EP3457434 - METHOD FOR PRODUCING A SEMICONDUCTOR SUBSTRATE FOR A POWER SEMICONDUCTOR MODULE ARRANGEMENT [Right-click to bookmark this link] | |||
Former [2019/12] | SEMICONDUCTOR SUBSTRATE FOR A POWER SEMICONDUCTOR MODULE ARRANGEMENT AND METHOD FOR PRODUCING THE SAME | ||
[2020/15] | Status | No opposition filed within time limit Status updated on 24.09.2021 Database last updated on 15.06.2024 | |
Former | The patent has been granted Status updated on 16.10.2020 | ||
Former | Grant of patent is intended Status updated on 23.06.2020 | ||
Former | Examination is in progress Status updated on 11.03.2020 | ||
Former | Request for examination was made Status updated on 15.02.2019 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states Infineon Technologies AG Am Campeon 1-12 85579 Neubiberg / DE | [2019/12] | Inventor(s) | 01 /
Roth, Alexander Regensburger Str. 18 93197 Zeitlarn / DE | 02 /
Hohlfeld, Olaf Am Oberhagen 25 59581 Warstein / DE | [2019/12] | Representative(s) | Westphal, Mussgnug & Partner, Patentanwälte mbB Werinherstraße 79 81541 München / DE | [N/P] |
Former [2019/12] | Westphal, Mussgnug & Partner Patentanwälte mbB Werinherstrasse 79 81541 München / DE | Application number, filing date | 17190747.0 | 13.09.2017 | [2019/12] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3457434 | Date: | 20.03.2019 | Language: | EN | [2019/12] | Type: | B1 Patent specification | No.: | EP3457434 | Date: | 18.11.2020 | Language: | EN | [2020/47] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 15.03.2018 | Classification | IPC: | H01L23/52, H01L23/373, H01L23/498 | [2020/15] | CPC: |
H01L23/3735 (EP);
H01L23/49822 (EP);
H01L2224/48091 (EP);
H01L2224/48472 (EP)
| C-Set: |
H01L2224/48091, H01L2924/00014 (EP)
|
Former IPC [2019/12] | H01L23/52, H01L23/373 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/12] | Title | German: | VERFAHREN ZUR HERSTELLUNG EINES HALBLEITERSUBSTRATS FÜR EINE LEISTUNGSHALBLEITERMODULANORDNUNG | [2020/15] | English: | METHOD FOR PRODUCING A SEMICONDUCTOR SUBSTRATE FOR A POWER SEMICONDUCTOR MODULE ARRANGEMENT | [2020/15] | French: | PROCÉDÉ DE FABRICATION D'UN SUBSTRAT SEMI-CONDUCTEUR POUR UN AGENCEMENT DE MODULE SEMI-CONDUCTEUR DE PUISSANCE | [2020/15] |
Former [2019/12] | HALBLEITERSUBSTRAT FÜR EINE LEISTUNGSHALBLEITERMODULANORDNUNG UND VERFAHREN ZUR HERSTELLUNG DAVON | ||
Former [2019/12] | SEMICONDUCTOR SUBSTRATE FOR A POWER SEMICONDUCTOR MODULE ARRANGEMENT AND METHOD FOR PRODUCING THE SAME | ||
Former [2019/12] | SUBSTRAT SEMI-CONDUCTEUR POUR UN AGENCEMENT DE MODULE SEMI-CONDUCTEUR DE PUISSANCE ET SON PROCÉDÉ DE FABRICATION | Examination procedure | 02.07.2018 | Amendment by applicant (claims and/or description) | 02.07.2018 | Examination requested [2019/12] | 02.07.2018 | Date on which the examining division has become responsible | 16.03.2020 | Despatch of a communication from the examining division (Time limit: M02) | 12.05.2020 | Reply to a communication from the examining division | 24.06.2020 | Communication of intention to grant the patent | 09.10.2020 | Fee for grant paid | 09.10.2020 | Fee for publishing/printing paid | 09.10.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 19.08.2021 | No opposition filed within time limit [2021/43] | Fees paid | Renewal fee | 24.09.2019 | Renewal fee patent year 03 | 24.09.2020 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 13.09.2017 | AL | 18.11.2020 | AT | 18.11.2020 | CY | 18.11.2020 | CZ | 18.11.2020 | DK | 18.11.2020 | EE | 18.11.2020 | ES | 18.11.2020 | FI | 18.11.2020 | HR | 18.11.2020 | IT | 18.11.2020 | LT | 18.11.2020 | LV | 18.11.2020 | MC | 18.11.2020 | MK | 18.11.2020 | NL | 18.11.2020 | PL | 18.11.2020 | RO | 18.11.2020 | RS | 18.11.2020 | SE | 18.11.2020 | SI | 18.11.2020 | SK | 18.11.2020 | SM | 18.11.2020 | BG | 18.02.2021 | NO | 18.02.2021 | GR | 19.02.2021 | IS | 18.03.2021 | PT | 18.03.2021 | [2024/22] |
Former [2023/33] | HU | 13.09.2017 | |
AL | 18.11.2020 | ||
AT | 18.11.2020 | ||
CY | 18.11.2020 | ||
CZ | 18.11.2020 | ||
DK | 18.11.2020 | ||
EE | 18.11.2020 | ||
ES | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
IT | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
MC | 18.11.2020 | ||
NL | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
SI | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2023/30] | AL | 18.11.2020 | |
AT | 18.11.2020 | ||
CY | 18.11.2020 | ||
CZ | 18.11.2020 | ||
DK | 18.11.2020 | ||
EE | 18.11.2020 | ||
ES | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
IT | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
MC | 18.11.2020 | ||
NL | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
SI | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2022/25] | AL | 18.11.2020 | |
AT | 18.11.2020 | ||
CZ | 18.11.2020 | ||
DK | 18.11.2020 | ||
EE | 18.11.2020 | ||
ES | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
IT | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
MC | 18.11.2020 | ||
NL | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
SI | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2022/23] | AL | 18.11.2020 | |
AT | 18.11.2020 | ||
CZ | 18.11.2020 | ||
DK | 18.11.2020 | ||
EE | 18.11.2020 | ||
ES | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
IT | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
NL | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
SI | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2022/10] | AL | 18.11.2020 | |
AT | 18.11.2020 | ||
CZ | 18.11.2020 | ||
DK | 18.11.2020 | ||
EE | 18.11.2020 | ||
ES | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
IT | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
NL | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
SI | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
PT | 18.03.2021 | ||
Former [2022/08] | AL | 18.11.2020 | |
AT | 18.11.2020 | ||
CZ | 18.11.2020 | ||
DK | 18.11.2020 | ||
EE | 18.11.2020 | ||
ES | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
IT | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
NL | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
SI | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2021/50] | AL | 18.11.2020 | |
AT | 18.11.2020 | ||
CZ | 18.11.2020 | ||
DK | 18.11.2020 | ||
EE | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
IT | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
NL | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
SI | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2021/48] | AL | 18.11.2020 | |
AT | 18.11.2020 | ||
CZ | 18.11.2020 | ||
DK | 18.11.2020 | ||
EE | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
IT | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
NL | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2021/46] | AL | 18.11.2020 | |
AT | 18.11.2020 | ||
CZ | 18.11.2020 | ||
DK | 18.11.2020 | ||
EE | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
NL | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2021/45] | AL | 18.11.2020 | |
AT | 18.11.2020 | ||
CZ | 18.11.2020 | ||
DK | 18.11.2020 | ||
EE | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2021/37] | AT | 18.11.2020 | |
CZ | 18.11.2020 | ||
DK | 18.11.2020 | ||
EE | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2021/36] | AT | 18.11.2020 | |
CZ | 18.11.2020 | ||
EE | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2021/35] | AT | 18.11.2020 | |
CZ | 18.11.2020 | ||
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
PL | 18.11.2020 | ||
RO | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
SK | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2021/33] | AT | 18.11.2020 | |
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
LT | 18.11.2020 | ||
LV | 18.11.2020 | ||
PL | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2021/32] | AT | 18.11.2020 | |
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
LV | 18.11.2020 | ||
PL | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
SM | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2021/28] | AT | 18.11.2020 | |
FI | 18.11.2020 | ||
HR | 18.11.2020 | ||
LV | 18.11.2020 | ||
PL | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2021/25] | AT | 18.11.2020 | |
FI | 18.11.2020 | ||
LV | 18.11.2020 | ||
PL | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
IS | 18.03.2021 | ||
PT | 18.03.2021 | ||
Former [2021/23] | AT | 18.11.2020 | |
FI | 18.11.2020 | ||
LV | 18.11.2020 | ||
RS | 18.11.2020 | ||
SE | 18.11.2020 | ||
BG | 18.02.2021 | ||
NO | 18.02.2021 | ||
GR | 19.02.2021 | ||
PT | 18.03.2021 | ||
Former [2021/22] | FI | 18.11.2020 | |
RS | 18.11.2020 | ||
NO | 18.02.2021 | ||
PT | 18.03.2021 | ||
Former [2021/21] | FI | 18.11.2020 | |
PT | 18.03.2021 | ||
Former [2021/20] | FI | 18.11.2020 | Documents cited: | Search | [XY]JP2003198104 (SONY CHEMICALS) [X] 1,2,8 * abstract * * paragraph [0060] - paragraph [0064] * [Y] 3-7,9-15; | [A]US2011127562 (SUNG CHIEN-MIN [US], et al) [A] 1-15* abstract *; | [XY]US2013277846 (ZIEGLER ROBERT [DE]) [X] 15 * abstract * * paragraphs [0002] , [0008] , [0009] , [0030] , [0034] * [Y] 3-7,9-15; | [A]JP2014056933 (SHINDENGEN ELECTRIC MFG) [A] 1-15 * abstract * * paragraph [0002] *; | [Y]US2014138710 (OHTSU KENJI [JP], et al) [Y] 3-7,9-15 * abstract * * paragraphs [0021] , [0023] , [0030] , [0031] , [0034] * |