blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3299091

EP3299091 - METHOD FOR MANUFACTURING A SLOTTED BEARING HOUSING [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  03.07.2020
Database last updated on 20.07.2024
FormerThe patent has been granted
Status updated on  28.06.2019
FormerGrant of patent is intended
Status updated on  18.03.2019
FormerRequest for examination was made
Status updated on  14.09.2018
FormerThe application has been published
Status updated on  23.02.2018
Most recent event   Tooltip23.07.2021Lapse of the patent in a contracting state
New state(s): MT
published on 25.08.2021  [2021/34]
Applicant(s)For all designated states
VORWERK AUTOTEC GmbH & Co. KG
Obere Lichtenplatzer Strasse 336
42287 Wuppertal / DE
[2018/13]
Inventor(s)01 / Beneker, Wilfried
Unterberger Wiesen 13
42799 Leichlingen / DE
02 / Röder, Frank
Hasslinghauser Straße 70b
45549 Sprockhövel / DE
 [2018/13]
Representative(s)Lippert Stachow Patentanwälte Rechtsanwälte
Partnerschaft mbB
Postfach 30 02 08
51412 Bergisch Gladbach / DE
[2018/13]
Application number, filing date17192311.321.09.2017
[2018/13]
Priority number, dateDE20161011776421.09.2016         Original published format: DE102016117764
[2018/13]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3299091
Date:28.03.2018
Language:DE
[2018/13]
Type: B1 Patent specification 
No.:EP3299091
Date:31.07.2019
Language:DE
[2019/31]
Search report(s)(Supplementary) European search report - dispatched on:EP06.02.2018
ClassificationIPC:B21D5/14, B21D53/10, F16F1/38, // B21C37/30
[2018/13]
CPC:
B21D5/146 (EP); B21D53/10 (EP); F16F1/3842 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/42]
Former [2018/13]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:VERFAHREN ZUR HERSTELLUNG EINER GESCHLITZTEN BUCHSENLAGERHÜLSE[2018/13]
English:METHOD FOR MANUFACTURING A SLOTTED BEARING HOUSING[2018/13]
French:PROCÉDÉ DE FABRICATION D'UNE DOUILLE DE PALIER FENDUE[2018/13]
Examination procedure21.09.2017Date on which the examining division has become responsible
11.09.2018Amendment by applicant (claims and/or description)
11.09.2018Examination requested  [2018/42]
19.03.2019Communication of intention to grant the patent
17.06.2019Fee for grant paid
17.06.2019Fee for publishing/printing paid
17.06.2019Receipt of the translation of the claim(s)
Opposition(s)03.06.2020No opposition filed within time limit [2020/32]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAL31.07.2019
CY31.07.2019
DK31.07.2019
FI31.07.2019
MC31.07.2019
MT31.07.2019
NL31.07.2019
SM31.07.2019
IE21.09.2019
LU21.09.2019
IS30.10.2019
NO31.10.2019
GR01.11.2019
[2021/34]
Former [2021/26]AL31.07.2019
CY31.07.2019
DK31.07.2019
FI31.07.2019
MC31.07.2019
NL31.07.2019
SM31.07.2019
IE21.09.2019
LU21.09.2019
IS30.10.2019
NO31.10.2019
GR01.11.2019
Former [2020/36]AL31.07.2019
DK31.07.2019
FI31.07.2019
MC31.07.2019
NL31.07.2019
SM31.07.2019
IE21.09.2019
LU21.09.2019
IS30.10.2019
NO31.10.2019
GR01.11.2019
Former [2020/35]AL31.07.2019
DK31.07.2019
FI31.07.2019
MC31.07.2019
NL31.07.2019
SM31.07.2019
LU21.09.2019
NO31.10.2019
GR01.11.2019
IS24.02.2020
Former [2020/28]AL31.07.2019
DK31.07.2019
FI31.07.2019
MC31.07.2019
NL31.07.2019
SM31.07.2019
NO31.10.2019
GR01.11.2019
IS24.02.2020
Former [2020/24]AL31.07.2019
DK31.07.2019
FI31.07.2019
MC31.07.2019
NL31.07.2019
NO31.10.2019
GR01.11.2019
IS24.02.2020
Former [2020/22]AL31.07.2019
DK31.07.2019
FI31.07.2019
NL31.07.2019
NO31.10.2019
GR01.11.2019
IS30.11.2019
Former [2020/15]AL31.07.2019
FI31.07.2019
NL31.07.2019
NO31.10.2019
GR01.11.2019
IS30.11.2019
Former [2020/12]FI31.07.2019
NL31.07.2019
NO31.10.2019
GR01.11.2019
IS30.11.2019
Former [2020/09]FI31.07.2019
NL31.07.2019
NO31.10.2019
Former [2020/08]NO31.10.2019
Documents cited:Search[X]JPS59179249  (TAIHO KOGYO CO LTD) [X] 14* abstract *;
 [XA]JPS60145223  (MOCHIZUKI MASANORI) [X] 14 * abstract * [A] 1-13;
 [XA]EP0529629  (NEWAY CORP [US]) [X] 13 * column 7, lines 14-17; figure 1 * [A] 1-12,14;
 [XA]JP2012183577  (TOGO SEISAKUSHO KK) [X] 14 * abstract * [A] 1-13;
 [XA]DE102014108972  (VORWERK AUTOTEC GMBH & CO KG [DE]) [X] 13 * paragraph [0048]; figures 5,6 * [A] 1-12,14
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.