EP3305100 - DEVICE AND METHOD FOR MERGING TWO MASS FLOWS MADE FROM ROD SHAPED PRODUCTS IN THE TOBACCO INDUSTRY [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 25.03.2022 Database last updated on 20.07.2024 | |
Former | The patent has been granted Status updated on 16.04.2021 | ||
Former | Grant of patent is intended Status updated on 01.12.2020 | ||
Former | Examination is in progress Status updated on 26.04.2019 | ||
Former | Request for examination was made Status updated on 21.09.2018 | ||
Former | The application has been published Status updated on 09.03.2018 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states Hauni Maschinenbau GmbH Kurt-A.-Körber-Chaussee 8-32 21033 Hamburg / DE | [2018/15] | Inventor(s) | 01 /
HARTMANN, Florian Fährstraße 56 21502 Geesthacht / DE | 02 /
HOYER, Viktoria Josef-von-Scheffel-Weg 7 21502 Geesthacht / DE | 03 /
ROOSE, Jan Ohnsorgweg 38 22605 Hamburg / DE | [2018/15] | Representative(s) | Müller Verweyen Patentanwälte Friedensallee 290 22763 Hamburg / DE | [2018/15] | Application number, filing date | 17192616.5 | 22.09.2017 | [2018/15] | Priority number, date | DE201610119067 | 07.10.2016 Original published format: DE102016119067 | [2018/15] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3305100 | Date: | 11.04.2018 | Language: | DE | [2018/15] | Type: | B1 Patent specification | No.: | EP3305100 | Date: | 19.05.2021 | Language: | DE | [2021/20] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 03.01.2018 | Classification | IPC: | A24C5/35 | [2018/15] | CPC: |
A24C5/35 (EP,CN);
B65G47/68 (CN);
B65G2201/0226 (CN)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/43] |
Former [2018/15] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VORRICHTUNG UND VERFAHREN ZUM ZUSAMMENFÜHREN VON ZWEI MASSENSTRÖMEN AUS STABFÖRMIGEN ARTIKELN DER TABAKVERARBEITENDEN INDUSTRIE | [2018/15] | English: | DEVICE AND METHOD FOR MERGING TWO MASS FLOWS MADE FROM ROD SHAPED PRODUCTS IN THE TOBACCO INDUSTRY | [2018/15] | French: | DISPOSITIF ET PROCÉDÉ POUR RÉUNIR DEUX FLUX D'ARTICLES EN FORME DE TIGE DANS L'INDUSTRIE DU TABAC | [2021/01] |
Former [2018/15] | DISPOSITIF ET PROCÉDÉ POUR REUNIR DEUX FLUX D'ARTICLES EN FORME DE TIGE DANS L'INDUSTRIE DU TABAC | Examination procedure | 22.09.2017 | Date on which the examining division has become responsible | 17.09.2018 | Amendment by applicant (claims and/or description) | 17.09.2018 | Examination requested [2018/43] | 15.02.2019 | Observations by third parties | 30.04.2019 | Despatch of a communication from the examining division (Time limit: M04) | 30.07.2019 | Reply to a communication from the examining division | 10.10.2019 | Observations by third parties | 31.10.2019 | Despatch of a communication from the examining division (Time limit: M04) | 21.02.2020 | Reply to a communication from the examining division | 13.05.2020 | Despatch of a communication from the examining division (Time limit: M04) | 08.09.2020 | Reply to a communication from the examining division | 02.12.2020 | Communication of intention to grant the patent | 07.04.2021 | Fee for grant paid | 07.04.2021 | Fee for publishing/printing paid | 07.04.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 22.02.2022 | No opposition filed within time limit [2022/17] | Fees paid | Renewal fee | 25.09.2019 | Renewal fee patent year 03 | 22.09.2020 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 22.09.2017 | AL | 19.05.2021 | CY | 19.05.2021 | CZ | 19.05.2021 | DK | 19.05.2021 | EE | 19.05.2021 | ES | 19.05.2021 | FI | 19.05.2021 | HR | 19.05.2021 | LT | 19.05.2021 | LV | 19.05.2021 | MC | 19.05.2021 | MK | 19.05.2021 | RO | 19.05.2021 | RS | 19.05.2021 | SE | 19.05.2021 | SI | 19.05.2021 | SK | 19.05.2021 | SM | 19.05.2021 | BG | 19.08.2021 | NO | 19.08.2021 | GR | 20.08.2021 | IS | 19.09.2021 | PT | 20.09.2021 | GB | 22.09.2021 | IE | 22.09.2021 | LU | 22.09.2021 | BE | 30.09.2021 | CH | 30.09.2021 | FR | 30.09.2021 | LI | 30.09.2021 | [2024/22] |
Former [2023/30] | HU | 22.09.2017 | |
AL | 19.05.2021 | ||
CY | 19.05.2021 | ||
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SI | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
GB | 22.09.2021 | ||
IE | 22.09.2021 | ||
LU | 22.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
FR | 30.09.2021 | ||
LI | 30.09.2021 | ||
Former [2023/29] | HU | 22.09.2017 | |
AL | 19.05.2021 | ||
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SI | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
GB | 22.09.2021 | ||
IE | 22.09.2021 | ||
LU | 22.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
FR | 30.09.2021 | ||
LI | 30.09.2021 | ||
Former [2022/37] | AL | 19.05.2021 | |
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SI | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
GB | 22.09.2021 | ||
IE | 22.09.2021 | ||
LU | 22.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
FR | 30.09.2021 | ||
LI | 30.09.2021 | ||
Former [2022/35] | AL | 19.05.2021 | |
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SI | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
GB | 22.09.2021 | ||
IE | 22.09.2021 | ||
LU | 22.09.2021 | ||
BE | 30.09.2021 | ||
FR | 30.09.2021 | ||
Former [2022/34] | AL | 19.05.2021 | |
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SI | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
LU | 22.09.2021 | ||
BE | 30.09.2021 | ||
FR | 30.09.2021 | ||
Former [2022/29] | AL | 19.05.2021 | |
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SI | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2022/25] | AL | 19.05.2021 | |
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2022/23] | CZ | 19.05.2021 | |
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2022/10] | CZ | 19.05.2021 | |
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
PT | 20.09.2021 | ||
IS | 22.12.2021 | ||
Former [2022/09] | CZ | 19.05.2021 | |
DK | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2022/08] | CZ | 19.05.2021 | |
DK | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2022/07] | FI | 19.05.2021 | |
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2021/51] | FI | 19.05.2021 | |
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2021/50] | FI | 19.05.2021 | |
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
SE | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
PT | 20.09.2021 | ||
Former [2021/49] | FI | 19.05.2021 | |
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
SE | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
Former [2021/47] | FI | 19.05.2021 | |
LT | 19.05.2021 | ||
BG | 19.08.2021 | ||
Former [2021/46] | FI | 19.05.2021 | |
LT | 19.05.2021 | Documents cited: | Search | [XI]EP2220950 (HAUNI MASCHINENBAU AG [DE]) [X] 1-3,5,6 * paragraph [0025] - paragraph [0028] * * paragraphs [0031] , [ 0034]; figures 3-6 * [I] 4,7-10; | [XAI]US2006237336 (SPATAFORA MARIO [IT]) [X] 1-3,5,6 * paragraph [0022] - paragraph [0025] * * paragraphs [0028] , [ 0030] , [ 0037]; figures 1-5 * [A] 4,7,9,10 [I] 8; | [XAI]DE102005034246 (HAUNI MASCHINENBAU AG [DE]) [X] 1-3,5 * paragraph [0021] - paragraph [0023] * * paragraph [0028]; figure -- * [A] 4,6,7,9,10 [I] 8; | [XA]GB2271922 (KOERBER AG [DE]) [X] 1 * page 4, paragraph 3 - page 6, paragraph 3; figure 1 * [A] 2-10; | [A]GB2097353 (HAUNI WERKE KOERBER & CO KG) [A] 1-10 * page 4, line 86 - line 106; figure 1 * | Examination | GB1407458 | DE3512521 |