 | Date on which the examining division has become responsible | 26.06.2018 | Examination requested [2018/31] | 09.07.2018 | Amendment by applicant (claims and/or description) | 07.07.2020 | Communication of intention to grant the patent | 27.10.2020 | Fee for grant paid | 27.10.2020 | Fee for publishing/printing paid | 27.10.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 10.09.2021 | No opposition filed within time limit [2021/46] | Fees paid | Renewal fee | 26.07.2019 | Renewal fee patent year 03 | 28.07.2020 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 07.07.2017 | AL | 09.12.2020 | AT | 09.12.2020 | CY | 09.12.2020 | CZ | 09.12.2020 | DK | 09.12.2020 | EE | 09.12.2020 | FI | 09.12.2020 | HR | 09.12.2020 | LT | 09.12.2020 | LV | 09.12.2020 | MC | 09.12.2020 | MK | 09.12.2020 | NL | 09.12.2020 | PL | 09.12.2020 | RO | 09.12.2020 | RS | 09.12.2020 | SE | 09.12.2020 | SI | 09.12.2020 | SK | 09.12.2020 | SM | 09.12.2020 | BG | 09.03.2021 | NO | 09.03.2021 | GR | 10.03.2021 | IS | 09.04.2021 | PT | 09.04.2021 | IE | 07.07.2021 | LU | 07.07.2021 | BE | 31.07.2021 | CH | 31.07.2021 | LI | 31.07.2021 | [2024/22] |
Former [2023/30] | HU | 07.07.2017 | |
AL | 09.12.2020 | ||
AT | 09.12.2020 | ||
CY | 09.12.2020 | ||
CZ | 09.12.2020 | ||
DK | 09.12.2020 | ||
EE | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
MC | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SI | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
IS | 09.04.2021 | ||
PT | 09.04.2021 | ||
IE | 07.07.2021 | ||
LU | 07.07.2021 | ||
BE | 31.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
Former [2023/29] | HU | 07.07.2017 | |
AL | 09.12.2020 | ||
AT | 09.12.2020 | ||
CZ | 09.12.2020 | ||
DK | 09.12.2020 | ||
EE | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
MC | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SI | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
IS | 09.04.2021 | ||
PT | 09.04.2021 | ||
IE | 07.07.2021 | ||
LU | 07.07.2021 | ||
BE | 31.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
Former [2022/35] | AL | 09.12.2020 | |
AT | 09.12.2020 | ||
CZ | 09.12.2020 | ||
DK | 09.12.2020 | ||
EE | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
MC | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SI | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
IS | 09.04.2021 | ||
PT | 09.04.2021 | ||
IE | 07.07.2021 | ||
LU | 07.07.2021 | ||
BE | 31.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
Former [2022/34] | AL | 09.12.2020 | |
AT | 09.12.2020 | ||
CZ | 09.12.2020 | ||
DK | 09.12.2020 | ||
EE | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
MC | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SI | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
IS | 09.04.2021 | ||
PT | 09.04.2021 | ||
LU | 07.07.2021 | ||
BE | 31.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
Former [2022/23] | AL | 09.12.2020 | |
AT | 09.12.2020 | ||
CZ | 09.12.2020 | ||
DK | 09.12.2020 | ||
EE | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
MC | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SI | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
IS | 09.04.2021 | ||
PT | 09.04.2021 | ||
LU | 07.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
Former [2022/21] | AL | 09.12.2020 | |
AT | 09.12.2020 | ||
CZ | 09.12.2020 | ||
DK | 09.12.2020 | ||
EE | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
MC | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SI | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
PT | 09.04.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
Former [2022/18] | AL | 09.12.2020 | |
AT | 09.12.2020 | ||
CZ | 09.12.2020 | ||
DK | 09.12.2020 | ||
EE | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
MC | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SI | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
PT | 09.04.2021 | ||
Former [2022/10] | AL | 09.12.2020 | |
AT | 09.12.2020 | ||
CZ | 09.12.2020 | ||
DK | 09.12.2020 | ||
EE | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SI | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
PT | 09.04.2021 | ||
Former [2021/49] | AL | 09.12.2020 | |
AT | 09.12.2020 | ||
CZ | 09.12.2020 | ||
DK | 09.12.2020 | ||
EE | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SI | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
IS | 09.04.2021 | ||
PT | 09.04.2021 | ||
Former [2021/45] | AL | 09.12.2020 | |
AT | 09.12.2020 | ||
CZ | 09.12.2020 | ||
EE | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
IS | 09.04.2021 | ||
PT | 09.04.2021 | ||
Former [2021/42] | AT | 09.12.2020 | |
CZ | 09.12.2020 | ||
EE | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
IS | 09.04.2021 | ||
PT | 09.04.2021 | ||
Former [2021/39] | AT | 09.12.2020 | |
CZ | 09.12.2020 | ||
EE | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
PT | 09.04.2021 | ||
Former [2021/37] | AT | 09.12.2020 | |
CZ | 09.12.2020 | ||
EE | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
PT | 09.04.2021 | ||
Former [2021/36] | CZ | 09.12.2020 | |
EE | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
PT | 09.04.2021 | ||
Former [2021/35] | CZ | 09.12.2020 | |
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
PT | 09.04.2021 | ||
Former [2021/34] | CZ | 09.12.2020 | |
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
PT | 09.04.2021 | ||
Former [2021/33] | FI | 09.12.2020 | |
HR | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
PT | 09.04.2021 | ||
Former [2021/32] | FI | 09.12.2020 | |
HR | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
Former [2021/30] | FI | 09.12.2020 | |
HR | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
Former [2021/28] | FI | 09.12.2020 | |
HR | 09.12.2020 | ||
LV | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
Former [2021/23] | FI | 09.12.2020 | |
LV | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
Former [2021/22] | FI | 09.12.2020 | |
RS | 09.12.2020 | ||
NO | 09.03.2021 | ||
Former [2021/20] | FI | 09.12.2020 | Documents cited: | Search | [A]DE4335965 (LICENTIA GMBH [DE]) [A] 1-8 * figure 3 *; | [Y]DE10023966 (SIEMENS AG [DE]) [Y] 1-8 * abstract * * claim 1 * * paragraph [0001] * * paragraph [0007] - paragraph [0015] *; | [Y]US2004246661 (BUSCH KLAUS [DE], et al) [Y] 1-8 * figure 1 * * paragraph [0022] *; | [Y]US2005122117 (BAURAND GILLES [FR], et al) [Y] 1-8 * figure 1 * * paragraph [0022] *; | [Y]US2013229192 (BEHRINGER KLAUS [DE], et al) [Y] 1-8 * figures 1-4 * * paragraph [0002] * * paragraph [0017] * * paragraph [0023] * * paragraph [0081] *; | [Y]US2014124262 (MARTIN WILLIAM H [US], et al) [Y] 3,7 * figures 1,2,27-35 * * paragraph [0061] * * paragraph [0082] *; | [A]FR3026488 (SCHNEIDER ELECTRIC IND SAS [FR]) [A] 1* figure 1 * |