blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3296517

EP3296517 - GEARED TURBOFAN FRONT CENTER BODY THERMAL MANAGEMENT [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  12.02.2021
Database last updated on 03.10.2024
FormerThe patent has been granted
Status updated on  21.02.2020
FormerGrant of patent is intended
Status updated on  03.10.2019
FormerExamination is in progress
Status updated on  07.02.2019
FormerRequest for examination was made
Status updated on  21.09.2018
FormerThe application has been published
Status updated on  16.02.2018
Most recent event   Tooltip15.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 17.08.2022  [2022/33]
Applicant(s)For all designated states
United Technologies Corporation
10 Farm Springs Road
Farmington, CT 06032 / US
[2018/12]
Inventor(s)01 / McCUNE, Michael E.
43 Hunters Court
Colchester, CT Connecticut 06415 / US
02 / SUCIU, Gabriel L.
27 Tanglewood Drive
Glastonbury, CT Connecticut 06033 / US
 [2018/12]
Representative(s)Dehns
10 Old Bailey
London EC4M 7NG / GB
[N/P]
Former [2020/13]Dehns
St. Bride's House
10 Salisbury Square
London EC4Y 8JD / GB
Former [2018/12]Gittins, Alex Michael
Dehns
St Bride's House
10 Salisbury Square
London EC4Y 8JD / GB
Application number, filing date17191555.618.09.2017
[2018/12]
Priority number, dateUS20161526934219.09.2016         Original published format: US201615269342
[2018/12]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3296517
Date:21.03.2018
Language:EN
[2018/12]
Type: B1 Patent specification 
No.:EP3296517
Date:25.03.2020
Language:EN
[2020/13]
Search report(s)(Supplementary) European search report - dispatched on:EP05.02.2018
ClassificationIPC:F01D9/06, F02C7/06, F02C7/18, F02C7/24
[2018/12]
CPC:
F01D9/06 (EP,US); F04D29/5853 (US); F02C7/06 (EP,US);
F02C7/14 (EP,US); F02C7/18 (EP,US); F02C7/24 (EP,US);
F02K3/06 (EP,US); F04D29/063 (US); F04D29/522 (US);
F04D29/542 (US); F05D2240/15 (EP,US); F05D2260/231 (EP,US);
F05D2260/40311 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/43]
Former [2018/12]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:THERMALMANAGEMENT EINES VORDEREN ZENTRALKÖRPERS EINES GETRIEBEFANS[2018/12]
English:GEARED TURBOFAN FRONT CENTER BODY THERMAL MANAGEMENT[2018/12]
French:GESTION THERMIQUE DE CORPS CENTRAL AVANT DE TURBORÉACTEUR À DOUBLE FLUX À ENGRENAGE[2018/12]
Examination procedure18.09.2017Date on which the examining division has become responsible
17.09.2018Amendment by applicant (claims and/or description)
17.09.2018Examination requested  [2018/43]
11.02.2019Despatch of a communication from the examining division (Time limit: M04)
20.06.2019Reply to a communication from the examining division
04.10.2019Communication of intention to grant the patent
12.02.2020Fee for grant paid
12.02.2020Fee for publishing/printing paid
12.02.2020Receipt of the translation of the claim(s)
Opposition(s)12.01.2021No opposition filed within time limit [2021/11]
Fees paidRenewal fee
19.09.2019Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU18.09.2017
AL25.03.2020
AT25.03.2020
CY25.03.2020
CZ25.03.2020
DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
MC25.03.2020
MK25.03.2020
MT25.03.2020
NL25.03.2020
PL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SI25.03.2020
SK25.03.2020
SM25.03.2020
TR25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
IE18.09.2020
LU18.09.2020
BE30.09.2020
CH30.09.2020
LI30.09.2020
[2022/31]
Former [2022/30]HU18.09.2017
AL25.03.2020
AT25.03.2020
CY25.03.2020
CZ25.03.2020
DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
MC25.03.2020
MT25.03.2020
NL25.03.2020
PL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SI25.03.2020
SK25.03.2020
SM25.03.2020
TR25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
IE18.09.2020
LU18.09.2020
BE30.09.2020
CH30.09.2020
LI30.09.2020
Former [2022/28]HU18.09.2017
AT25.03.2020
CY25.03.2020
CZ25.03.2020
DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
MC25.03.2020
MT25.03.2020
NL25.03.2020
PL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SI25.03.2020
SK25.03.2020
SM25.03.2020
TR25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
IE18.09.2020
LU18.09.2020
BE30.09.2020
CH30.09.2020
LI30.09.2020
Former [2022/27]HU18.09.2017
AT25.03.2020
CY25.03.2020
CZ25.03.2020
DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
MT25.03.2020
NL25.03.2020
PL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SI25.03.2020
SK25.03.2020
SM25.03.2020
TR25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
IE18.09.2020
LU18.09.2020
BE30.09.2020
CH30.09.2020
LI30.09.2020
Former [2021/37]AT25.03.2020
CZ25.03.2020
DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
NL25.03.2020
PL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SI25.03.2020
SK25.03.2020
SM25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
IE18.09.2020
LU18.09.2020
BE30.09.2020
CH30.09.2020
LI30.09.2020
Former [2021/36]AT25.03.2020
CZ25.03.2020
DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
NL25.03.2020
PL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SI25.03.2020
SK25.03.2020
SM25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
LU18.09.2020
BE30.09.2020
Former [2021/27]AT25.03.2020
CZ25.03.2020
DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
NL25.03.2020
PL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SI25.03.2020
SK25.03.2020
SM25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
LU18.09.2020
Former [2021/24]AT25.03.2020
CZ25.03.2020
DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
NL25.03.2020
PL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SI25.03.2020
SK25.03.2020
SM25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
Former [2021/10]AT25.03.2020
CZ25.03.2020
DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
NL25.03.2020
PL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SK25.03.2020
SM25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
Former [2021/09]AT25.03.2020
CZ25.03.2020
DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
NL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SK25.03.2020
SM25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
Former [2021/08]CZ25.03.2020
DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
LT25.03.2020
LV25.03.2020
NL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SK25.03.2020
SM25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
Former [2020/50]CZ25.03.2020
EE25.03.2020
FI25.03.2020
HR25.03.2020
LT25.03.2020
LV25.03.2020
NL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SK25.03.2020
SM25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
Former [2020/49]CZ25.03.2020
FI25.03.2020
HR25.03.2020
LT25.03.2020
LV25.03.2020
NL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SK25.03.2020
SM25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
Former [2020/48]FI25.03.2020
HR25.03.2020
LT25.03.2020
LV25.03.2020
NL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SM25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
Former [2020/47]FI25.03.2020
HR25.03.2020
LT25.03.2020
LV25.03.2020
NL25.03.2020
RS25.03.2020
SE25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
Former [2020/46]FI25.03.2020
HR25.03.2020
LV25.03.2020
NL25.03.2020
RS25.03.2020
SE25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
Former [2020/45]FI25.03.2020
HR25.03.2020
LV25.03.2020
NL25.03.2020
RS25.03.2020
SE25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
Former [2020/39]FI25.03.2020
HR25.03.2020
LV25.03.2020
RS25.03.2020
SE25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
Former [2020/38]FI25.03.2020
HR25.03.2020
LV25.03.2020
RS25.03.2020
SE25.03.2020
NO25.06.2020
GR26.06.2020
Former [2020/37]FI25.03.2020
HR25.03.2020
LV25.03.2020
RS25.03.2020
SE25.03.2020
NO25.06.2020
Former [2020/35]FI25.03.2020
NO25.06.2020
Documents cited:Search[A]US2012263579  (OTTO JOHN R [US], et al) [A] 1,2,7,10 * abstract *;
 [XA]US2014205447  (PATAT HARRY [US], et al) [X] 10,11 * paragraph [0032] - paragraph [0034] * * paragraph [0042] - paragraph [0049] * * paragraph [0052] * * figures 1-5 * [A] 1-3,12-15;
 [XA]US2015337682  (YEAGER WILLIAM [US], et al) [X] 10,11 * paragraph [0017] - paragraph [0020] * * figures 1-4 * [A] 1-3,12-15;
 [A]US2016108758  (DAVIS ALISHA M [US], et al) [A] 1-15 * paragraph [0034] - paragraph [0045] ** figures 1-4B *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.