blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3447869

EP3447869 - ELECTRICAL CONNECTOR ARRANGEMENT FOR CONNECTING A POWER CABLE AND METHOD FOR INSTALLING A SWITCHGEAR CABINET [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  08.08.2024
Database last updated on 31.08.2024
FormerThe patent has been granted
Status updated on  01.09.2023
FormerGrant of patent is intended
Status updated on  15.05.2023
FormerExamination is in progress
Status updated on  08.07.2020
FormerRequest for examination was made
Status updated on  23.08.2019
FormerThe application has been published
Status updated on  25.01.2019
Most recent event   Tooltip08.08.2024No opposition filed within time limitpublished on 11.09.2024 [2024/37]
Applicant(s)For all designated states
Tyco Electronics Raychem GmbH
Finsinger Feld 1
85521 Ottobrunn / DE
[2019/09]
Inventor(s)01 / SIMONSOHN, Thilo
Gleissnerstraße 10
81735 München / DE
02 / LEDERLE, Christoph
Tulpenweg 2a
83714 Miesbach / DE
 [2019/09]
Representative(s)Grünecker Patent- und Rechtsanwälte PartG mbB
Leopoldstraße 4
80802 München / DE
[2019/09]
Application number, filing date17187414.223.08.2017
[2019/09]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3447869
Date:27.02.2019
Language:EN
[2019/09]
Type: B1 Patent specification 
No.:EP3447869
Date:04.10.2023
Language:EN
[2023/40]
Search report(s)(Supplementary) European search report - dispatched on:EP26.02.2018
ClassificationIPC:H02G15/10, H02G15/06, // H02G9/02
[2019/09]
CPC:
H02G15/06 (EP); H02G15/10 (EP); H02G9/02 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/39]
Former [2019/09]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:ELEKTRISCHE VERBINDERANORDNUNG ZUM VERBINDEN EINES STROMKABELS UND VERFAHREN ZUR INSTALLATION EINES SCHALTSCHRANKS[2019/09]
English:ELECTRICAL CONNECTOR ARRANGEMENT FOR CONNECTING A POWER CABLE AND METHOD FOR INSTALLING A SWITCHGEAR CABINET[2019/09]
French:AGENCEMENT DE CONNECTEUR ÉLECTRIQUE POUR CONNECTER UN CÂBLE D'ALIMENTATION ET PROCÉDÉ D'INSTALLATION D'UNE ARMOIRE DE DISTRIBUTION[2019/09]
Examination procedure19.08.2019Amendment by applicant (claims and/or description)
19.08.2019Examination requested  [2019/39]
19.08.2019Date on which the examining division has become responsible
13.07.2020Despatch of a communication from the examining division (Time limit: M04)
03.11.2020Reply to a communication from the examining division
04.10.2021Despatch of a communication from the examining division (Time limit: M04)
20.01.2022Reply to a communication from the examining division
16.05.2023Communication of intention to grant the patent
25.08.2023Fee for grant paid
25.08.2023Fee for publishing/printing paid
25.08.2023Receipt of the translation of the claim(s)
Opposition(s)05.07.2024No opposition filed within time limit [2024/37]
Fees paidRenewal fee
15.08.2019Renewal fee patent year 03
13.08.2020Renewal fee patent year 04
13.08.2021Renewal fee patent year 05
18.07.2022Renewal fee patent year 06
05.07.2023Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAT04.10.2023
CZ04.10.2023
DK04.10.2023
EE04.10.2023
ES04.10.2023
HR04.10.2023
IT04.10.2023
LT04.10.2023
LV04.10.2023
NL04.10.2023
PL04.10.2023
RO04.10.2023
RS04.10.2023
SE04.10.2023
SK04.10.2023
SM04.10.2023
BG04.01.2024
NO04.01.2024
GR05.01.2024
IS04.02.2024
PT05.02.2024
[2024/36]
Former [2024/35]AT04.10.2023
CZ04.10.2023
DK04.10.2023
EE04.10.2023
ES04.10.2023
HR04.10.2023
LT04.10.2023
LV04.10.2023
NL04.10.2023
PL04.10.2023
RO04.10.2023
RS04.10.2023
SE04.10.2023
SM04.10.2023
BG04.01.2024
NO04.01.2024
GR05.01.2024
IS04.02.2024
PT05.02.2024
Former [2024/34]AT04.10.2023
DK04.10.2023
EE04.10.2023
ES04.10.2023
HR04.10.2023
LT04.10.2023
LV04.10.2023
NL04.10.2023
PL04.10.2023
RS04.10.2023
SE04.10.2023
SM04.10.2023
BG04.01.2024
NO04.01.2024
GR05.01.2024
IS04.02.2024
PT05.02.2024
Former [2024/33]AT04.10.2023
DK04.10.2023
ES04.10.2023
HR04.10.2023
LT04.10.2023
LV04.10.2023
NL04.10.2023
PL04.10.2023
RS04.10.2023
SE04.10.2023
SM04.10.2023
BG04.01.2024
NO04.01.2024
GR05.01.2024
IS04.02.2024
PT05.02.2024
Former [2024/26]AT04.10.2023
ES04.10.2023
HR04.10.2023
LT04.10.2023
LV04.10.2023
NL04.10.2023
PL04.10.2023
RS04.10.2023
SE04.10.2023
BG04.01.2024
NO04.01.2024
GR05.01.2024
IS04.02.2024
PT05.02.2024
Former [2024/25]AT04.10.2023
ES04.10.2023
HR04.10.2023
LT04.10.2023
NL04.10.2023
PL04.10.2023
RS04.10.2023
SE04.10.2023
BG04.01.2024
NO04.01.2024
GR05.01.2024
IS04.02.2024
PT05.02.2024
Former [2024/24]AT04.10.2023
ES04.10.2023
HR04.10.2023
LT04.10.2023
NL04.10.2023
RS04.10.2023
SE04.10.2023
BG04.01.2024
NO04.01.2024
GR05.01.2024
IS04.02.2024
PT05.02.2024
Former [2024/23]AT04.10.2023
ES04.10.2023
LT04.10.2023
NL04.10.2023
BG04.01.2024
GR05.01.2024
IS04.02.2024
PT05.02.2024
Former [2024/21]LT04.10.2023
NL04.10.2023
BG04.01.2024
GR05.01.2024
IS04.02.2024
Former [2024/20]NL04.10.2023
GR05.01.2024
IS04.02.2024
Former [2024/17]NL04.10.2023
Documents cited:Search[Y]BE534079  (SIEMENS-SCHUCKERTWERKE AG) [Y] 4,11-15 * page 1, line 39 - page 2, line 21; figures 1-5 * * page 3, line 48 - page 6, line 22 *;
 [A]US3917985  (FINLEY KEITH W) [A] 11-15* the whole document *;
 [XI]DE8223545U  (KABEL- UND LACKDRAHTFABRIKEN GMBH) [X] 1-3,5 * page 7, line 7 - page 9, line 13; figures 1-4 * [I] 6;
 [XYI]WO9013933  (NKF KABEL BV [NL]) [X] 1-3,5,8 * page 1, line 31 - line 34 * * page 2, lines 12-14 * * page 5, line 4 - page 8, line 32; figures 1,2,5; claim 3 * [Y] 4,9-15 [I] 6;
 [XY]KR20120090420  (KOREA ELECTRIC POWER CORP [KR]) [X] 1,5,7,9 * figures 1-3 * [Y] 9,10;
 [XYI]CN103151630  (SHENZHEN POWER SUPPLY BUREAU, et al) [X] 1-5,7,9 * the whole document * [Y] 10-15 [I] 6;
 [X]CN204349407U  (WUHAN LEAD TECHNOLOGY CO LTD) [X] 1-3,5 * the whole document *
ExaminationUS4891016
 US2008045091
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.