| EP3288208 - METHODS FOR ENHANCING COVERAGE [Right-click to bookmark this link] | |||
| Former [2018/09] | METHOD AND APPARATUS FOR ENHANCING COVERAGE | ||
| [2020/41] | Status | No opposition filed within time limit Status updated on 29.04.2022 Database last updated on 21.03.2026 | |
| Former | The patent has been granted Status updated on 21.05.2021 | ||
| Former | Grant of patent is intended Status updated on 12.02.2021 | ||
| Former | Examination is in progress Status updated on 25.01.2021 | ||
| Former | Grant of patent is intended Status updated on 17.09.2020 | ||
| Former | Examination is in progress Status updated on 18.04.2020 | ||
| Former | Request for examination was made Status updated on 26.01.2018 | Most recent event Tooltip | 19.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 21.01.2026 [2026/04] | Applicant(s) | For all designated states NEC Corporation 7-1, Shiba 5-chome Minato-ku Tokyo 108-8001 / JP | [2019/15] |
| Former [2018/09] | For all designated states NEC (China) Co., Ltd. 20/F Shining Tower No. 35 Xueyuan Road Haidian District Beijing 100191 / CN | Inventor(s) | 01 /
Wang, Gang 11F. Bldg. A, Innovation Plaza Tsinghua Science Park Haidan District Beijing 100084 / CN | 02 /
Sun, Zhennian 11F. Bldg. A, Innovation Plaza Tsinghua Science Park Haidan District Beijing 100084 / CN | 03 /
Lei, Ming 11F. Bldg. A, Innovation Plaza Tsinghua Science Park Haidan District Beijing 100084 / CN | [2018/09] | Representative(s) | Vossius & Partner Patentanwälte Rechtsanwälte mbB Siebertstrasse 3 81675 München / DE | [2018/09] | Application number, filing date | 17192213.1 | 25.09.2012 | [2018/09] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3288208 | Date: | 28.02.2018 | Language: | EN | [2018/09] | Type: | B1 Patent specification | No.: | EP3288208 | Date: | 23.06.2021 | Language: | EN | [2021/25] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 16.01.2018 | Classification | IPC: | H04L1/18, H04W72/04, H04W24/02 | [2018/09] | CPC: |
H04W72/0446 (EP,CN,US);
H04W24/02 (US);
H04L1/18 (US);
H04L1/1819 (EP,US);
H04L1/1887 (EP,US);
H04L5/14 (US);
H04W72/20 (EP,CN,US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/02] |
| Former [2018/09] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VERFAHREN ZUR VERBESSERUNG EINER ABDECKUNG | [2020/41] | English: | METHODS FOR ENHANCING COVERAGE | [2020/41] | French: | PROCÉDÉS D'AMÉLIORATION DE COUVERTURE | [2020/41] |
| Former [2018/09] | VERFAHREN UND VORRICHTUNG ZUR VERBESSERUNG EINER ABDECKUNG | ||
| Former [2018/09] | METHOD AND APPARATUS FOR ENHANCING COVERAGE | ||
| Former [2018/09] | PROCÉDÉ ET APPAREIL D'AMÉLIORATION DE COUVERTURE | Examination procedure | 20.09.2017 | Date on which the examining division has become responsible | 25.09.2017 | Examination requested [2018/09] | 05.10.2018 | Despatch of communication that the application is deemed to be withdrawn, reason: examination fee not paid in time | 28.11.2018 | Amendment by applicant (claims and/or description) | 22.04.2020 | Despatch of a communication from the examining division (Time limit: M04) | 31.07.2020 | Reply to a communication from the examining division | 18.09.2020 | Communication of intention to grant the patent | 22.01.2021 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 22.01.2021 | Fee for grant paid | 22.01.2021 | Fee for publishing/printing paid | 22.02.2021 | Communication of intention to grant the patent | 14.05.2021 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP12885559.0 / EP2823594 | Opposition(s) | 24.03.2022 | No opposition filed within time limit [2022/22] | Request for further processing for: | The application is deemed to be withdrawn due to failure to reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report/Supplementary European search report | 28.11.2018 | Request for further processing filed | 28.11.2018 | Full payment received (date of receipt of payment) Request granted | 10.12.2018 | Decision despatched | The application is deemed to be withdrawn due to non-payment of designation fees TR, SM, SK, SI, SE, RS, RO, PT, PL, NO, NL, MT, MK, MC, LV, LU, LT, IT, IS, IE, HU, HR, GR, GB, FR, FI, ES, EE, DK, DE, CZ, CY, CH, BG, BE, AT, AL | 28.11.2018 | Request for further processing filed | 28.11.2018 | Full payment received (date of receipt of payment) Request granted | 10.12.2018 | Decision despatched | Fees paid | Renewal fee | 30.11.2017 | Renewal fee patent year 03 | 30.11.2017 | Renewal fee patent year 04 | 30.11.2017 | Renewal fee patent year 05 | 30.11.2017 | Renewal fee patent year 06 | 24.09.2018 | Renewal fee patent year 07 | 24.09.2019 | Renewal fee patent year 08 | 23.09.2020 | Renewal fee patent year 09 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 25.09.2012 | AL | 23.06.2021 | AT | 23.06.2021 | CY | 23.06.2021 | CZ | 23.06.2021 | DK | 23.06.2021 | EE | 23.06.2021 | ES | 23.06.2021 | FI | 23.06.2021 | HR | 23.06.2021 | IT | 23.06.2021 | LT | 23.06.2021 | LV | 23.06.2021 | MC | 23.06.2021 | MK | 23.06.2021 | MT | 23.06.2021 | NL | 23.06.2021 | PL | 23.06.2021 | RO | 23.06.2021 | RS | 23.06.2021 | SE | 23.06.2021 | SI | 23.06.2021 | SK | 23.06.2021 | SM | 23.06.2021 | TR | 23.06.2021 | BG | 23.09.2021 | NO | 23.09.2021 | GR | 24.09.2021 | IE | 25.09.2021 | LU | 25.09.2021 | BE | 30.09.2021 | CH | 30.09.2021 | LI | 30.09.2021 | IS | 23.10.2021 | PT | 25.10.2021 | [2026/04] |
| Former [2024/41] | HU | 25.09.2012 | |
| AL | 23.06.2021 | ||
| AT | 23.06.2021 | ||
| CY | 23.06.2021 | ||
| CZ | 23.06.2021 | ||
| DK | 23.06.2021 | ||
| EE | 23.06.2021 | ||
| ES | 23.06.2021 | ||
| FI | 23.06.2021 | ||
| HR | 23.06.2021 | ||
| IT | 23.06.2021 | ||
| LT | 23.06.2021 | ||
| LV | 23.06.2021 | ||
| MC | 23.06.2021 | ||
| MK | 23.06.2021 | ||
| MT | 23.06.2021 | ||
| NL | 23.06.2021 | ||
| PL | 23.06.2021 | ||
| RO | 23.06.2021 | ||
| RS | 23.06.2021 | ||
| SE | 23.06.2021 | ||
| SI | 23.06.2021 | ||
| SK | 23.06.2021 | ||
| SM | 23.06.2021 | ||
| BG | 23.09.2021 | ||
| NO | 23.09.2021 | ||
| GR | 24.09.2021 | ||
| IE | 25.09.2021 | ||
| LU | 25.09.2021 | ||
| BE | 30.09.2021 | ||
| CH | 30.09.2021 | ||
| LI | 30.09.2021 | ||
| IS | 23.10.2021 | ||
| PT | 25.10.2021 | ||
| Former [2024/22] | HU | 25.09.2012 | |
| AL | 23.06.2021 | ||
| AT | 23.06.2021 | ||
| CY | 23.06.2021 | ||
| CZ | 23.06.2021 | ||
| DK | 23.06.2021 | ||
| EE | 23.06.2021 | ||
| ES | 23.06.2021 | ||
| FI | 23.06.2021 | ||
| HR | 23.06.2021 | ||
| IT | 23.06.2021 | ||
| LT | 23.06.2021 | ||
| LV | 23.06.2021 | ||
| MC | 23.06.2021 | ||
| MK | 23.06.2021 | ||
| NL | 23.06.2021 | ||
| PL | 23.06.2021 | ||
| RO | 23.06.2021 | ||
| RS | 23.06.2021 | ||
| SE | 23.06.2021 | ||
| SI | 23.06.2021 | ||
| SK | 23.06.2021 | ||
| SM | 23.06.2021 | ||
| BG | 23.09.2021 | ||
| NO | 23.09.2021 | ||
| GR | 24.09.2021 | ||
| IE | 25.09.2021 | ||
| LU | 25.09.2021 | ||
| BE | 30.09.2021 | ||
| CH | 30.09.2021 | ||
| LI | 30.09.2021 | ||
| IS | 23.10.2021 | ||
| PT | 25.10.2021 | ||
| Former [2023/29] | HU | 25.09.2012 | |
| AL | 23.06.2021 | ||
| AT | 23.06.2021 | ||
| CY | 23.06.2021 | ||
| CZ | 23.06.2021 | ||
| DK | 23.06.2021 | ||
| EE | 23.06.2021 | ||
| ES | 23.06.2021 | ||
| FI | 23.06.2021 | ||
| HR | 23.06.2021 | ||
| IT | 23.06.2021 | ||
| LT | 23.06.2021 | ||
| LV | 23.06.2021 | ||
| MC | 23.06.2021 | ||
| NL | 23.06.2021 | ||
| PL | 23.06.2021 | ||
| RO | 23.06.2021 | ||
| RS | 23.06.2021 | ||
| SE | 23.06.2021 | ||
| SI | 23.06.2021 | ||
| SK | 23.06.2021 | ||
| SM | 23.06.2021 | ||
| BG | 23.09.2021 | ||
| NO | 23.09.2021 | ||
| GR | 24.09.2021 | ||
| IE | 25.09.2021 | ||
| LU | 25.09.2021 | ||
| BE | 30.09.2021 | ||
| CH | 30.09.2021 | ||
| LI | 30.09.2021 | ||
| IS | 23.10.2021 | ||
| PT | 25.10.2021 | ||
| Former [2023/24] | AL | 23.06.2021 | |
| AT | 23.06.2021 | ||
| CY | 23.06.2021 | ||
| CZ | 23.06.2021 | ||
| DK | 23.06.2021 | ||
| EE | 23.06.2021 | ||
| ES | 23.06.2021 | ||
| FI | 23.06.2021 | ||
| HR | 23.06.2021 | ||
| IT | 23.06.2021 | ||
| LT | 23.06.2021 | ||
| LV | 23.06.2021 | ||
| MC | 23.06.2021 | ||
| NL | 23.06.2021 | ||
| PL | 23.06.2021 | ||
| RO | 23.06.2021 | ||
| RS | 23.06.2021 | ||
| SE | 23.06.2021 | ||
| SI | 23.06.2021 | ||
| SK | 23.06.2021 | ||
| SM | 23.06.2021 | ||
| BG | 23.09.2021 | ||
| NO | 23.09.2021 | ||
| GR | 24.09.2021 | ||
| IE | 25.09.2021 | ||
| LU | 25.09.2021 | ||
| BE | 30.09.2021 | ||
| CH | 30.09.2021 | ||
| LI | 30.09.2021 | ||
| IS | 23.10.2021 | ||
| PT | 25.10.2021 | ||
| Former [2022/37] | AL | 23.06.2021 | |
| AT | 23.06.2021 | ||
| CZ | 23.06.2021 | ||
| DK | 23.06.2021 | ||
| EE | 23.06.2021 | ||
| ES | 23.06.2021 | ||
| FI | 23.06.2021 | ||
| HR | 23.06.2021 | ||
| IT | 23.06.2021 | ||
| LT | 23.06.2021 | ||
| LV | 23.06.2021 | ||
| MC | 23.06.2021 | ||
| NL | 23.06.2021 | ||
| PL | 23.06.2021 | ||
| RO | 23.06.2021 | ||
| RS | 23.06.2021 | ||
| SE | 23.06.2021 | ||
| SI | 23.06.2021 | ||
| SK | 23.06.2021 | ||
| SM | 23.06.2021 | ||
| BG | 23.09.2021 | ||
| NO | 23.09.2021 | ||
| GR | 24.09.2021 | ||
| IE | 25.09.2021 | ||
| LU | 25.09.2021 | ||
| BE | 30.09.2021 | ||
| CH | 30.09.2021 | ||
| LI | 30.09.2021 | ||
| IS | 23.10.2021 | ||
| PT | 25.10.2021 | ||
| Former [2022/36] | AL | 23.06.2021 | |
| AT | 23.06.2021 | ||
| CZ | 23.06.2021 | ||
| DK | 23.06.2021 | ||
| EE | 23.06.2021 | ||
| ES | 23.06.2021 | ||
| FI | 23.06.2021 | ||
| HR | 23.06.2021 | ||
| IT | 23.06.2021 | ||
| LT | 23.06.2021 | ||
| LV | 23.06.2021 | ||
| MC | 23.06.2021 | ||
| NL | 23.06.2021 | ||
| PL | 23.06.2021 | ||
| RO | 23.06.2021 | ||
| RS | 23.06.2021 | ||
| SE | 23.06.2021 | ||
| SI | 23.06.2021 | ||
| SK | 23.06.2021 | ||
| SM | 23.06.2021 | ||
| BG | 23.09.2021 | ||
| NO | 23.09.2021 | ||
| GR | 24.09.2021 | ||
| IE | 25.09.2021 | ||
| LU | 25.09.2021 | ||
| BE | 30.09.2021 | ||
| IS | 23.10.2021 | ||
| PT | 25.10.2021 | ||
| Former [2022/35] | AL | 23.06.2021 | |
| AT | 23.06.2021 | ||
| CZ | 23.06.2021 | ||
| DK | 23.06.2021 | ||
| EE | 23.06.2021 | ||
| ES | 23.06.2021 | ||
| FI | 23.06.2021 | ||
| HR | 23.06.2021 | ||
| LT | 23.06.2021 | ||
| LV | 23.06.2021 | ||
| MC | 23.06.2021 | ||
| NL | 23.06.2021 | ||
| PL | 23.06.2021 | ||
| RO | 23.06.2021 | ||
| RS | 23.06.2021 | ||
| SE | 23.06.2021 | ||
| SI | 23.06.2021 | ||
| SK | 23.06.2021 | ||
| SM | 23.06.2021 | ||
| BG | 23.09.2021 | ||
| NO | 23.09.2021 | ||
| GR | 24.09.2021 | ||
| IE | 25.09.2021 | ||
| LU | 25.09.2021 | ||
| BE | 30.09.2021 | ||
| IS | 23.10.2021 | ||
| PT | 25.10.2021 | ||
| Former [2022/34] | AL | 23.06.2021 | |
| AT | 23.06.2021 | ||
| CZ | 23.06.2021 | ||
| DK | 23.06.2021 | ||
| EE | 23.06.2021 | ||
| ES | 23.06.2021 | ||
| FI | 23.06.2021 | ||
| HR | 23.06.2021 | ||
| LT | 23.06.2021 | ||
| LV | 23.06.2021 | ||
| MC | 23.06.2021 | ||
| NL | 23.06.2021 | ||
| PL | 23.06.2021 | ||
| RO | 23.06.2021 | ||
| RS | 23.06.2021 | ||
| SE | 23.06.2021 | ||
| SI | 23.06.2021 | ||
| SK | 23.06.2021 | ||
| SM | 23.06.2021 | ||
| BG | 23.09.2021 | ||
| NO | 23.09.2021 | ||
| GR | 24.09.2021 | ||
| LU | 25.09.2021 | ||
| BE | 30.09.2021 | ||
| IS | 23.10.2021 | ||
| PT | 25.10.2021 | ||
| Former [2022/29] | AL | 23.06.2021 | |
| AT | 23.06.2021 | ||
| CZ | 23.06.2021 | ||
| DK | 23.06.2021 | ||
| EE | 23.06.2021 | ||
| ES | 23.06.2021 | ||
| FI | 23.06.2021 | ||
| HR | 23.06.2021 | ||
| LT | 23.06.2021 | ||
| LV | 23.06.2021 | ||
| MC | 23.06.2021 | ||
| NL | 23.06.2021 | ||
| PL | 23.06.2021 | ||
| RO | 23.06.2021 | ||
| RS | 23.06.2021 | ||
| SE | 23.06.2021 | ||
| SI | 23.06.2021 | ||
| SK | 23.06.2021 | ||
| SM | 23.06.2021 | ||
| BG | 23.09.2021 | ||
| NO | 23.09.2021 | ||
| GR | 24.09.2021 | ||
| IS | 23.10.2021 | ||
| PT | 25.10.2021 | ||
| Former [2022/25] | AL | 23.06.2021 | |
| AT | 23.06.2021 | ||
| CZ | 23.06.2021 | ||
| DK | 23.06.2021 | ||
| EE | 23.06.2021 | ||
| ES | 23.06.2021 | ||
| FI | 23.06.2021 | ||
| HR | 23.06.2021 | ||
| LT | 23.06.2021 | ||
| LV | 23.06.2021 | ||
| MC | 23.06.2021 | ||
| NL | 23.06.2021 | ||
| PL | 23.06.2021 | ||
| RO | 23.06.2021 | ||
| RS | 23.06.2021 | ||
| SE | 23.06.2021 | ||
| SK | 23.06.2021 | ||
| SM | 23.06.2021 | ||
| BG | 23.09.2021 | ||
| NO | 23.09.2021 | ||
| GR | 24.09.2021 | ||
| IS | 23.10.2021 | ||
| PT | 25.10.2021 | ||
| Former [2022/21] | AT | 23.06.2021 | |
| CZ | 23.06.2021 | ||
| DK | 23.06.2021 | ||
| EE | 23.06.2021 | ||
| ES | 23.06.2021 | ||
| FI | 23.06.2021 | ||
| HR | 23.06.2021 | ||
| LT | 23.06.2021 | ||
| LV | 23.06.2021 | ||
| NL | 23.06.2021 | ||
| PL | 23.06.2021 | ||
| RO | 23.06.2021 | ||
| RS | 23.06.2021 | ||
| SE | 23.06.2021 | ||
| SK | 23.06.2021 | ||
| SM | 23.06.2021 | ||
| BG | 23.09.2021 | ||
| NO | 23.09.2021 | ||
| GR | 24.09.2021 | ||
| IS | 23.10.2021 | ||
| PT | 25.10.2021 | ||
| Former [2022/10] | AT | 23.06.2021 | |
| CZ | 23.06.2021 | ||
| EE | 23.06.2021 | ||
| ES | 23.06.2021 | ||
| FI | 23.06.2021 | ||
| HR | 23.06.2021 | ||
| LT | 23.06.2021 | ||
| LV | 23.06.2021 | ||
| NL | 23.06.2021 | ||
| PL | 23.06.2021 | ||
| RO | 23.06.2021 | ||
| RS | 23.06.2021 | ||
| SE | 23.06.2021 | ||
| SK | 23.06.2021 | ||
| SM | 23.06.2021 | ||
| BG | 23.09.2021 | ||
| NO | 23.09.2021 | ||
| GR | 24.09.2021 | ||
| IS | 23.10.2021 | ||
| PT | 25.10.2021 | ||
| Former [2022/09] | AT | 23.06.2021 | |
| CZ | 23.06.2021 | ||
| ES | 23.06.2021 | ||
| FI | 23.06.2021 | ||
| HR | 23.06.2021 | ||
| LT | 23.06.2021 | ||
| LV | 23.06.2021 | ||
| NL | 23.06.2021 | ||
| RO | 23.06.2021 | ||
| RS | 23.06.2021 | ||
| SE | 23.06.2021 | ||
| SK | 23.06.2021 | ||
| SM | 23.06.2021 | ||
| BG | 23.09.2021 | ||
| NO | 23.09.2021 | ||
| GR | 24.09.2021 | ||
| PT | 25.10.2021 | ||
| Former [2022/08] | AT | 23.06.2021 | |
| CZ | 23.06.2021 | ||
| ES | 23.06.2021 | ||
| FI | 23.06.2021 | ||
| HR | 23.06.2021 | ||
| LT | 23.06.2021 | ||
| LV | 23.06.2021 | ||
| NL | 23.06.2021 | ||
| RS | 23.06.2021 | ||
| SE | 23.06.2021 | ||
| SM | 23.06.2021 | ||
| BG | 23.09.2021 | ||
| NO | 23.09.2021 | ||
| GR | 24.09.2021 | ||
| Former [2022/07] | AT | 23.06.2021 | |
| FI | 23.06.2021 | ||
| HR | 23.06.2021 | ||
| LT | 23.06.2021 | ||
| LV | 23.06.2021 | ||
| NL | 23.06.2021 | ||
| RS | 23.06.2021 | ||
| SE | 23.06.2021 | ||
| SM | 23.06.2021 | ||
| BG | 23.09.2021 | ||
| NO | 23.09.2021 | ||
| GR | 24.09.2021 | ||
| Former [2021/51] | FI | 23.06.2021 | |
| HR | 23.06.2021 | ||
| LT | 23.06.2021 | ||
| LV | 23.06.2021 | ||
| RS | 23.06.2021 | ||
| SE | 23.06.2021 | ||
| BG | 23.09.2021 | ||
| NO | 23.09.2021 | ||
| GR | 24.09.2021 | ||
| Former [2021/49] | FI | 23.06.2021 | |
| HR | 23.06.2021 | ||
| LT | 23.06.2021 | ||
| LV | 23.06.2021 | ||
| SE | 23.06.2021 | ||
| BG | 23.09.2021 | ||
| NO | 23.09.2021 | ||
| GR | 24.09.2021 | ||
| Former [2021/47] | FI | 23.06.2021 | |
| LT | 23.06.2021 | ||
| BG | 23.09.2021 | ||
| Former [2021/46] | FI | 23.06.2021 | |
| LT | 23.06.2021 | Documents cited: | Search | [Y] "3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); LTE coverage enhancements (Release 11)", 3GPP STANDARD ; TECHNICAL REPORT ; 3GPP TR 36.824, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG1, no. V11.0.0, 26 June 2012 (2012-06-26), pages 1 - 18, XP051292375 [Y] 1-28 * paragraphs [006.] , [ 6.2.1] * | [Y] SAMSUNG: "Additional special subframe configuration for LTE TDD", 3GPP DRAFT; R1-121651, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG1, no. Jeju, Korea; 20120326 - 20120330, 20 March 2012 (2012-03-20), XP050599914 [Y] 1-28 * paragraphs [002.] , [0 5.] * | [A] ASUSTEK: "Clarification on UE behaviour at TTI bundling configuration", 3GPP DRAFT; CR FOR R2-086144 CLARIFICATION ON UE BEHAVIOUR AT TTI BUNDLING CONFIGURATION -ALT2, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, no. Prague, Czech Republic; 20081104, 4 November 2008 (2008-11-04), XP050321052 [A] 1-28 * page 1, paragraph 5.4.1 * | [A] CMCC: "Coverage enhancement for TTI bundling", 3GPP DRAFT; R1-122719_COVERAGE ENHANCEMNET FOR TTI BUNDLING-FINAL, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG1, no. Prague, Czech Republic; 20120521 - 20120525, 12 May 2012 (2012-05-12), XP050600902 [A] 1-28 * paragraph [004.] * |