blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3305053

EP3305053 - METHOD AND SYSTEM FOR DETERMINING AN OPERATING POINT [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  18.02.2022
Database last updated on 28.06.2024
FormerThe patent has been granted
Status updated on  12.03.2021
FormerGrant of patent is intended
Status updated on  30.11.2020
FormerExamination is in progress
Status updated on  31.03.2020
FormerRequest for examination was made
Status updated on  18.01.2019
FormerThe application has been published
Status updated on  09.03.2018
Most recent event   Tooltip27.04.2024Lapse of the patent in a contracting state
New state(s): MK
published on 29.05.2024  [2024/22]
Applicant(s)For all designated states
CLAAS Tractor S.A.S.
7, Rue Dewoitine
78141 Vélizy-Villacoublay Cedex / FR
[2018/15]
Inventor(s)01 / Wieckhorst, Jan Carsten
Grünebaumstraße 20
33098 Paderborn / DE
02 / Ehlert, Christian
Müllerweg 26
33719 Bielefeld / DE
 [2018/15]
Representative(s)CLAAS Gruppe
Mühlenwinkel 1
33428 Harsewinkel / DE
[2021/15]
Former [2018/15]Budach, Steffen
CLAAS KGaA mbH
Mühlenwinkel 1
33428 Harsewinkel / DE
Application number, filing date17185536.409.08.2017
[2018/15]
Priority number, dateDE20161011829728.09.2016         Original published format: DE102016118297
[2018/15]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3305053
Date:11.04.2018
Language:DE
[2018/15]
Type: B1 Patent specification 
No.:EP3305053
Date:14.04.2021
Language:DE
[2021/15]
Search report(s)(Supplementary) European search report - dispatched on:EP13.03.2018
ClassificationIPC:A01B63/112, A01B69/00
[2020/50]
CPC:
A01B69/007 (EP,US); A01B63/00 (RU,US); A01B63/112 (EP,US);
A01B69/00 (RU); A01B79/00 (RU); A01B79/005 (US);
B60W30/182 (RU) (-)
Former IPC [2018/15]A01B63/112
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/47]
Former [2018/15]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:VERFAHREN UND SYSTEM ZUR BESTIMMUNG EINES BETRIEBSPUNKTES[2018/15]
English:METHOD AND SYSTEM FOR DETERMINING AN OPERATING POINT[2018/15]
French:PROCÉDÉ ET SYSTÈME DE DÉTERMINATION D'UN POINT DE FONCTIONNEMENT[2018/15]
Examination procedure20.09.2018Amendment by applicant (claims and/or description)
15.10.2018Examination requested  [2019/08]
15.10.2018Date on which the examining division has become responsible
25.10.2018Despatch of communication that the application is deemed to be withdrawn, reason: examination fee not paid in time
03.04.2020Despatch of a communication from the examining division (Time limit: M04)
26.06.2020Reply to a communication from the examining division
01.12.2020Communication of intention to grant the patent
02.03.2021Fee for grant paid
02.03.2021Fee for publishing/printing paid
02.03.2021Receipt of the translation of the claim(s)
Opposition(s)17.01.2022No opposition filed within time limit [2022/12]
Request for further processing for:The application is deemed to be withdrawn due to non-payment of the examination fee
04.01.2019Request for further processing filed
04.01.2019Full payment received (date of receipt of payment)
Request granted
23.01.2019Decision despatched
Fees paidRenewal fee
02.09.2019Renewal fee patent year 03
31.08.2020Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU09.08.2017
AL14.04.2021
CY14.04.2021
CZ14.04.2021
DK14.04.2021
EE14.04.2021
ES14.04.2021
FI14.04.2021
HR14.04.2021
IT14.04.2021
LT14.04.2021
LV14.04.2021
MC14.04.2021
MK14.04.2021
NL14.04.2021
PL14.04.2021
RO14.04.2021
RS14.04.2021
SE14.04.2021
SI14.04.2021
SK14.04.2021
SM14.04.2021
BG14.07.2021
NO14.07.2021
GR15.07.2021
GB09.08.2021
IE09.08.2021
LU09.08.2021
IS14.08.2021
PT16.08.2021
CH31.08.2021
LI31.08.2021
[2024/22]
Former [2023/30]HU09.08.2017
AL14.04.2021
CY14.04.2021
CZ14.04.2021
DK14.04.2021
EE14.04.2021
ES14.04.2021
FI14.04.2021
HR14.04.2021
IT14.04.2021
LT14.04.2021
LV14.04.2021
MC14.04.2021
NL14.04.2021
PL14.04.2021
RO14.04.2021
RS14.04.2021
SE14.04.2021
SI14.04.2021
SK14.04.2021
SM14.04.2021
BG14.07.2021
NO14.07.2021
GR15.07.2021
GB09.08.2021
IE09.08.2021
LU09.08.2021
IS14.08.2021
PT16.08.2021
CH31.08.2021
LI31.08.2021
Former [2023/27]HU09.08.2017
AL14.04.2021
CZ14.04.2021
DK14.04.2021
EE14.04.2021
ES14.04.2021
FI14.04.2021
HR14.04.2021
IT14.04.2021
LT14.04.2021
LV14.04.2021
MC14.04.2021
NL14.04.2021
PL14.04.2021
RO14.04.2021
RS14.04.2021
SE14.04.2021
SI14.04.2021
SK14.04.2021
SM14.04.2021
BG14.07.2021
NO14.07.2021
GR15.07.2021
GB09.08.2021
IE09.08.2021
LU09.08.2021
IS14.08.2021
PT16.08.2021
CH31.08.2021
LI31.08.2021
Former [2022/36]AL14.04.2021
CZ14.04.2021
DK14.04.2021
EE14.04.2021
ES14.04.2021
FI14.04.2021
HR14.04.2021
IT14.04.2021
LT14.04.2021
LV14.04.2021
MC14.04.2021
NL14.04.2021
PL14.04.2021
RO14.04.2021
RS14.04.2021
SE14.04.2021
SI14.04.2021
SK14.04.2021
SM14.04.2021
BG14.07.2021
NO14.07.2021
GR15.07.2021
GB09.08.2021
IE09.08.2021
LU09.08.2021
IS14.08.2021
PT16.08.2021
CH31.08.2021
LI31.08.2021
Former [2022/35]AL14.04.2021
CZ14.04.2021
DK14.04.2021
EE14.04.2021
ES14.04.2021
FI14.04.2021
HR14.04.2021
LT14.04.2021
LV14.04.2021
MC14.04.2021
NL14.04.2021
PL14.04.2021
RO14.04.2021
RS14.04.2021
SE14.04.2021
SI14.04.2021
SK14.04.2021
SM14.04.2021
BG14.07.2021
NO14.07.2021
GR15.07.2021
GB09.08.2021
IE09.08.2021
LU09.08.2021
IS14.08.2021
PT16.08.2021
CH31.08.2021
LI31.08.2021
Former [2022/29]AL14.04.2021
CZ14.04.2021
DK14.04.2021
EE14.04.2021
ES14.04.2021
FI14.04.2021
HR14.04.2021
LT14.04.2021
LV14.04.2021
MC14.04.2021
NL14.04.2021
PL14.04.2021
RO14.04.2021
RS14.04.2021
SE14.04.2021
SI14.04.2021
SK14.04.2021
SM14.04.2021
BG14.07.2021
NO14.07.2021
GR15.07.2021
LU09.08.2021
IS14.08.2021
PT16.08.2021
CH31.08.2021
LI31.08.2021
Former [2022/26]AL14.04.2021
CZ14.04.2021
DK14.04.2021
EE14.04.2021
ES14.04.2021
FI14.04.2021
HR14.04.2021
LT14.04.2021
LV14.04.2021
MC14.04.2021
NL14.04.2021
PL14.04.2021
RO14.04.2021
RS14.04.2021
SE14.04.2021
SK14.04.2021
SM14.04.2021
BG14.07.2021
NO14.07.2021
GR15.07.2021
LU09.08.2021
IS14.08.2021
PT16.08.2021
CH31.08.2021
LI31.08.2021
Former [2022/23]CZ14.04.2021
DK14.04.2021
EE14.04.2021
ES14.04.2021
FI14.04.2021
HR14.04.2021
LT14.04.2021
LV14.04.2021
MC14.04.2021
NL14.04.2021
PL14.04.2021
RO14.04.2021
RS14.04.2021
SE14.04.2021
SK14.04.2021
SM14.04.2021
BG14.07.2021
NO14.07.2021
GR15.07.2021
LU09.08.2021
IS14.08.2021
PT16.08.2021
CH31.08.2021
LI31.08.2021
Former [2022/21]CZ14.04.2021
DK14.04.2021
EE14.04.2021
ES14.04.2021
FI14.04.2021
HR14.04.2021
LT14.04.2021
LV14.04.2021
MC14.04.2021
NL14.04.2021
PL14.04.2021
RO14.04.2021
RS14.04.2021
SE14.04.2021
SK14.04.2021
SM14.04.2021
BG14.07.2021
NO14.07.2021
GR15.07.2021
PT16.08.2021
CH31.08.2021
LI31.08.2021
IS22.12.2021
Former [2022/18]CZ14.04.2021
DK14.04.2021
EE14.04.2021
ES14.04.2021
FI14.04.2021
HR14.04.2021
LT14.04.2021
LV14.04.2021
MC14.04.2021
NL14.04.2021
PL14.04.2021
RO14.04.2021
RS14.04.2021
SE14.04.2021
SK14.04.2021
SM14.04.2021
BG14.07.2021
NO14.07.2021
GR15.07.2021
PT16.08.2021
IS22.12.2021
Former [2022/10]CZ14.04.2021
DK14.04.2021
EE14.04.2021
ES14.04.2021
FI14.04.2021
HR14.04.2021
LT14.04.2021
LV14.04.2021
NL14.04.2021
PL14.04.2021
RO14.04.2021
RS14.04.2021
SE14.04.2021
SK14.04.2021
SM14.04.2021
BG14.07.2021
NO14.07.2021
GR15.07.2021
PT16.08.2021
IS22.12.2021
Former [2022/09]CZ14.04.2021
DK14.04.2021
ES14.04.2021
FI14.04.2021
HR14.04.2021
LT14.04.2021
LV14.04.2021
NL14.04.2021
PL14.04.2021
RO14.04.2021
RS14.04.2021
SE14.04.2021
SK14.04.2021
SM14.04.2021
BG14.07.2021
NO14.07.2021
GR15.07.2021
IS14.08.2021
PT16.08.2021
Former [2022/08]CZ14.04.2021
DK14.04.2021
ES14.04.2021
FI14.04.2021
HR14.04.2021
LT14.04.2021
LV14.04.2021
NL14.04.2021
PL14.04.2021
RS14.04.2021
SE14.04.2021
SM14.04.2021
BG14.07.2021
NO14.07.2021
GR15.07.2021
IS14.08.2021
PT16.08.2021
Former [2022/07]FI14.04.2021
HR14.04.2021
LT14.04.2021
LV14.04.2021
NL14.04.2021
PL14.04.2021
RS14.04.2021
SE14.04.2021
SM14.04.2021
BG14.07.2021
NO14.07.2021
GR15.07.2021
IS14.08.2021
PT16.08.2021
Former [2021/52]FI14.04.2021
HR14.04.2021
LT14.04.2021
LV14.04.2021
NL14.04.2021
PL14.04.2021
RS14.04.2021
SE14.04.2021
BG14.07.2021
NO14.07.2021
GR15.07.2021
IS14.08.2021
PT16.08.2021
Former [2021/51]FI14.04.2021
HR14.04.2021
LT14.04.2021
LV14.04.2021
NL14.04.2021
RS14.04.2021
SE14.04.2021
BG14.07.2021
NO14.07.2021
GR15.07.2021
IS14.08.2021
PT16.08.2021
Former [2021/50]FI14.04.2021
HR14.04.2021
LT14.04.2021
LV14.04.2021
NL14.04.2021
SE14.04.2021
BG14.07.2021
NO14.07.2021
GR15.07.2021
PT16.08.2021
Former [2021/49]FI14.04.2021
HR14.04.2021
LT14.04.2021
LV14.04.2021
NL14.04.2021
SE14.04.2021
BG14.07.2021
NO14.07.2021
GR15.07.2021
Former [2021/47]FI14.04.2021
LT14.04.2021
NL14.04.2021
BG14.07.2021
Former [2021/46]FI14.04.2021
LT14.04.2021
Documents cited:Search[A]JP2000316313  (YANMAR DIESEL ENGINE CO) [A] 1-13* abstract *;
 [A]WO2013013917  (AGCO INT GMBH [CH], et al) [A] 1-13 * abstract *;
 [XI]DE102013106548  (CLAAS TRACTOR SAS [FR]) [X] 1,11-13 * paragraph [0044] - paragraph [0057]; figures 1-4; claims 1-16 * [I] 2-10;
 [AD]WO2016045868  (AGCO INT GMBH [CH]) [AD] 1-13 * figures 1, 2; claims 1-15 *
by applicantWO2016045868
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.