blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3291172

EP3291172 - METHOD FOR CALCULATING FINAL IMAGE DATA [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  15.01.2021
Database last updated on 03.09.2024
FormerThe patent has been granted
Status updated on  07.02.2020
FormerGrant of patent is intended
Status updated on  26.11.2019
FormerExamination is in progress
Status updated on  30.03.2019
FormerRequest for examination was made
Status updated on  14.09.2018
FormerThe application has been published
Status updated on  02.02.2018
Most recent event   Tooltip15.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 17.08.2022  [2022/33]
Applicant(s)For all designated states
AUDI AG
Auto-Union-Strasse 1
85045 Ingolstadt / DE
[2018/10]
Inventor(s)01 / Bruns, Erich
Marlene-Dietrich-Straße 5
85053 Ingolstadt / DE
02 / Jarvers, Christian
Gögginger Straße 31
86159 Augsburg / DE
 [2018/10]
Application number, filing date17188379.629.08.2017
[2018/10]
Priority number, dateDE20161021679506.09.2016         Original published format: DE102016216795
[2018/10]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3291172
Date:07.03.2018
Language:DE
[2018/10]
Type: B1 Patent specification 
No.:EP3291172
Date:11.03.2020
Language:DE
[2020/11]
Search report(s)(Supplementary) European search report - dispatched on:EP21.11.2017
ClassificationIPC:G06T5/00
[2018/10]
CPC:
G06T5/60 (EP); G06T2207/20081 (EP); G06T2207/20084 (EP);
G06T2207/30252 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/42]
Former [2018/10]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:VERFAHREN ZUR ERMITTLUNG VON ERGEBNISBILDDATEN[2018/10]
English:METHOD FOR CALCULATING FINAL IMAGE DATA[2018/10]
French:PROCÉDÉ DE DÉTERMINATION DE DONNÉES D'IMAGE DE RÉSULTAT[2018/10]
Examination procedure29.08.2017Date on which the examining division has become responsible
10.04.2018Amendment by applicant (claims and/or description)
07.09.2018Examination requested  [2018/42]
03.04.2019Despatch of a communication from the examining division (Time limit: M02)
08.05.2019Reply to a communication from the examining division
04.09.2019Despatch of a communication from the examining division (Time limit: M02)
21.10.2019Reply to a communication from the examining division
27.11.2019Communication of intention to grant the patent
28.01.2020Fee for grant paid
28.01.2020Fee for publishing/printing paid
28.01.2020Receipt of the translation of the claim(s)
Opposition(s)14.12.2020No opposition filed within time limit [2021/07]
Fees paidRenewal fee
02.09.2019Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU29.08.2017
AL11.03.2020
CY11.03.2020
CZ11.03.2020
DK11.03.2020
EE11.03.2020
ES11.03.2020
FI11.03.2020
HR11.03.2020
IT11.03.2020
LT11.03.2020
LV11.03.2020
MC11.03.2020
MK11.03.2020
MT11.03.2020
NL11.03.2020
PL11.03.2020
RO11.03.2020
RS11.03.2020
SE11.03.2020
SI11.03.2020
SK11.03.2020
SM11.03.2020
TR11.03.2020
BG11.06.2020
NO11.06.2020
GR12.06.2020
IS11.07.2020
PT05.08.2020
IE29.08.2020
LU29.08.2020
BE31.08.2020
CH31.08.2020
LI31.08.2020
[2022/31]
Former [2022/30]HU29.08.2017
AL11.03.2020
CY11.03.2020
CZ11.03.2020
DK11.03.2020
EE11.03.2020
ES11.03.2020
FI11.03.2020
HR11.03.2020
IT11.03.2020
LT11.03.2020
LV11.03.2020
MC11.03.2020
MT11.03.2020
NL11.03.2020
PL11.03.2020
RO11.03.2020
RS11.03.2020
SE11.03.2020
SI11.03.2020
SK11.03.2020
SM11.03.2020
TR11.03.2020
BG11.06.2020
NO11.06.2020
GR12.06.2020
IS11.07.2020
PT05.08.2020
IE29.08.2020
LU29.08.2020
BE31.08.2020
CH31.08.2020
LI31.08.2020
Former [2022/27]HU29.08.2017
CY11.03.2020
CZ11.03.2020
DK11.03.2020
EE11.03.2020
ES11.03.2020
FI11.03.2020
HR11.03.2020
IT11.03.2020
LT11.03.2020
LV11.03.2020
MC11.03.2020
MT11.03.2020
NL11.03.2020
PL11.03.2020
RO11.03.2020
RS11.03.2020
SE11.03.2020
SI11.03.2020
SK11.03.2020
SM11.03.2020
TR11.03.2020
BG11.06.2020
NO11.06.2020
GR12.06.2020
IS11.07.2020
PT05.08.2020
IE29.08.2020
LU29.08.2020
BE31.08.2020
CH31.08.2020
LI31.08.2020
Former [2021/37]CZ11.03.2020
DK11.03.2020
EE11.03.2020
ES11.03.2020
FI11.03.2020
HR11.03.2020
IT11.03.2020
LT11.03.2020
LV11.03.2020
MC11.03.2020
NL11.03.2020
PL11.03.2020
RO11.03.2020
RS11.03.2020
SE11.03.2020
SI11.03.2020
SK11.03.2020
SM11.03.2020
BG11.06.2020
NO11.06.2020
GR12.06.2020
IS11.07.2020
PT05.08.2020
IE29.08.2020
LU29.08.2020
BE31.08.2020
CH31.08.2020
LI31.08.2020
Former [2021/36]CZ11.03.2020
DK11.03.2020
EE11.03.2020
ES11.03.2020
FI11.03.2020
HR11.03.2020
IT11.03.2020
LT11.03.2020
LV11.03.2020
MC11.03.2020
NL11.03.2020
PL11.03.2020
RO11.03.2020
RS11.03.2020
SE11.03.2020
SI11.03.2020
SK11.03.2020
SM11.03.2020
BG11.06.2020
NO11.06.2020
GR12.06.2020
IS11.07.2020
PT05.08.2020
LU29.08.2020
BE31.08.2020
CH31.08.2020
LI31.08.2020
Former [2021/20]CZ11.03.2020
DK11.03.2020
EE11.03.2020
ES11.03.2020
FI11.03.2020
HR11.03.2020
IT11.03.2020
LT11.03.2020
LV11.03.2020
MC11.03.2020
NL11.03.2020
PL11.03.2020
RO11.03.2020
RS11.03.2020
SE11.03.2020
SI11.03.2020
SK11.03.2020
SM11.03.2020
BG11.06.2020
NO11.06.2020
GR12.06.2020
IS11.07.2020
PT05.08.2020
LU29.08.2020
CH31.08.2020
LI31.08.2020
Former [2021/18]CZ11.03.2020
DK11.03.2020
EE11.03.2020
ES11.03.2020
FI11.03.2020
HR11.03.2020
IT11.03.2020
LT11.03.2020
LV11.03.2020
MC11.03.2020
NL11.03.2020
PL11.03.2020
RO11.03.2020
RS11.03.2020
SE11.03.2020
SI11.03.2020
SK11.03.2020
SM11.03.2020
BG11.06.2020
NO11.06.2020
GR12.06.2020
IS11.07.2020
PT05.08.2020
Former [2021/10]CZ11.03.2020
DK11.03.2020
EE11.03.2020
ES11.03.2020
FI11.03.2020
HR11.03.2020
IT11.03.2020
LT11.03.2020
LV11.03.2020
NL11.03.2020
PL11.03.2020
RO11.03.2020
RS11.03.2020
SE11.03.2020
SI11.03.2020
SK11.03.2020
SM11.03.2020
BG11.06.2020
NO11.06.2020
GR12.06.2020
IS11.07.2020
PT05.08.2020
Former [2021/09]CZ11.03.2020
DK11.03.2020
EE11.03.2020
ES11.03.2020
FI11.03.2020
HR11.03.2020
IT11.03.2020
LT11.03.2020
LV11.03.2020
NL11.03.2020
RO11.03.2020
RS11.03.2020
SE11.03.2020
SK11.03.2020
SM11.03.2020
BG11.06.2020
NO11.06.2020
GR12.06.2020
IS11.07.2020
PT05.08.2020
Former [2021/08]CZ11.03.2020
DK11.03.2020
EE11.03.2020
ES11.03.2020
FI11.03.2020
HR11.03.2020
LT11.03.2020
LV11.03.2020
NL11.03.2020
RO11.03.2020
RS11.03.2020
SE11.03.2020
SK11.03.2020
SM11.03.2020
BG11.06.2020
NO11.06.2020
GR12.06.2020
IS11.07.2020
PT05.08.2020
Former [2020/50]CZ11.03.2020
EE11.03.2020
FI11.03.2020
HR11.03.2020
LT11.03.2020
LV11.03.2020
NL11.03.2020
RO11.03.2020
RS11.03.2020
SE11.03.2020
SK11.03.2020
SM11.03.2020
BG11.06.2020
NO11.06.2020
GR12.06.2020
IS11.07.2020
PT05.08.2020
Former [2020/49]CZ11.03.2020
FI11.03.2020
HR11.03.2020
LT11.03.2020
LV11.03.2020
NL11.03.2020
RO11.03.2020
RS11.03.2020
SE11.03.2020
SK11.03.2020
SM11.03.2020
BG11.06.2020
NO11.06.2020
GR12.06.2020
IS11.07.2020
PT05.08.2020
Former [2020/48]FI11.03.2020
HR11.03.2020
LT11.03.2020
LV11.03.2020
NL11.03.2020
RO11.03.2020
RS11.03.2020
SE11.03.2020
SM11.03.2020
BG11.06.2020
NO11.06.2020
GR12.06.2020
IS11.07.2020
PT05.08.2020
Former [2020/47]FI11.03.2020
HR11.03.2020
LT11.03.2020
LV11.03.2020
NL11.03.2020
RS11.03.2020
SE11.03.2020
BG11.06.2020
NO11.06.2020
GR12.06.2020
IS11.07.2020
Former [2020/46]FI11.03.2020
HR11.03.2020
LV11.03.2020
NL11.03.2020
RS11.03.2020
SE11.03.2020
BG11.06.2020
NO11.06.2020
GR12.06.2020
IS11.07.2020
Former [2020/45]FI11.03.2020
HR11.03.2020
LV11.03.2020
NL11.03.2020
RS11.03.2020
SE11.03.2020
BG11.06.2020
NO11.06.2020
GR12.06.2020
Former [2020/39]FI11.03.2020
HR11.03.2020
LV11.03.2020
RS11.03.2020
SE11.03.2020
BG11.06.2020
NO11.06.2020
GR12.06.2020
Former [2020/38]FI11.03.2020
HR11.03.2020
LV11.03.2020
RS11.03.2020
SE11.03.2020
NO11.06.2020
GR12.06.2020
Former [2020/37]FI11.03.2020
HR11.03.2020
LV11.03.2020
RS11.03.2020
SE11.03.2020
NO11.06.2020
Former [2020/35]FI11.03.2020
NO11.06.2020
Documents cited:Search[A]US2014153819  (LIN ZHE [US], et al) [A] 1-14 * abstract ** paragraphs [0021] - [0023] - [0027] *;
 [XI]US2015178591  (FERGUS ROB [US], et al) [X] 1-4,11-14 * abstract * * paragraphs [0003] , [0013] , [0035] , [0038] , [0047] * [I] 10;
 [XI]  - EIGEN DAVID ET AL, "Restoring an Image Taken through a Window Covered with Dirt or Rain", 2013 IEEE INTERNATIONAL CONFERENCE ON COMPUTER VISION, IEEE, doi:10.1109/ICCV.2013.84, ISSN 1550-5499, (20131201), pages 633 - 640, (20140228), XP032572988 [X] 1-4,11-14 * abstract * * sections 1. Introductions; 2.2. Training; 3. Training Data Collection; 3.1. Dirt * [I] 10

DOI:   http://dx.doi.org/10.1109/ICCV.2013.84
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.