EP3457664 - METHOD AND SYSTEM FOR FINDING A NEXT EDGE CLOUD FOR A MOBILE USER [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 11.09.2020 Database last updated on 15.06.2024 | |
Former | The patent has been granted Status updated on 04.10.2019 | ||
Former | Grant of patent is intended Status updated on 18.09.2019 | ||
Former | Request for examination was made Status updated on 04.09.2019 | ||
Former | Grant of patent is intended Status updated on 22.05.2019 | ||
Former | Request for examination was made Status updated on 15.02.2019 | Most recent event Tooltip | 15.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 17.08.2022 [2022/33] | Applicant(s) | For all designated states Deutsche Telekom AG Friedrich-Ebert-Allee 140 53113 Bonn / DE | [2019/39] |
Former [2019/12] | For all designated states Deutsche Telekom AG Friedrich-Ebert-Allee 140 53113 Bonn / DE | ||
For all designated states Technische Universität Berlin Strasse des 17. Juni 135 10623 Berlin / DE | Inventor(s) | 01 /
Roshandel, Mehran Buschowerweg 66 13591 Berlin / DE | 02 /
Mashhadi Sohi, Soroush Bitscher Straße 10 14195 Berlin / DE | [2019/12] | Representative(s) | Vossius & Partner Patentanwälte Rechtsanwälte mbB Siebertstrasse 3 81675 München / DE | [2019/12] | Application number, filing date | 17191041.7 | 14.09.2017 | [2019/12] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3457664 | Date: | 20.03.2019 | Language: | EN | [2019/12] | Type: | B1 Patent specification | No.: | EP3457664 | Date: | 06.11.2019 | Language: | EN | [2019/45] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 13.11.2017 | Classification | IPC: | H04L29/08, H04W4/60, // H04W36/32 | [2019/20] | CPC: |
H04W4/60 (EP);
H04L67/34 (EP);
H04W36/328 (EP);
H04W36/322 (EP)
|
Former IPC [2019/12] | H04L29/08, H04W4/00, // H04W36/32 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/12] | Title | German: | VERFAHREN UND SYSTEM ZUM FINDEN EINER NEXT-EDGE-CLOUD FÜR EINEN MOBILEN NUTZER | [2019/12] | English: | METHOD AND SYSTEM FOR FINDING A NEXT EDGE CLOUD FOR A MOBILE USER | [2019/12] | French: | PROCÉDÉ ET SYSTÈME POUR TROUVER UN NUAGE PÉRIPHÉRIQUE SUIVANT POUR UN UTILISATEUR MOBILE | [2019/12] | Examination procedure | 11.01.2019 | Amendment by applicant (claims and/or description) | 11.01.2019 | Examination requested [2019/12] | 11.01.2019 | Date on which the examining division has become responsible | 23.05.2019 | Communication of intention to grant the patent | 04.09.2019 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 04.09.2019 | Fee for grant paid | 04.09.2019 | Fee for publishing/printing paid | 18.09.2019 | Information about intention to grant a patent | 18.09.2019 | Receipt of the translation of the claim(s) | Opposition(s) | 07.08.2020 | No opposition filed within time limit [2020/42] | Fees paid | Renewal fee | 23.09.2019 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 14.09.2017 | AL | 06.11.2019 | AT | 06.11.2019 | CY | 06.11.2019 | CZ | 06.11.2019 | DK | 06.11.2019 | EE | 06.11.2019 | ES | 06.11.2019 | FI | 06.11.2019 | HR | 06.11.2019 | IT | 06.11.2019 | LT | 06.11.2019 | LV | 06.11.2019 | MC | 06.11.2019 | MK | 06.11.2019 | MT | 06.11.2019 | PL | 06.11.2019 | RO | 06.11.2019 | RS | 06.11.2019 | SE | 06.11.2019 | SI | 06.11.2019 | SK | 06.11.2019 | SM | 06.11.2019 | TR | 06.11.2019 | BG | 06.02.2020 | NO | 06.02.2020 | GR | 07.02.2020 | IS | 06.03.2020 | PT | 06.03.2020 | [2022/33] |
Former [2022/28] | HU | 14.09.2017 | |
AL | 06.11.2019 | ||
AT | 06.11.2019 | ||
CY | 06.11.2019 | ||
CZ | 06.11.2019 | ||
DK | 06.11.2019 | ||
EE | 06.11.2019 | ||
ES | 06.11.2019 | ||
FI | 06.11.2019 | ||
HR | 06.11.2019 | ||
IT | 06.11.2019 | ||
LT | 06.11.2019 | ||
LV | 06.11.2019 | ||
MC | 06.11.2019 | ||
MT | 06.11.2019 | ||
PL | 06.11.2019 | ||
RO | 06.11.2019 | ||
RS | 06.11.2019 | ||
SE | 06.11.2019 | ||
SI | 06.11.2019 | ||
SK | 06.11.2019 | ||
SM | 06.11.2019 | ||
TR | 06.11.2019 | ||
BG | 06.02.2020 | ||
NO | 06.02.2020 | ||
GR | 07.02.2020 | ||
IS | 06.03.2020 | ||
PT | 06.03.2020 | ||
Former [2022/27] | HU | 14.09.2017 | |
AL | 06.11.2019 | ||
AT | 06.11.2019 | ||
CY | 06.11.2019 | ||
CZ | 06.11.2019 | ||
DK | 06.11.2019 | ||
EE | 06.11.2019 | ||
ES | 06.11.2019 | ||
FI | 06.11.2019 | ||
HR | 06.11.2019 | ||
IT | 06.11.2019 | ||
LT | 06.11.2019 | ||
LV | 06.11.2019 | ||
MT | 06.11.2019 | ||
PL | 06.11.2019 | ||
RO | 06.11.2019 | ||
RS | 06.11.2019 | ||
SE | 06.11.2019 | ||
SI | 06.11.2019 | ||
SK | 06.11.2019 | ||
SM | 06.11.2019 | ||
TR | 06.11.2019 | ||
BG | 06.02.2020 | ||
NO | 06.02.2020 | ||
GR | 07.02.2020 | ||
IS | 06.03.2020 | ||
PT | 06.03.2020 | ||
Former [2021/10] | AL | 06.11.2019 | |
AT | 06.11.2019 | ||
CZ | 06.11.2019 | ||
DK | 06.11.2019 | ||
EE | 06.11.2019 | ||
ES | 06.11.2019 | ||
FI | 06.11.2019 | ||
HR | 06.11.2019 | ||
IT | 06.11.2019 | ||
LT | 06.11.2019 | ||
LV | 06.11.2019 | ||
PL | 06.11.2019 | ||
RO | 06.11.2019 | ||
RS | 06.11.2019 | ||
SE | 06.11.2019 | ||
SI | 06.11.2019 | ||
SK | 06.11.2019 | ||
SM | 06.11.2019 | ||
BG | 06.02.2020 | ||
NO | 06.02.2020 | ||
GR | 07.02.2020 | ||
IS | 06.03.2020 | ||
PT | 06.03.2020 | ||
Former [2020/51] | AL | 06.11.2019 | |
AT | 06.11.2019 | ||
CZ | 06.11.2019 | ||
DK | 06.11.2019 | ||
EE | 06.11.2019 | ||
ES | 06.11.2019 | ||
FI | 06.11.2019 | ||
HR | 06.11.2019 | ||
LT | 06.11.2019 | ||
LV | 06.11.2019 | ||
PL | 06.11.2019 | ||
RO | 06.11.2019 | ||
RS | 06.11.2019 | ||
SE | 06.11.2019 | ||
SI | 06.11.2019 | ||
SK | 06.11.2019 | ||
SM | 06.11.2019 | ||
BG | 06.02.2020 | ||
NO | 06.02.2020 | ||
GR | 07.02.2020 | ||
IS | 06.03.2020 | ||
PT | 06.03.2020 | ||
Former [2020/37] | AL | 06.11.2019 | |
CZ | 06.11.2019 | ||
DK | 06.11.2019 | ||
EE | 06.11.2019 | ||
ES | 06.11.2019 | ||
FI | 06.11.2019 | ||
HR | 06.11.2019 | ||
LT | 06.11.2019 | ||
LV | 06.11.2019 | ||
PL | 06.11.2019 | ||
RO | 06.11.2019 | ||
RS | 06.11.2019 | ||
SE | 06.11.2019 | ||
SK | 06.11.2019 | ||
SM | 06.11.2019 | ||
BG | 06.02.2020 | ||
NO | 06.02.2020 | ||
GR | 07.02.2020 | ||
IS | 06.03.2020 | ||
PT | 06.03.2020 | ||
Former [2020/36] | AL | 06.11.2019 | |
CZ | 06.11.2019 | ||
DK | 06.11.2019 | ||
EE | 06.11.2019 | ||
ES | 06.11.2019 | ||
FI | 06.11.2019 | ||
HR | 06.11.2019 | ||
LT | 06.11.2019 | ||
LV | 06.11.2019 | ||
PL | 06.11.2019 | ||
RO | 06.11.2019 | ||
RS | 06.11.2019 | ||
SE | 06.11.2019 | ||
BG | 06.02.2020 | ||
NO | 06.02.2020 | ||
GR | 07.02.2020 | ||
IS | 06.03.2020 | ||
PT | 06.03.2020 | ||
Former [2020/35] | AL | 06.11.2019 | |
CZ | 06.11.2019 | ||
ES | 06.11.2019 | ||
FI | 06.11.2019 | ||
HR | 06.11.2019 | ||
LT | 06.11.2019 | ||
LV | 06.11.2019 | ||
PL | 06.11.2019 | ||
RO | 06.11.2019 | ||
RS | 06.11.2019 | ||
SE | 06.11.2019 | ||
BG | 06.02.2020 | ||
NO | 06.02.2020 | ||
GR | 07.02.2020 | ||
IS | 06.03.2020 | ||
PT | 06.03.2020 | ||
Former [2020/34] | AL | 06.11.2019 | |
ES | 06.11.2019 | ||
FI | 06.11.2019 | ||
HR | 06.11.2019 | ||
LT | 06.11.2019 | ||
LV | 06.11.2019 | ||
PL | 06.11.2019 | ||
RS | 06.11.2019 | ||
SE | 06.11.2019 | ||
BG | 06.02.2020 | ||
NO | 06.02.2020 | ||
GR | 07.02.2020 | ||
IS | 06.03.2020 | ||
PT | 06.03.2020 | ||
Former [2020/32] | AL | 06.11.2019 | |
FI | 06.11.2019 | ||
HR | 06.11.2019 | ||
LT | 06.11.2019 | ||
LV | 06.11.2019 | ||
PL | 06.11.2019 | ||
RS | 06.11.2019 | ||
SE | 06.11.2019 | ||
BG | 06.02.2020 | ||
NO | 06.02.2020 | ||
GR | 07.02.2020 | ||
IS | 06.03.2020 | ||
PT | 06.03.2020 | ||
Former [2020/25] | FI | 06.11.2019 | |
HR | 06.11.2019 | ||
LT | 06.11.2019 | ||
LV | 06.11.2019 | ||
PL | 06.11.2019 | ||
RS | 06.11.2019 | ||
SE | 06.11.2019 | ||
BG | 06.02.2020 | ||
NO | 06.02.2020 | ||
GR | 07.02.2020 | ||
IS | 06.03.2020 | ||
PT | 06.03.2020 | ||
Former [2020/24] | FI | 06.11.2019 | |
LT | 06.11.2019 | ||
LV | 06.11.2019 | ||
PL | 06.11.2019 | ||
SE | 06.11.2019 | ||
BG | 06.02.2020 | ||
NO | 06.02.2020 | ||
GR | 07.02.2020 | ||
IS | 06.03.2020 | ||
PT | 06.03.2020 | ||
Former [2020/23] | FI | 06.11.2019 | |
LT | 06.11.2019 | ||
LV | 06.11.2019 | ||
PL | 06.11.2019 | ||
SE | 06.11.2019 | ||
BG | 06.02.2020 | ||
NO | 06.02.2020 | ||
GR | 07.02.2020 | ||
PT | 06.03.2020 | ||
Former [2020/22] | FI | 06.11.2019 | |
LT | 06.11.2019 | ||
SE | 06.11.2019 | ||
BG | 06.02.2020 | ||
NO | 06.02.2020 | ||
PT | 06.03.2020 | ||
Former [2020/21] | NO | 06.02.2020 | Documents cited: | Search | [A]US2014287754 (GOLDHAMER MARIANA [IL]) [A] 1-13 * column 1, line 39 - column 2, line 20 * * column 3, line 25 - column 4, line 28 * * column 4, line 55 - column 5, line 10 * * column 6, line 29 - line 46 * * column 7, line 64 - column 8, line 40 * * column 9, line 45 - column 10, line 17 ** column 10, line 56 - column 11, line 27 *; | [XYI]WO2015099587 (ERICSSON TELEFON AB L M [SE]) [X] 1,8 * page 6, line 19 - page 9, line 27 * * page 11, line 3 - line 17 * * page 13, line 3 - line 22 * [Y] 6,7,9 [I] 2-5,10-13; | [YA]WO2016134772 (NOKIA SOLUTIONS & NETWORKS OY [FI]) [Y] 6,7,9 * page 13, line 19 - page 14, line 19 * [A] 1,8; | [Y] - "Mobile Edge Computing (MEC); Framework and Reference Architecture", GROUP SPECIFICATION, EUROPEAN TELECOMMUNICATIONS STANDARDS INSTITUTE (ETSI), 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS ; FRANCE, (20160301), vol. MEC, no. V1.1.1, XP014274003 [Y] 1-13 * sections 7.1, A.1 and A.4.2.2 * | [Y] - ZTE CORPORATION, "MEC0018 v0.3.0 draft", vol. ISG - MEC - Mobile-Edge Computing, (20170322), pages 1 - 50, ETSI DRAFT; MEC(17)000220, EUROPEAN TELECOMMUNICATIONS STANDARDS INSTITUTE (ETSI), 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS ; FRANCE, URL: docbox.etsi.org\ISG\MEC\05-Contributions\2017\MEC(17)000220_MEC0018_v0_3_0_draft\MEC(17)000220_MEC0018_E2EMobility v030 draft\MEC-0018 E2EMobility v030 cm.docx, (20170322), XP014289563 [Y] 1-13 * section 4.3 * | by applicant | - H. M. PATEL; Y. HU; P. HEDE; I. B. M. J. JOUBERT; C. THORNTON; B. NAUGHTON; I. JULIAN; R. RAMOS; C. CHAN; V. YOUNG, "Mobile-Edge Computing (#9", ETSI White Pap., (20140000), vol. 11, no. 1, pages 1 - 36 | - M. GERLA, "Vehicular Cloud Computing", 2012 The 11th Annual Mediterranean Ad Hoc Networking Workshop (Med-Hoc-Net, (20120000), doi:doi:10.1109/MedHocNet.2012.6257116, pages 152 - 155, XP032214824 DOI: http://dx.doi.org/10.1109/MedHocNet.2012.6257116 | - M. H. CHEN; M. DONG; B. LIANG, "Joint offloading decision and resource allocation for mobile cloud with computing access point", ICASSP, IEEE International Conference on Acoustics, Speech and Signal Processing - Proceedings, 2016, vol. 2016-May, doi:doi:10.1109/ICASSP.2016.7472331, pages 3516 - 3520, XP032901257 DOI: http://dx.doi.org/10.1109/ICASSP.2016.7472331 | - K. ZHANG; Y. MAO; S. LENG; Q. ZHAO; L. LI; X. PENG; L. PAN; S. MAHARJAN; Y. ZHANG, "Energy-efficient offloading for mobile edge computing in 5G heterogeneous networks", IEEE Access, (20160000), no. 99 | - Y. MAO; J. ZHANG; K. B. LETAIEF, "Dynamic Computation Offloading for Mobile-Edge Computing with Energy Harvesting Devices", arXiv Prepr. arXivl605.05488, (20160000), vol. 8716, no. 16200214, pages 1 - 33 | - G. ORSINI; D. BADE; W. LAMERSDORF, "Computing at the Mobile Edge: Designing Elastic Android Applications for Computation Offloading", Proceedings - 2015 8th IFIP Wireless and Mobile Networking Conference, WMNC, (20150000), vol. 2016, doi:doi:10.1109/WMNC.2015.10, pages 112 - 119, XP032859807 DOI: http://dx.doi.org/10.1109/WMNC.2015.10 | - U. DROLIA; R. MARTINS; J. TAN; A. CHHEDA; M. SANGHAVI; R. GANDHI; P. NARASIMHAN, "The case for mobile edge-clouds", Proceedings - IEEE 10th International Conference on Ubiquitous Intelligence and Computing, UIC 2013 and IEEE 10th International Conference on Autonomic and Trusted Computing, ATC, (20130000), vol. 2013, doi:doi:10.1109/UIC-ATC.2013.94, pages 209 - 215, XP032561605 DOI: http://dx.doi.org/10.1109/UIC-ATC.2013.94 | - X. CHEN; L. JIAO; W. LI; X. FU, "Efficient multi-user computation offloading for mobile-edge cloud computing", IEEE/ACM Trans. Netw., no. 99, page 2015 |