EP3292988 - INTERCHANGEABLE PLATFORM SUPPORT WITH IMPROVED TEMPERATURE CONTROL [Right-click to bookmark this link] | |||
Former [2018/11] | CHANGE PLATFORM SUPPORT WITH IMPROVED TEMPERATURE CONTROL | ||
[2020/35] | Status | No opposition filed within time limit Status updated on 19.11.2021 Database last updated on 20.07.2024 | |
Former | The patent has been granted Status updated on 11.12.2020 | ||
Former | Grant of patent is intended Status updated on 14.09.2020 | ||
Former | Examination is in progress Status updated on 21.06.2019 | ||
Former | Request for examination was made Status updated on 03.08.2018 | ||
Former | The application has been published Status updated on 09.02.2018 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states EOS GmbH Electro Optical Systems Robert-Stirling-Ring 1 82152 Krailling / DE | [2018/11] | Inventor(s) | 01 /
MAYER, Siegfried Dr.-Thann-Str. 12 83059 Kolbermoor / DE | 02 /
MAIER, Horst Kettelerstr. 7 82152 Planegg / DE | [2018/11] | Representative(s) | Prüfer & Partner mbB Patentanwälte · Rechtsanwälte Sohnckestraße 12 81479 München / DE | [2018/11] | Application number, filing date | 17189121.1 | 01.09.2017 | [2018/11] | Priority number, date | DE201610217129 | 08.09.2016 Original published format: DE102016217129 | [2018/11] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3292988 | Date: | 14.03.2018 | Language: | DE | [2018/11] | Type: | B1 Patent specification | No.: | EP3292988 | Date: | 13.01.2021 | Language: | DE | [2021/02] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 13.02.2018 | Classification | IPC: | B29C64/245 | [2018/11] | CPC: |
B29C64/245 (EP,US);
B22F10/00 (CN);
B22F10/31 (EP,CN,US);
B22F10/40 (EP,CN,US);
B22F12/60 (EP,CN,US);
B29C64/295 (US);
B33Y30/00 (CN,US);
C23C24/10 (CN);
B22F10/12 (EP,CN,US);
B22F10/28 (EP,CN,US);
B22F12/20 (EP,CN,US);
B22F12/33 (EP,CN,US);
B29C64/153 (EP,US);
B29C64/165 (EP,US);
B29C64/259 (EP,US);
Y02P10/25 (EP)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/36] |
Former [2018/11] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | WECHSELPLATTFORMTRÄGER MIT VERBESSERTER TEMPERIERUNG | [2018/11] | English: | INTERCHANGEABLE PLATFORM SUPPORT WITH IMPROVED TEMPERATURE CONTROL | [2020/35] | French: | SUPPORT PORTEUR DE PLATEFORME INTERCHANGEABLE AVEC UN CONTRÔLE DE TEMPERATURE AMÉLIORÉ | [2020/35] |
Former [2018/11] | CHANGE PLATFORM SUPPORT WITH IMPROVED TEMPERATURE CONTROL | ||
Former [2018/11] | SUPPORT PORTEUR DE PLATEFORME INTERCHANGEABLE À TEMPÉRAGE AMÉLIORÉ | Examination procedure | 01.09.2017 | Date on which the examining division has become responsible | 26.07.2018 | Amendment by applicant (claims and/or description) | 26.07.2018 | Examination requested [2018/36] | 26.06.2019 | Despatch of a communication from the examining division (Time limit: M06) | 02.01.2020 | Reply to a communication from the examining division | 15.09.2020 | Communication of intention to grant the patent | 03.12.2020 | Fee for grant paid | 03.12.2020 | Fee for publishing/printing paid | 03.12.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 14.10.2021 | No opposition filed within time limit [2021/51] | Fees paid | Renewal fee | 24.09.2019 | Renewal fee patent year 03 | 24.09.2020 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 01.09.2017 | AL | 13.01.2021 | CY | 13.01.2021 | CZ | 13.01.2021 | DK | 13.01.2021 | EE | 13.01.2021 | ES | 13.01.2021 | FI | 13.01.2021 | HR | 13.01.2021 | LT | 13.01.2021 | LV | 13.01.2021 | MC | 13.01.2021 | MK | 13.01.2021 | PL | 13.01.2021 | RO | 13.01.2021 | RS | 13.01.2021 | SE | 13.01.2021 | SI | 13.01.2021 | SK | 13.01.2021 | SM | 13.01.2021 | TR | 13.01.2021 | BG | 13.04.2021 | NO | 13.04.2021 | GR | 14.04.2021 | IS | 13.05.2021 | PT | 13.05.2021 | IE | 01.09.2021 | LU | 01.09.2021 | BE | 30.09.2021 | CH | 30.09.2021 | LI | 30.09.2021 | [2024/29] |
Former [2024/22] | HU | 01.09.2017 | |
AL | 13.01.2021 | ||
CY | 13.01.2021 | ||
CZ | 13.01.2021 | ||
DK | 13.01.2021 | ||
EE | 13.01.2021 | ||
ES | 13.01.2021 | ||
FI | 13.01.2021 | ||
HR | 13.01.2021 | ||
LT | 13.01.2021 | ||
LV | 13.01.2021 | ||
MC | 13.01.2021 | ||
MK | 13.01.2021 | ||
PL | 13.01.2021 | ||
RO | 13.01.2021 | ||
RS | 13.01.2021 | ||
SE | 13.01.2021 | ||
SI | 13.01.2021 | ||
SK | 13.01.2021 | ||
SM | 13.01.2021 | ||
BG | 13.04.2021 | ||
NO | 13.04.2021 | ||
GR | 14.04.2021 | ||
IS | 13.05.2021 | ||
PT | 13.05.2021 | ||
IE | 01.09.2021 | ||
LU | 01.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
LI | 30.09.2021 | ||
Former [2023/30] | HU | 01.09.2017 | |
AL | 13.01.2021 | ||
CY | 13.01.2021 | ||
CZ | 13.01.2021 | ||
DK | 13.01.2021 | ||
EE | 13.01.2021 | ||
ES | 13.01.2021 | ||
FI | 13.01.2021 | ||
HR | 13.01.2021 | ||
LT | 13.01.2021 | ||
LV | 13.01.2021 | ||
MC | 13.01.2021 | ||
PL | 13.01.2021 | ||
RO | 13.01.2021 | ||
RS | 13.01.2021 | ||
SE | 13.01.2021 | ||
SI | 13.01.2021 | ||
SK | 13.01.2021 | ||
SM | 13.01.2021 | ||
BG | 13.04.2021 | ||
NO | 13.04.2021 | ||
GR | 14.04.2021 | ||
IS | 13.05.2021 | ||
PT | 13.05.2021 | ||
IE | 01.09.2021 | ||
LU | 01.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
LI | 30.09.2021 | ||
Former [2023/27] | HU | 01.09.2017 | |
AL | 13.01.2021 | ||
CZ | 13.01.2021 | ||
DK | 13.01.2021 | ||
EE | 13.01.2021 | ||
ES | 13.01.2021 | ||
FI | 13.01.2021 | ||
HR | 13.01.2021 | ||
LT | 13.01.2021 | ||
LV | 13.01.2021 | ||
MC | 13.01.2021 | ||
PL | 13.01.2021 | ||
RO | 13.01.2021 | ||
RS | 13.01.2021 | ||
SE | 13.01.2021 | ||
SI | 13.01.2021 | ||
SK | 13.01.2021 | ||
SM | 13.01.2021 | ||
BG | 13.04.2021 | ||
NO | 13.04.2021 | ||
GR | 14.04.2021 | ||
IS | 13.05.2021 | ||
PT | 13.05.2021 | ||
IE | 01.09.2021 | ||
LU | 01.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
LI | 30.09.2021 | ||
Former [2022/37] | AL | 13.01.2021 | |
CZ | 13.01.2021 | ||
DK | 13.01.2021 | ||
EE | 13.01.2021 | ||
ES | 13.01.2021 | ||
FI | 13.01.2021 | ||
HR | 13.01.2021 | ||
LT | 13.01.2021 | ||
LV | 13.01.2021 | ||
MC | 13.01.2021 | ||
PL | 13.01.2021 | ||
RO | 13.01.2021 | ||
RS | 13.01.2021 | ||
SE | 13.01.2021 | ||
SI | 13.01.2021 | ||
SK | 13.01.2021 | ||
SM | 13.01.2021 | ||
BG | 13.04.2021 | ||
NO | 13.04.2021 | ||
GR | 14.04.2021 | ||
IS | 13.05.2021 | ||
PT | 13.05.2021 | ||
IE | 01.09.2021 | ||
LU | 01.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
LI | 30.09.2021 | ||
Former [2022/35] | AL | 13.01.2021 | |
CZ | 13.01.2021 | ||
DK | 13.01.2021 | ||
EE | 13.01.2021 | ||
ES | 13.01.2021 | ||
FI | 13.01.2021 | ||
HR | 13.01.2021 | ||
LT | 13.01.2021 | ||
LV | 13.01.2021 | ||
MC | 13.01.2021 | ||
PL | 13.01.2021 | ||
RO | 13.01.2021 | ||
RS | 13.01.2021 | ||
SE | 13.01.2021 | ||
SI | 13.01.2021 | ||
SK | 13.01.2021 | ||
SM | 13.01.2021 | ||
BG | 13.04.2021 | ||
NO | 13.04.2021 | ||
GR | 14.04.2021 | ||
IS | 13.05.2021 | ||
PT | 13.05.2021 | ||
IE | 01.09.2021 | ||
LU | 01.09.2021 | ||
BE | 30.09.2021 | ||
Former [2022/34] | AL | 13.01.2021 | |
CZ | 13.01.2021 | ||
DK | 13.01.2021 | ||
EE | 13.01.2021 | ||
ES | 13.01.2021 | ||
FI | 13.01.2021 | ||
HR | 13.01.2021 | ||
LT | 13.01.2021 | ||
LV | 13.01.2021 | ||
MC | 13.01.2021 | ||
PL | 13.01.2021 | ||
RO | 13.01.2021 | ||
RS | 13.01.2021 | ||
SE | 13.01.2021 | ||
SI | 13.01.2021 | ||
SK | 13.01.2021 | ||
SM | 13.01.2021 | ||
BG | 13.04.2021 | ||
NO | 13.04.2021 | ||
GR | 14.04.2021 | ||
IS | 13.05.2021 | ||
PT | 13.05.2021 | ||
LU | 01.09.2021 | ||
BE | 30.09.2021 | ||
Former [2022/25] | AL | 13.01.2021 | |
CZ | 13.01.2021 | ||
DK | 13.01.2021 | ||
EE | 13.01.2021 | ||
ES | 13.01.2021 | ||
FI | 13.01.2021 | ||
HR | 13.01.2021 | ||
LT | 13.01.2021 | ||
LV | 13.01.2021 | ||
MC | 13.01.2021 | ||
PL | 13.01.2021 | ||
RO | 13.01.2021 | ||
RS | 13.01.2021 | ||
SE | 13.01.2021 | ||
SI | 13.01.2021 | ||
SK | 13.01.2021 | ||
SM | 13.01.2021 | ||
BG | 13.04.2021 | ||
NO | 13.04.2021 | ||
GR | 14.04.2021 | ||
IS | 13.05.2021 | ||
PT | 13.05.2021 | ||
Former [2022/23] | AL | 13.01.2021 | |
CZ | 13.01.2021 | ||
DK | 13.01.2021 | ||
EE | 13.01.2021 | ||
ES | 13.01.2021 | ||
FI | 13.01.2021 | ||
HR | 13.01.2021 | ||
LT | 13.01.2021 | ||
LV | 13.01.2021 | ||
PL | 13.01.2021 | ||
RO | 13.01.2021 | ||
RS | 13.01.2021 | ||
SE | 13.01.2021 | ||
SI | 13.01.2021 | ||
SK | 13.01.2021 | ||
SM | 13.01.2021 | ||
BG | 13.04.2021 | ||
NO | 13.04.2021 | ||
GR | 14.04.2021 | ||
IS | 13.05.2021 | ||
PT | 13.05.2021 | ||
Former [2022/13] | AL | 13.01.2021 | |
CZ | 13.01.2021 | ||
DK | 13.01.2021 | ||
EE | 13.01.2021 | ||
ES | 13.01.2021 | ||
FI | 13.01.2021 | ||
HR | 13.01.2021 | ||
LT | 13.01.2021 | ||
LV | 13.01.2021 | ||
PL | 13.01.2021 | ||
RO | 13.01.2021 | ||
RS | 13.01.2021 | ||
SE | 13.01.2021 | ||
SI | 13.01.2021 | ||
SK | 13.01.2021 | ||
SM | 13.01.2021 | ||
BG | 13.04.2021 | ||
NO | 13.04.2021 | ||
GR | 14.04.2021 | ||
PT | 13.05.2021 | ||
Former [2022/10] | AL | 13.01.2021 | |
CZ | 13.01.2021 | ||
DK | 13.01.2021 | ||
EE | 13.01.2021 | ||
ES | 13.01.2021 | ||
FI | 13.01.2021 | ||
HR | 13.01.2021 | ||
LT | 13.01.2021 | ||
LV | 13.01.2021 | ||
PL | 13.01.2021 | ||
RO | 13.01.2021 | ||
RS | 13.01.2021 | ||
SE | 13.01.2021 | ||
SK | 13.01.2021 | ||
SM | 13.01.2021 | ||
BG | 13.04.2021 | ||
NO | 13.04.2021 | ||
GR | 14.04.2021 | ||
PT | 13.05.2021 | ||
Former [2022/08] | AL | 13.01.2021 | |
CZ | 13.01.2021 | ||
DK | 13.01.2021 | ||
EE | 13.01.2021 | ||
ES | 13.01.2021 | ||
FI | 13.01.2021 | ||
HR | 13.01.2021 | ||
LT | 13.01.2021 | ||
LV | 13.01.2021 | ||
PL | 13.01.2021 | ||
RO | 13.01.2021 | ||
RS | 13.01.2021 | ||
SE | 13.01.2021 | ||
SK | 13.01.2021 | ||
SM | 13.01.2021 | ||
BG | 13.04.2021 | ||
NO | 13.04.2021 | ||
GR | 14.04.2021 | ||
IS | 13.05.2021 | ||
PT | 13.05.2021 | ||
Former [2022/07] | AL | 13.01.2021 | |
CZ | 13.01.2021 | ||
DK | 13.01.2021 | ||
EE | 13.01.2021 | ||
FI | 13.01.2021 | ||
HR | 13.01.2021 | ||
LT | 13.01.2021 | ||
LV | 13.01.2021 | ||
PL | 13.01.2021 | ||
RO | 13.01.2021 | ||
RS | 13.01.2021 | ||
SE | 13.01.2021 | ||
SK | 13.01.2021 | ||
SM | 13.01.2021 | ||
BG | 13.04.2021 | ||
NO | 13.04.2021 | ||
GR | 14.04.2021 | ||
IS | 13.05.2021 | ||
PT | 13.05.2021 | ||
Former [2021/50] | CZ | 13.01.2021 | |
DK | 13.01.2021 | ||
EE | 13.01.2021 | ||
FI | 13.01.2021 | ||
HR | 13.01.2021 | ||
LT | 13.01.2021 | ||
LV | 13.01.2021 | ||
PL | 13.01.2021 | ||
RO | 13.01.2021 | ||
RS | 13.01.2021 | ||
SE | 13.01.2021 | ||
SK | 13.01.2021 | ||
SM | 13.01.2021 | ||
BG | 13.04.2021 | ||
NO | 13.04.2021 | ||
GR | 14.04.2021 | ||
IS | 13.05.2021 | ||
PT | 13.05.2021 | ||
Former [2021/49] | CZ | 13.01.2021 | |
DK | 13.01.2021 | ||
EE | 13.01.2021 | ||
FI | 13.01.2021 | ||
HR | 13.01.2021 | ||
LT | 13.01.2021 | ||
LV | 13.01.2021 | ||
PL | 13.01.2021 | ||
RS | 13.01.2021 | ||
SE | 13.01.2021 | ||
SM | 13.01.2021 | ||
BG | 13.04.2021 | ||
NO | 13.04.2021 | ||
GR | 14.04.2021 | ||
IS | 13.05.2021 | ||
PT | 13.05.2021 | ||
Former [2021/48] | CZ | 13.01.2021 | |
EE | 13.01.2021 | ||
FI | 13.01.2021 | ||
HR | 13.01.2021 | ||
LT | 13.01.2021 | ||
LV | 13.01.2021 | ||
PL | 13.01.2021 | ||
RS | 13.01.2021 | ||
SE | 13.01.2021 | ||
SM | 13.01.2021 | ||
BG | 13.04.2021 | ||
NO | 13.04.2021 | ||
GR | 14.04.2021 | ||
IS | 13.05.2021 | ||
PT | 13.05.2021 | ||
Former [2021/46] | FI | 13.01.2021 | |
HR | 13.01.2021 | ||
LT | 13.01.2021 | ||
LV | 13.01.2021 | ||
PL | 13.01.2021 | ||
RS | 13.01.2021 | ||
SE | 13.01.2021 | ||
SM | 13.01.2021 | ||
BG | 13.04.2021 | ||
NO | 13.04.2021 | ||
GR | 14.04.2021 | ||
IS | 13.05.2021 | ||
PT | 13.05.2021 | ||
Former [2021/42] | FI | 13.01.2021 | |
HR | 13.01.2021 | ||
LT | 13.01.2021 | ||
LV | 13.01.2021 | ||
PL | 13.01.2021 | ||
RS | 13.01.2021 | ||
SE | 13.01.2021 | ||
BG | 13.04.2021 | ||
NO | 13.04.2021 | ||
GR | 14.04.2021 | ||
IS | 13.05.2021 | ||
PT | 13.05.2021 | ||
Former [2021/39] | FI | 13.01.2021 | |
HR | 13.01.2021 | ||
LT | 13.01.2021 | ||
LV | 13.01.2021 | ||
PL | 13.01.2021 | ||
RS | 13.01.2021 | ||
SE | 13.01.2021 | ||
BG | 13.04.2021 | ||
NO | 13.04.2021 | ||
GR | 14.04.2021 | ||
PT | 13.05.2021 | ||
Former [2021/38] | FI | 13.01.2021 | |
HR | 13.01.2021 | ||
LT | 13.01.2021 | ||
LV | 13.01.2021 | ||
RS | 13.01.2021 | ||
SE | 13.01.2021 | ||
BG | 13.04.2021 | ||
NO | 13.04.2021 | ||
GR | 14.04.2021 | ||
PT | 13.05.2021 | ||
Former [2021/37] | FI | 13.01.2021 | |
HR | 13.01.2021 | ||
LT | 13.01.2021 | ||
LV | 13.01.2021 | ||
RS | 13.01.2021 | ||
BG | 13.04.2021 | ||
NO | 13.04.2021 | ||
GR | 14.04.2021 | ||
PT | 13.05.2021 | ||
Former [2021/36] | FI | 13.01.2021 | |
HR | 13.01.2021 | ||
LT | 13.01.2021 | ||
BG | 13.04.2021 | ||
NO | 13.04.2021 | ||
GR | 14.04.2021 | ||
PT | 13.05.2021 | ||
Former [2021/35] | FI | 13.01.2021 | |
HR | 13.01.2021 | ||
LT | 13.01.2021 | ||
NO | 13.04.2021 | ||
PT | 13.05.2021 | ||
Former [2021/33] | FI | 13.01.2021 | |
LT | 13.01.2021 | ||
NO | 13.04.2021 | ||
PT | 13.05.2021 | Documents cited: | Search | [XI]DE29624498U (EOS ELECTRO OPTICAL SYST [DE]) [X] 1,2,4,5,12,15 * paragraph [0019] - paragraph [0024] * * figure 1 *[I] 3; | [XI]DE10342880 (TRUMPF WERKZEUGMASCHINEN GMBH [DE]) [X] 1-8,10,12-15 * paragraph [0021] * * paragraph [0046] * * paragraph [0073] - paragraph [0078] * * claim - * * figure 7b * [I] 9,11; | [XI]DE102013001374 (CL SCHUTZRECHTSVERWALTUNGS GMBH [DE]) [X] 1-8,10,12-15 * paragraph [0042] - paragraph [0044] * [I] 9,11 |