EP3435705 - COMMUNICATION RELAY AND METHOD FOR REDIRECTING DATA PACKETS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 04.02.2022 Database last updated on 24.07.2024 | |
Former | The patent has been granted Status updated on 26.02.2021 | ||
Former | Grant of patent is intended Status updated on 28.10.2020 | ||
Former | Examination is in progress Status updated on 18.09.2020 | ||
Former | Grant of patent is intended Status updated on 16.06.2020 | ||
Former | Examination is in progress Status updated on 24.08.2018 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states NTT DoCoMo, Inc. 11-1, Nagatacho 2-chome Chiyoda-ku Tokyo 100-6150 / JP | [2019/05] | Inventor(s) | 01 /
MUTIKAINEN, Jari c/o DOCOMO Communications Laboratories Europe GmbH Landsberger Strasse 312 80687 Munich / DE | 02 /
GUERZONI, Riccardo c/o DOCOMO Communications Laboratories Europe GmbH Landsberger Strasse 312 80687 Munich / DE | 03 /
ALI, Irfan 2585 Park Blvd. Apt Z208 Palo Alto, CA 94306 / US | [2019/05] | Representative(s) | Viering, Jentschura & Partner mbB Patent- und Rechtsanwälte Am Brauhaus 8 01099 Dresden / DE | [2019/05] | Application number, filing date | 17183238.9 | 26.07.2017 | [2019/05] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3435705 | Date: | 30.01.2019 | Language: | EN | [2019/05] | Type: | B1 Patent specification | No.: | EP3435705 | Date: | 31.03.2021 | Language: | EN | [2021/13] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 30.10.2017 | Classification | IPC: | H04W40/36, // H04W36/02 | [2019/05] | CPC: |
H04W36/023 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/05] | Title | German: | KOMMUNIKATIONSRELAIS UND VERFAHREN ZUR UMLEITUNG VON DATENPAKETEN | [2019/05] | English: | COMMUNICATION RELAY AND METHOD FOR REDIRECTING DATA PACKETS | [2019/05] | French: | RELAIS DE COMMUNICATION ET PROCÉDÉ DE REDIRECTION DE PAQUETS DE DONNÉES | [2019/05] | Examination procedure | 25.01.2018 | Amendment by applicant (claims and/or description) | 25.01.2018 | Examination requested [2019/05] | 25.01.2018 | Date on which the examining division has become responsible | 14.08.2018 | Despatch of a communication from the examining division (Time limit: M02) | 25.09.2018 | Reply to a communication from the examining division | 17.06.2020 | Communication of intention to grant the patent | 18.09.2020 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 29.10.2020 | Communication of intention to grant the patent | 19.02.2021 | Fee for grant paid | 19.02.2021 | Fee for publishing/printing paid | 19.02.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 04.01.2022 | No opposition filed within time limit [2022/10] | Fees paid | Renewal fee | 30.07.2019 | Renewal fee patent year 03 | 23.06.2020 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 26.07.2017 | AL | 31.03.2021 | AT | 31.03.2021 | CY | 31.03.2021 | CZ | 31.03.2021 | DK | 31.03.2021 | EE | 31.03.2021 | ES | 31.03.2021 | FI | 31.03.2021 | GR | 31.03.2021 | HR | 31.03.2021 | IT | 31.03.2021 | LT | 31.03.2021 | LV | 31.03.2021 | MC | 31.03.2021 | MK | 31.03.2021 | NL | 31.03.2021 | PL | 31.03.2021 | RO | 31.03.2021 | RS | 31.03.2021 | SE | 31.03.2021 | SI | 31.03.2021 | SK | 31.03.2021 | SM | 31.03.2021 | BG | 30.06.2021 | NO | 30.06.2021 | GB | 26.07.2021 | IE | 26.07.2021 | LU | 26.07.2021 | BE | 31.07.2021 | CH | 31.07.2021 | FR | 31.07.2021 | IS | 31.07.2021 | LI | 31.07.2021 | PT | 02.08.2021 | [2024/22] |
Former [2023/36] | HU | 26.07.2017 | |
AL | 31.03.2021 | ||
AT | 31.03.2021 | ||
CY | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
GR | 31.03.2021 | ||
HR | 31.03.2021 | ||
IT | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
MC | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SI | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
GB | 26.07.2021 | ||
IE | 26.07.2021 | ||
LU | 26.07.2021 | ||
BE | 31.07.2021 | ||
CH | 31.07.2021 | ||
FR | 31.07.2021 | ||
IS | 31.07.2021 | ||
LI | 31.07.2021 | ||
PT | 02.08.2021 | ||
Former [2023/33] | HU | 26.07.2017 | |
AL | 31.03.2021 | ||
AT | 31.03.2021 | ||
CY | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
IT | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
MC | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SI | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
GB | 26.07.2021 | ||
IE | 26.07.2021 | ||
LU | 26.07.2021 | ||
BE | 31.07.2021 | ||
CH | 31.07.2021 | ||
FR | 31.07.2021 | ||
IS | 31.07.2021 | ||
LI | 31.07.2021 | ||
PT | 02.08.2021 | ||
Former [2023/30] | AL | 31.03.2021 | |
AT | 31.03.2021 | ||
CY | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
IT | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
MC | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SI | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
GB | 26.07.2021 | ||
IE | 26.07.2021 | ||
LU | 26.07.2021 | ||
BE | 31.07.2021 | ||
CH | 31.07.2021 | ||
FR | 31.07.2021 | ||
IS | 31.07.2021 | ||
LI | 31.07.2021 | ||
PT | 02.08.2021 | ||
Former [2022/36] | AL | 31.03.2021 | |
AT | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
IT | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
MC | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SI | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
GB | 26.07.2021 | ||
IE | 26.07.2021 | ||
LU | 26.07.2021 | ||
BE | 31.07.2021 | ||
CH | 31.07.2021 | ||
FR | 31.07.2021 | ||
IS | 31.07.2021 | ||
LI | 31.07.2021 | ||
PT | 02.08.2021 | ||
Former [2022/35] | AL | 31.03.2021 | |
AT | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
MC | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SI | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
GB | 26.07.2021 | ||
IE | 26.07.2021 | ||
LU | 26.07.2021 | ||
BE | 31.07.2021 | ||
CH | 31.07.2021 | ||
FR | 31.07.2021 | ||
IS | 31.07.2021 | ||
LI | 31.07.2021 | ||
PT | 02.08.2021 | ||
Former [2022/34] | AL | 31.03.2021 | |
AT | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
MC | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SI | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
GB | 26.07.2021 | ||
LU | 26.07.2021 | ||
BE | 31.07.2021 | ||
CH | 31.07.2021 | ||
FR | 31.07.2021 | ||
IS | 31.07.2021 | ||
LI | 31.07.2021 | ||
PT | 02.08.2021 | ||
Former [2022/29] | AL | 31.03.2021 | |
AT | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
MC | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SI | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
GB | 26.07.2021 | ||
LU | 26.07.2021 | ||
CH | 31.07.2021 | ||
FR | 31.07.2021 | ||
IS | 31.07.2021 | ||
LI | 31.07.2021 | ||
PT | 02.08.2021 | ||
Former [2022/23] | AL | 31.03.2021 | |
AT | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
MC | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
GB | 26.07.2021 | ||
LU | 26.07.2021 | ||
CH | 31.07.2021 | ||
FR | 31.07.2021 | ||
IS | 31.07.2021 | ||
LI | 31.07.2021 | ||
PT | 02.08.2021 | ||
Former [2022/22] | AL | 31.03.2021 | |
AT | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
MC | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
GB | 26.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
PT | 02.08.2021 | ||
IS | 24.12.2021 | ||
Former [2022/21] | AL | 31.03.2021 | |
AT | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
MC | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
PT | 02.08.2021 | ||
IS | 24.12.2021 | ||
Former [2022/18] | AL | 31.03.2021 | |
AT | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
MC | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
PT | 02.08.2021 | ||
IS | 24.12.2021 | ||
Former [2022/10] | AL | 31.03.2021 | |
AT | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
PT | 02.08.2021 | ||
IS | 24.12.2021 | ||
Former [2022/08] | AL | 31.03.2021 | |
AT | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
IS | 31.07.2021 | ||
PT | 02.08.2021 | ||
Former [2022/07] | AL | 31.03.2021 | |
AT | 31.03.2021 | ||
CZ | 31.03.2021 | ||
EE | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
IS | 31.07.2021 | ||
PT | 02.08.2021 | ||
Former [2021/52] | AT | 31.03.2021 | |
CZ | 31.03.2021 | ||
EE | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
IS | 31.07.2021 | ||
PT | 02.08.2021 | ||
Former [2021/51] | AT | 31.03.2021 | |
CZ | 31.03.2021 | ||
EE | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
NL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
IS | 31.07.2021 | ||
PT | 02.08.2021 | ||
Former [2021/50] | AT | 31.03.2021 | |
CZ | 31.03.2021 | ||
EE | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
NL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
PT | 02.08.2021 | ||
Former [2021/48] | AT | 31.03.2021 | |
CZ | 31.03.2021 | ||
EE | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
NL | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
Former [2021/47] | AT | 31.03.2021 | |
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
NL | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
Former [2021/46] | AT | 31.03.2021 | |
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
Former [2021/38] | FI | 31.03.2021 | |
HR | 31.03.2021 | ||
LV | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
Former [2021/37] | FI | 31.03.2021 | |
HR | 31.03.2021 | ||
LV | 31.03.2021 | ||
RS | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
Former [2021/36] | FI | 31.03.2021 | |
HR | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
Former [2021/35] | FI | 31.03.2021 | |
HR | 31.03.2021 | ||
NO | 30.06.2021 | ||
Former [2021/33] | FI | 31.03.2021 | |
NO | 30.06.2021 | Documents cited: | Search | [A]EP2375815 (MITSUBISHI ELEC R&D CT EUROPE [NL], et al); | [I]US8406764 (BENNETT ANTHONY D [US], et al); |