blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3279533

EP3279533 - A CONTROL SYSTEM FOR A PRESSURISED GAS PATH [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  28.05.2021
Database last updated on 24.04.2024
FormerRequest for examination was made
Status updated on  03.08.2018
FormerThe application has been published
Status updated on  05.01.2018
Most recent event   Tooltip28.05.2021Application deemed to be withdrawnpublished on 30.06.2021  [2021/26]
Applicant(s)For all designated states
Linde GmbH
Dr.-Carl-von-Linde-Straße 6-14
82049 Pullach / DE
[2020/25]
Former [2018/06]For all designated states
Linde Aktiengesellschaft
Klosterhofstrasse 1
80331 München / DE
Inventor(s)01 / COWLES, Christopher John
49 Parkstead Road
London SW15 5AN / GB
 [2018/06]
Representative(s)(deleted)
[N/P]
Former [2018/06]Christie, Gemma Louise
The Linde Group
Intellectual Property
10 Priestley Road The Surrey Research Park
Guildford, Surrey GU2 7XY / GB
Application number, filing date17184061.431.07.2017
[2018/06]
Priority number, dateGB2016001324201.08.2016         Original published format: GB 201613242
[2018/06]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3279533
Date:07.02.2018
Language:EN
[2018/06]
Search report(s)(Supplementary) European search report - dispatched on:EP27.10.2017
ClassificationIPC:F16K31/00, F17C13/04
[2018/06]
CPC:
F17C13/04 (EP,GB); F17C2205/0323 (EP); F17C2205/0329 (GB);
F17C2205/0338 (EP,GB); F17C2205/035 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/36]
Former [2018/06]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:STEUERUNGSSYSTEM FÜR EINEN PFAD EINES DRUCKBEAUFSCHLAGTEN GASES[2018/06]
English:A CONTROL SYSTEM FOR A PRESSURISED GAS PATH[2018/06]
French:SYSTÈME DE COMMANDE POUR TRAJET DE GAZ SOUS PRESSION[2018/06]
Examination procedure31.07.2017Date on which the examining division has become responsible
30.07.2018Examination requested  [2018/36]
15.11.2018Amendment by applicant (claims and/or description)
02.02.2021Application deemed to be withdrawn, date of legal effect  [2021/26]
23.02.2021Despatch of communication that the application is deemed to be withdrawn, reason: renewal fee not paid in time  [2021/26]
Request for further processing for:The application is deemed to be withdrawn due to failure to reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report/Supplementary European search report
15.11.2018Request for further processing filed
15.11.2018Full payment received (date of receipt of payment)
Request granted
27.11.2018Decision despatched
Fees paidRenewal fee
22.07.2019Renewal fee patent year 03
Penalty fee
Additional fee for renewal fee
31.07.202004   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[XA]US3053498  (DUMM ROBERT P) [X] 1,2,4,6 * figures 1-4 * * column 1, line 8 - column 3, line 28 * [A] 3,5,7-9;
 [XA]US6328280  (DAVIDSON GILBERT [US]) [X] 1,3,9 * figures 1-10 * * column 1, line 52 - column 2, line 36 * * column 3, line 22 - column 5, line 55 * [A] 2,4-8;
 [XA]US7584936  (LEWIS JEFF [US], et al) [X] 1,5,7,8 * figures 1-3 * * column 1, line 5 - column 1, line 21 * * column 1, line 54 - column 2, line 5 * * column 2, lines 55-67 * * column 5, lines 5-21 * * column 6, lines 50-59 * [A] 2-4,6,9;
 [X]WO8503754  (WILLIAMS WILLIAM J, et al) [X] 1 * the whole document *;
 [X]US6681949  (TIBOR KENNETH R [US]) [X] 1 * the whole document *;
 [X]US8262059  (DOLENTI WILLIAM T [US], et al) [X] 1 * the whole document *;
 [X]US2608377  (WALTER STREUN) [X] 1 * the whole document *;
 [X]US5295907  (AKKERMAN NEIL H [US]) [X] 1 * the whole document *;
 [X]USH636H  (THE UNITED STATES OF AMERICA AS REPRESENTED BY DEPT. OF ENERGY) [X] 1 * the whole document *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.