blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3300818

EP3300818 - METHOD FOR SINTERING A DENTAL STRUCTURE AND ARRANGEMENT FOR SINTERING A DENTAL STRUCTURE [Right-click to bookmark this link]
Former [2018/14]METHOD FOR SINTERING A DENTAL STRUCTURE
[2019/46]
StatusNo opposition filed within time limit
Status updated on  13.11.2020
Database last updated on 16.09.2024
FormerThe patent has been granted
Status updated on  06.12.2019
FormerGrant of patent is intended
Status updated on  28.10.2019
FormerRequest for examination was made
Status updated on  15.06.2018
FormerThe application has been published
Status updated on  02.03.2018
Most recent event   Tooltip15.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 17.08.2022  [2022/33]
Applicant(s)For all designated states
STEGER, Heinrich
Giuseppe-Verdi-Strasse 18
39031 Bruneck / IT
[2018/14]
Inventor(s)01 / see applicant
...
 [2018/14]
Representative(s)Torggler & Hofmann Patentanwälte - Innsbruck
Torggler & Hofmann Patentanwälte GmbH & Co KG
Postfach 85
6020 Innsbruck / AT
[N/P]
Former [2018/14]Torggler & Hofinger Patentanwälte
Postfach 85
6010 Innsbruck / AT
Application number, filing date17192129.920.09.2017
[2018/14]
Priority number, dateAT2016005087028.09.2016         Original published format: AT 508702016
[2018/14]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3300818
Date:04.04.2018
Language:DE
[2018/14]
Type: B1 Patent specification 
No.:EP3300818
Date:08.01.2020
Language:DE
[2020/02]
Search report(s)(Supplementary) European search report - dispatched on:EP25.01.2018
ClassificationIPC:B22F3/00, A61C13/20, F27B17/02, B22F3/10
[2018/14]
CPC:
A61C13/20 (EP,AT); B22F3/003 (EP); B22F3/10 (AT);
B22F3/1007 (EP); B22F3/101 (AT); F27B5/04 (AT);
F27D5/0043 (EP,AT); B22F2003/1014 (EP,AT); B22F2005/005 (EP);
B22F2999/00 (EP) (-)
C-Set:
B22F2999/00, B22F3/10, B22F2201/50, B22F2201/20 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/29]
Former [2018/14]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:VERFAHREN ZUM SINTERN EINER DENTALKONSTRUKTION UND ANORDNUNG ZUM SINTERN EINER DENTALKONSTRUKTION[2018/14]
English:METHOD FOR SINTERING A DENTAL STRUCTURE AND ARRANGEMENT FOR SINTERING A DENTAL STRUCTURE[2019/46]
French:PROCÉDÉ DE FRITTAGE D'UNE STRUCTURE DENTAIRE ET DISPOSITIF DE FRITTAGE D'UNE STRUCTURE DENTAIRE[2019/46]
Former [2018/14]METHOD FOR SINTERING A DENTAL STRUCTURE
Former [2018/14]PROCÉDÉ DE FRITTAGE D'UNE STRUCTURE DENTAIRE
Examination procedure20.09.2017Date on which the examining division has become responsible
08.06.2018Amendment by applicant (claims and/or description)
08.06.2018Examination requested  [2018/29]
29.10.2019Communication of intention to grant the patent
03.12.2019Fee for grant paid
03.12.2019Fee for publishing/printing paid
03.12.2019Receipt of the translation of the claim(s)
Opposition(s)09.10.2020No opposition filed within time limit [2020/51]
Fees paidRenewal fee
23.09.2019Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU20.09.2017
AL08.01.2020
CY08.01.2020
CZ08.01.2020
DK08.01.2020
EE08.01.2020
FI08.01.2020
HR08.01.2020
LT08.01.2020
LV08.01.2020
MC08.01.2020
MK08.01.2020
MT08.01.2020
NL08.01.2020
PL08.01.2020
RO08.01.2020
RS08.01.2020
SE08.01.2020
SI08.01.2020
SK08.01.2020
SM08.01.2020
TR08.01.2020
BG08.04.2020
NO08.04.2020
GR09.04.2020
IS08.05.2020
PT31.05.2020
IE20.09.2020
LU20.09.2020
BE30.09.2020
CH30.09.2020
LI30.09.2020
[2022/31]
Former [2022/30]HU20.09.2017
AL08.01.2020
CY08.01.2020
CZ08.01.2020
DK08.01.2020
EE08.01.2020
FI08.01.2020
HR08.01.2020
LT08.01.2020
LV08.01.2020
MC08.01.2020
MT08.01.2020
NL08.01.2020
PL08.01.2020
RO08.01.2020
RS08.01.2020
SE08.01.2020
SI08.01.2020
SK08.01.2020
SM08.01.2020
TR08.01.2020
BG08.04.2020
NO08.04.2020
GR09.04.2020
IS08.05.2020
PT31.05.2020
IE20.09.2020
LU20.09.2020
BE30.09.2020
CH30.09.2020
LI30.09.2020
Former [2022/28]HU20.09.2017
CY08.01.2020
CZ08.01.2020
DK08.01.2020
EE08.01.2020
FI08.01.2020
HR08.01.2020
LT08.01.2020
LV08.01.2020
MC08.01.2020
MT08.01.2020
NL08.01.2020
PL08.01.2020
RO08.01.2020
RS08.01.2020
SE08.01.2020
SI08.01.2020
SK08.01.2020
SM08.01.2020
TR08.01.2020
BG08.04.2020
NO08.04.2020
GR09.04.2020
IS08.05.2020
PT31.05.2020
IE20.09.2020
LU20.09.2020
BE30.09.2020
CH30.09.2020
LI30.09.2020
Former [2022/27]HU20.09.2017
CY08.01.2020
CZ08.01.2020
DK08.01.2020
EE08.01.2020
FI08.01.2020
HR08.01.2020
LT08.01.2020
LV08.01.2020
MT08.01.2020
NL08.01.2020
PL08.01.2020
RO08.01.2020
RS08.01.2020
SE08.01.2020
SI08.01.2020
SK08.01.2020
SM08.01.2020
TR08.01.2020
BG08.04.2020
NO08.04.2020
GR09.04.2020
IS08.05.2020
PT31.05.2020
IE20.09.2020
LU20.09.2020
BE30.09.2020
CH30.09.2020
LI30.09.2020
Former [2021/37]CZ08.01.2020
DK08.01.2020
EE08.01.2020
FI08.01.2020
HR08.01.2020
LT08.01.2020
LV08.01.2020
NL08.01.2020
PL08.01.2020
RO08.01.2020
RS08.01.2020
SE08.01.2020
SI08.01.2020
SK08.01.2020
SM08.01.2020
BG08.04.2020
NO08.04.2020
GR09.04.2020
IS08.05.2020
PT31.05.2020
IE20.09.2020
LU20.09.2020
BE30.09.2020
CH30.09.2020
LI30.09.2020
Former [2021/36]CZ08.01.2020
DK08.01.2020
EE08.01.2020
FI08.01.2020
HR08.01.2020
LT08.01.2020
LV08.01.2020
NL08.01.2020
PL08.01.2020
RO08.01.2020
RS08.01.2020
SE08.01.2020
SI08.01.2020
SK08.01.2020
SM08.01.2020
BG08.04.2020
NO08.04.2020
GR09.04.2020
IS08.05.2020
PT31.05.2020
LU20.09.2020
BE30.09.2020
Former [2021/27]CZ08.01.2020
DK08.01.2020
EE08.01.2020
FI08.01.2020
HR08.01.2020
LT08.01.2020
LV08.01.2020
NL08.01.2020
PL08.01.2020
RO08.01.2020
RS08.01.2020
SE08.01.2020
SI08.01.2020
SK08.01.2020
SM08.01.2020
BG08.04.2020
NO08.04.2020
GR09.04.2020
IS08.05.2020
PT31.05.2020
LU20.09.2020
Former [2021/13]CZ08.01.2020
DK08.01.2020
EE08.01.2020
FI08.01.2020
HR08.01.2020
LT08.01.2020
LV08.01.2020
NL08.01.2020
PL08.01.2020
RO08.01.2020
RS08.01.2020
SE08.01.2020
SI08.01.2020
SK08.01.2020
SM08.01.2020
BG08.04.2020
NO08.04.2020
GR09.04.2020
IS08.05.2020
PT31.05.2020
Former [2020/50]CZ08.01.2020
DK08.01.2020
EE08.01.2020
FI08.01.2020
HR08.01.2020
LT08.01.2020
LV08.01.2020
NL08.01.2020
RO08.01.2020
RS08.01.2020
SE08.01.2020
SK08.01.2020
SM08.01.2020
BG08.04.2020
NO08.04.2020
GR09.04.2020
IS08.05.2020
PT31.05.2020
Former [2020/49]CZ08.01.2020
DK08.01.2020
FI08.01.2020
HR08.01.2020
LT08.01.2020
LV08.01.2020
NL08.01.2020
RO08.01.2020
RS08.01.2020
SE08.01.2020
SK08.01.2020
SM08.01.2020
BG08.04.2020
NO08.04.2020
GR09.04.2020
IS08.05.2020
PT31.05.2020
Former [2020/48]DK08.01.2020
FI08.01.2020
HR08.01.2020
LT08.01.2020
LV08.01.2020
NL08.01.2020
RO08.01.2020
RS08.01.2020
SE08.01.2020
SM08.01.2020
BG08.04.2020
NO08.04.2020
GR09.04.2020
IS08.05.2020
PT31.05.2020
Former [2020/47]DK08.01.2020
FI08.01.2020
HR08.01.2020
LT08.01.2020
LV08.01.2020
NL08.01.2020
RS08.01.2020
SE08.01.2020
BG08.04.2020
NO08.04.2020
GR09.04.2020
IS08.05.2020
PT31.05.2020
Former [2020/40]FI08.01.2020
HR08.01.2020
LT08.01.2020
LV08.01.2020
NL08.01.2020
RS08.01.2020
SE08.01.2020
BG08.04.2020
NO08.04.2020
GR09.04.2020
IS08.05.2020
PT31.05.2020
Former [2020/39]FI08.01.2020
HR08.01.2020
LT08.01.2020
LV08.01.2020
NL08.01.2020
RS08.01.2020
SE08.01.2020
BG08.04.2020
NO08.04.2020
GR09.04.2020
PT31.05.2020
Former [2020/38]FI08.01.2020
HR08.01.2020
LT08.01.2020
LV08.01.2020
NL08.01.2020
RS08.01.2020
SE08.01.2020
NO08.04.2020
GR09.04.2020
PT31.05.2020
Former [2020/37]FI08.01.2020
HR08.01.2020
LT08.01.2020
LV08.01.2020
NL08.01.2020
RS08.01.2020
SE08.01.2020
NO08.04.2020
PT31.05.2020
Former [2020/35]FI08.01.2020
LT08.01.2020
NL08.01.2020
NO08.04.2020
Former [2020/33]NL08.01.2020
Documents cited:Search[XI]EP2792332  (AMANN GIRRBACH AG [AT]) [X] 1-3,5-9,12-14 * paragraph [0001] - paragraph [0040]; figures 1-11 * [I] 10,11,15;
 [XI]US5911102  (TAKAHASHI SHOJI [JP], et al) [X] 1-9,12-15 * column 1 - column 18; figures 1, 2 * [I] 10,11;
 [X]WO02066693  (ISOTIS NV [NL], et al) [X] 1-15 * figures 1-18 *;
 [A]JPH06330105  (KAWASAKI STEEL CO) [A] 1-15 * abstract *
ExaminationDE102012019159
 EP2974689
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.