blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3291211

EP3291211 - FOLDING BANNER SUPPORT ASSEMBLY [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  17.04.2020
Database last updated on 14.09.2024
FormerThe patent has been granted
Status updated on  10.05.2019
FormerGrant of patent is intended
Status updated on  02.01.2019
FormerRequest for examination was made
Status updated on  17.08.2018
FormerThe application has been published
Status updated on  02.02.2018
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
Mosca, Domenico
Via dei Ligustri, 46
63066 Grottammare (AP) / IT
[2018/10]
Inventor(s)01 / MOSCA, Domenico
Via dei Ligustri, 46
63066 Grottammare (AP) / IT
02 / ACCIARRI, Gianluca
Via San Pietro Vecchio, 30
63900 Fermo (FM) / IT
 [2019/42]
Former [2018/10]01 / * * *
02 / ACCIARRI, Gianluca
Via San Pietro Vecchio, 30
63900 Fermo (FM) / IT
Representative(s)Baldi, Claudio
Ing. Claudio Baldi S.r.l.
Viale Cavallotti, 13
60035 Jesi (Ancona) / IT
[2018/10]
Application number, filing date17187027.221.08.2017
[2018/10]
Priority number, dateIT2016009009306.09.2016         Original published format: IT201600090093
[2018/10]
Filing languageIT
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3291211
Date:07.03.2018
Language:EN
[2018/10]
Type: B1 Patent specification 
No.:EP3291211
Date:12.06.2019
Language:EN
[2019/24]
Type: B8 Corrected title page of specification 
No.:EP3291211
Date:30.10.2019
[2019/44]
Search report(s)(Supplementary) European search report - dispatched on:EP15.12.2017
ClassificationIPC:G09F17/00
[2018/10]
CPC:
G09F17/00 (EP); G09F7/00 (RU); G09F2017/0025 (EP);
G09F2017/0066 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/38]
Former [2018/10]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
Extension statesBA10.08.2018
ME10.08.2018
TitleGerman:STÜTZANORDNUNG FÜR FALTBARES BANNER[2018/10]
English:FOLDING BANNER SUPPORT ASSEMBLY[2018/10]
French:SYSTÈME DE SUPPORT DE BANNIÈRE PLIANTE[2018/10]
Examination procedure21.08.2017Date on which the examining division has become responsible
10.08.2018Examination requested  [2018/38]
03.01.2019Communication of intention to grant the patent
02.05.2019Fee for grant paid
02.05.2019Fee for publishing/printing paid
02.05.2019Receipt of the translation of the claim(s)
12.09.2019Request for correction of the decision to grant filed
Opposition(s)13.03.2020No opposition filed within time limit [2020/21]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU21.08.2017
AL12.06.2019
CY12.06.2019
DK12.06.2019
EE12.06.2019
FI12.06.2019
GR12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
MK12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SI12.06.2019
SM12.06.2019
TR12.06.2019
BG12.09.2019
NO12.09.2019
IS12.10.2019
PT14.10.2019
[2022/32]
Former [2021/33]HU21.08.2017
AL12.06.2019
CY12.06.2019
DK12.06.2019
EE12.06.2019
FI12.06.2019
GR12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SI12.06.2019
SM12.06.2019
TR12.06.2019
BG12.09.2019
NO12.09.2019
IS12.10.2019
PT14.10.2019
Former [2021/30]AL12.06.2019
CY12.06.2019
DK12.06.2019
EE12.06.2019
FI12.06.2019
GR12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SI12.06.2019
SM12.06.2019
TR12.06.2019
BG12.09.2019
NO12.09.2019
IS12.10.2019
PT14.10.2019
Former [2021/26]AL12.06.2019
CY12.06.2019
DK12.06.2019
EE12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SI12.06.2019
SM12.06.2019
TR12.06.2019
BG12.09.2019
NO12.09.2019
IS12.10.2019
PT14.10.2019
Former [2020/36]AL12.06.2019
DK12.06.2019
EE12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SI12.06.2019
SM12.06.2019
TR12.06.2019
BG12.09.2019
NO12.09.2019
IS12.10.2019
PT14.10.2019
Former [2020/24]AL12.06.2019
DK12.06.2019
EE12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SI12.06.2019
SM12.06.2019
TR12.06.2019
BG12.09.2019
NO12.09.2019
PT14.10.2019
IS24.02.2020
Former [2020/22]AL12.06.2019
DK12.06.2019
EE12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SM12.06.2019
TR12.06.2019
BG12.09.2019
NO12.09.2019
IS12.10.2019
PT14.10.2019
Former [2020/17]AL12.06.2019
EE12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SM12.06.2019
TR12.06.2019
BG12.09.2019
NO12.09.2019
IS12.10.2019
PT14.10.2019
Former [2020/14]AL12.06.2019
EE12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SM12.06.2019
BG12.09.2019
NO12.09.2019
IS12.10.2019
PT14.10.2019
Former [2020/12]AL12.06.2019
EE12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
BG12.09.2019
NO12.09.2019
IS12.10.2019
PT14.10.2019
Former [2020/10]AL12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
BG12.09.2019
NO12.09.2019
PT14.10.2019
Former [2019/52]AL12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
RS12.06.2019
SE12.06.2019
BG12.09.2019
NO12.09.2019
Former [2019/50]AL12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
RS12.06.2019
SE12.06.2019
NO12.09.2019
Former [2019/49]AL12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
SE12.06.2019
NO12.09.2019
Former [2019/48]FI12.06.2019
LT12.06.2019
SE12.06.2019
NO12.09.2019
Former [2019/47]FI12.06.2019
LT12.06.2019
NO12.09.2019
Documents cited:Search[A]US2005184206  (LEPLEY ROGER M [US], et al) [A] 1-9 * paragraphs [0031] , [0035] , [0042]; figure - *;
 [A]WO2007022596  (CHALLANGILA PTY LTD [AU], et al) [A] 1-9 * abstract *;
 [A]EP2395498  (TOMACELLI DOMENICO [IT]) [A] 1-9* abstract *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.