blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3295852

EP3295852 - AIRCRAFT INCLUDING LAVATORY WITH HAND DRYER HAVING MANAGED AIR FLOW [Right-click to bookmark this link]
Former [2018/12]HAND DRYER HAVING MANAGED AIR FLOW
[2018/51]
StatusNo opposition filed within time limit
Status updated on  24.12.2021
Database last updated on 25.09.2024
FormerThe patent has been granted
Status updated on  15.01.2021
FormerGrant of patent is intended
Status updated on  24.09.2020
FormerExamination is in progress
Status updated on  04.09.2020
FormerGrant of patent is intended
Status updated on  07.05.2020
FormerExamination is in progress
Status updated on  28.03.2020
FormerGrant of patent is intended
Status updated on  29.11.2019
FormerExamination is in progress
Status updated on  15.04.2019
FormerRequest for examination was made
Status updated on  12.04.2019
FormerGrant of patent is intended
Status updated on  22.11.2018
FormerRequest for examination was made
Status updated on  16.02.2018
Most recent event   Tooltip06.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 09.10.2024 [2024/41]
Applicant(s)For all designated states
The Boeing Company
100 North Riverside Plaza
Chicago, IL 60606-2016 / US
[2018/12]
Inventor(s)01 / SATERMO, Eric K
c/o The Boeing Company
100 North Riverside Plaza
Chicago, IL Illinois 60606-2016 / US
 [2018/12]
Representative(s)Boult Wade Tennant LLP
Salisbury Square House
8 Salisbury Square
London EC4Y 8AP / GB
[2021/07]
Former [2018/12]Boult Wade Tennant
Verulam Gardens
70 Gray's Inn Road
London WC1X 8BT / GB
Application number, filing date17190600.112.09.2017
[2018/12]
Priority number, dateUS20161527099120.09.2016         Original published format: US201615270991
[2018/12]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3295852
Date:21.03.2018
Language:EN
[2018/12]
Type: B1 Patent specification 
No.:EP3295852
Date:17.02.2021
Language:EN
[2021/07]
Search report(s)(Supplementary) European search report - dispatched on:EP19.01.2018
ClassificationIPC:A47K10/48, B64D11/02
[2018/12]
CPC:
A47K10/48 (EP,BR,CN,US); B64D11/02 (EP,BR,US); B64D2013/0629 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/12]
TitleGerman:FLUGZEUGE MIT EINER EINEN HANDTROCKNER MIT VERWALTETER LUFTSTRÖMUNG EINSCHLIESSENDEN TOILETTE[2018/51]
English:AIRCRAFT INCLUDING LAVATORY WITH HAND DRYER HAVING MANAGED AIR FLOW[2018/51]
French:AVION COMPRENANT UN LAVABO COMPRENANT UN SÈCHE-MAINS PRÉSENTANT UN ÉCOULEMENT D'AIR GÉRÉ[2018/51]
Former [2018/12]HANDTROCKNER MIT VERWALTETER LUFTSTRÖMUNG
Former [2018/12]HAND DRYER HAVING MANAGED AIR FLOW
Former [2018/12]SÈCHE-MAINS PRÉSENTANT UN ÉCOULEMENT D'AIR GÉRÉ
Examination procedure12.09.2017Examination requested  [2018/12]
12.09.2017Date on which the examining division has become responsible
20.09.2018Amendment by applicant (claims and/or description)
23.11.2018Communication of intention to grant the patent
02.04.2019Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
18.04.2019Despatch of a communication from the examining division (Time limit: M06)
08.10.2019Reply to a communication from the examining division
29.11.2019Communication of intention to grant the patent
25.03.2020Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
08.05.2020Communication of intention to grant the patent
04.09.2020Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
25.09.2020Communication of intention to grant the patent
11.01.2021Fee for grant paid
11.01.2021Fee for publishing/printing paid
11.01.2021Receipt of the translation of the claim(s)
Divisional application(s)EP20167017.1  / EP3692878
Opposition(s)18.11.2021No opposition filed within time limit [2022/04]
Fees paidRenewal fee
27.09.2019Renewal fee patent year 03
28.09.2020Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU12.09.2017
AL17.02.2021
AT17.02.2021
CY17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
IT17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
MK17.02.2021
MT17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
IE12.09.2021
LU12.09.2021
BE30.09.2021
CH30.09.2021
LI30.09.2021
[2024/41]
Former [2024/22]HU12.09.2017
AL17.02.2021
AT17.02.2021
CY17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
IT17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
MK17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
IE12.09.2021
LU12.09.2021
BE30.09.2021
CH30.09.2021
LI30.09.2021
Former [2023/30]HU12.09.2017
AL17.02.2021
AT17.02.2021
CY17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
IT17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
IE12.09.2021
LU12.09.2021
BE30.09.2021
CH30.09.2021
LI30.09.2021
Former [2023/29]HU12.09.2017
AL17.02.2021
AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
IT17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
IE12.09.2021
LU12.09.2021
BE30.09.2021
CH30.09.2021
LI30.09.2021
Former [2022/37]AL17.02.2021
AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
IT17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
IE12.09.2021
LU12.09.2021
BE30.09.2021
CH30.09.2021
LI30.09.2021
Former [2022/35]AL17.02.2021
AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
IT17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
IE12.09.2021
LU12.09.2021
BE30.09.2021
Former [2022/34]AL17.02.2021
AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
IT17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
LU12.09.2021
BE30.09.2021
Former [2022/25]AL17.02.2021
AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
IT17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2022/23]AL17.02.2021
AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
IT17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2022/13]AL17.02.2021
AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
PT17.06.2021
Former [2022/10]AL17.02.2021
AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
PT17.06.2021
Former [2022/08]AL17.02.2021
AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2022/07]AL17.02.2021
AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2021/50]AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2021/49]AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RS17.02.2021
SE17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2021/48]AT17.02.2021
CZ17.02.2021
EE17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RS17.02.2021
SE17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2021/46]AT17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RS17.02.2021
SE17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2021/42]FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RS17.02.2021
SE17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2021/39]FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RS17.02.2021
SE17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
PT17.06.2021
Former [2021/38]FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
RS17.02.2021
SE17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
PT17.06.2021
Former [2021/37]FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
RS17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
PT17.06.2021
Former [2021/36]FI17.02.2021
HR17.02.2021
LT17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
PT17.06.2021
Former [2021/35]FI17.02.2021
HR17.02.2021
LT17.02.2021
NO17.05.2021
PT17.06.2021
Former [2021/33]FI17.02.2021
LT17.02.2021
NO17.05.2021
PT17.06.2021
Documents cited:Search[XAI]DE2657164  (SPRENGER ALBIN KG) [X] 1-5 * the whole document * [A] 13,14 [I] 8;
 [XI]JPH11197055  (MATSUSHITA ELECTRIC IND CO LTD) [X] 1-3,6,7,9 * the whole document * [I] 8,10,13,14;
 [XAI]WO2010089926  (SHARP KK [JP], et al) [X] 1-3,6,7 * paragraph [0025] - paragraph [0065]; figure - * [A] 13,14[I] 8-10;
 [XAI]WO2012076521  (GRAYDON BRIAN [IE]) [X] 1-4,6,7,9 * page 5, line 17 - page 9, line 21; figure - * [A] 13,14 [I] 8,10;
 [A]WO2016016938  (JAMCO CORP [JP]) [A] 1,11-13,15 * paragraph [0012]; figure -; claim - *
by applicantUS3766397
 US2015210398
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.