blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3311638

EP3311638 - FARMING MACHINE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  07.10.2022
Database last updated on 15.06.2024
FormerThe patent has been granted
Status updated on  29.10.2021
FormerGrant of patent is intended
Status updated on  06.07.2021
FormerExamination is in progress
Status updated on  23.06.2020
FormerRequest for examination was made
Status updated on  19.10.2018
FormerThe application has been published
Status updated on  23.03.2018
Most recent event   Tooltip31.05.2024Lapse of the patent in a contracting state
New state(s): MK
published on 03.07.2024 [2024/27]
Applicant(s)For all designated states
Eurosystems S.p.A.
8, Via G. Pastore
42045 Luzzara (Reggio Emilia) / IT
[2018/17]
Inventor(s)01 / BOVI, Fabio
30, Via G. Marconi
42045 LUZZARA (RE) / IT
 [2018/17]
Representative(s)Corradini, Corrado, et al
Ing. C. Corradini & C. S.r.l. Via Dante Alighieri 4
42121 Reggio Emilia / IT
[2018/17]
Application number, filing date17195618.810.10.2017
[2018/17]
Priority number, dateIT2016010578420.10.2016         Original published format: IT201600105784
[2018/17]
Filing languageIT
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3311638
Date:25.04.2018
Language:EN
[2018/17]
Type: B1 Patent specification 
No.:EP3311638
Date:01.12.2021
Language:EN
[2021/48]
Search report(s)(Supplementary) European search report - dispatched on:EP16.03.2018
ClassificationIPC:A01B33/02, A01D34/68
[2018/17]
CPC:
A01B33/028 (EP); A01D34/6806 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/47]
Former [2018/17]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:LANDWIRTSCHAFTLICHE MASCHINE[2018/17]
English:FARMING MACHINE[2018/17]
French:MACHINE AGRICOLE[2018/17]
Examination procedure10.10.2018Amendment by applicant (claims and/or description)
10.10.2018Examination requested  [2018/47]
10.10.2018Date on which the examining division has become responsible
26.06.2020Despatch of a communication from the examining division (Time limit: M04)
12.10.2020Reply to a communication from the examining division
09.11.2020Despatch of a communication from the examining division (Time limit: M04)
25.02.2021Reply to a communication from the examining division
07.07.2021Communication of intention to grant the patent
25.10.2021Fee for grant paid
25.10.2021Fee for publishing/printing paid
25.10.2021Receipt of the translation of the claim(s)
Opposition(s)02.09.2022No opposition filed within time limit [2022/45]
Fees paidRenewal fee
31.07.2019Renewal fee patent year 03
31.07.2020Renewal fee patent year 04
25.08.2021Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU10.10.2017
AL01.12.2021
AT01.12.2021
CY01.12.2021
CZ01.12.2021
DK01.12.2021
EE01.12.2021
ES01.12.2021
FI01.12.2021
HR01.12.2021
LT01.12.2021
LV01.12.2021
MC01.12.2021
MK01.12.2021
NL01.12.2021
PL01.12.2021
RO01.12.2021
RS01.12.2021
SE01.12.2021
SI01.12.2021
SK01.12.2021
SM01.12.2021
BG01.03.2022
NO01.03.2022
GR02.03.2022
IS01.04.2022
PT01.04.2022
[2024/27]
Former [2024/21]HU10.10.2017
AL01.12.2021
AT01.12.2021
CY01.12.2021
CZ01.12.2021
DK01.12.2021
EE01.12.2021
ES01.12.2021
FI01.12.2021
HR01.12.2021
LT01.12.2021
LV01.12.2021
MC01.12.2021
NL01.12.2021
PL01.12.2021
RO01.12.2021
RS01.12.2021
SE01.12.2021
SI01.12.2021
SK01.12.2021
SM01.12.2021
BG01.03.2022
NO01.03.2022
GR02.03.2022
IS01.04.2022
PT01.04.2022
Former [2024/18]HU10.10.2017
AL01.12.2021
AT01.12.2021
CZ01.12.2021
DK01.12.2021
EE01.12.2021
ES01.12.2021
FI01.12.2021
HR01.12.2021
LT01.12.2021
LV01.12.2021
MC01.12.2021
NL01.12.2021
PL01.12.2021
RO01.12.2021
RS01.12.2021
SE01.12.2021
SI01.12.2021
SK01.12.2021
SM01.12.2021
BG01.03.2022
NO01.03.2022
GR02.03.2022
IS01.04.2022
PT01.04.2022
Former [2023/25]AL01.12.2021
AT01.12.2021
CZ01.12.2021
DK01.12.2021
EE01.12.2021
ES01.12.2021
FI01.12.2021
HR01.12.2021
LT01.12.2021
LV01.12.2021
MC01.12.2021
NL01.12.2021
PL01.12.2021
RO01.12.2021
RS01.12.2021
SE01.12.2021
SI01.12.2021
SK01.12.2021
SM01.12.2021
BG01.03.2022
NO01.03.2022
GR02.03.2022
IS01.04.2022
PT01.04.2022
Former [2023/01]AL01.12.2021
AT01.12.2021
CZ01.12.2021
DK01.12.2021
EE01.12.2021
ES01.12.2021
FI01.12.2021
HR01.12.2021
LT01.12.2021
LV01.12.2021
NL01.12.2021
PL01.12.2021
RO01.12.2021
RS01.12.2021
SE01.12.2021
SI01.12.2021
SK01.12.2021
SM01.12.2021
BG01.03.2022
NO01.03.2022
GR02.03.2022
IS01.04.2022
PT01.04.2022
Former [2022/49]AL01.12.2021
AT01.12.2021
CZ01.12.2021
DK01.12.2021
EE01.12.2021
ES01.12.2021
FI01.12.2021
HR01.12.2021
LT01.12.2021
LV01.12.2021
NL01.12.2021
PL01.12.2021
RO01.12.2021
RS01.12.2021
SE01.12.2021
SK01.12.2021
SM01.12.2021
BG01.03.2022
NO01.03.2022
GR02.03.2022
IS01.04.2022
PT01.04.2022
Former [2022/46]AT01.12.2021
CZ01.12.2021
DK01.12.2021
EE01.12.2021
ES01.12.2021
FI01.12.2021
HR01.12.2021
LT01.12.2021
LV01.12.2021
NL01.12.2021
PL01.12.2021
RO01.12.2021
RS01.12.2021
SE01.12.2021
SK01.12.2021
SM01.12.2021
BG01.03.2022
NO01.03.2022
GR02.03.2022
IS01.04.2022
PT01.04.2022
Former [2022/42]AT01.12.2021
CZ01.12.2021
EE01.12.2021
ES01.12.2021
FI01.12.2021
HR01.12.2021
LT01.12.2021
LV01.12.2021
NL01.12.2021
PL01.12.2021
RO01.12.2021
RS01.12.2021
SE01.12.2021
SK01.12.2021
SM01.12.2021
BG01.03.2022
NO01.03.2022
GR02.03.2022
IS01.04.2022
PT01.04.2022
Former [2022/35]AT01.12.2021
CZ01.12.2021
EE01.12.2021
ES01.12.2021
FI01.12.2021
HR01.12.2021
LT01.12.2021
LV01.12.2021
NL01.12.2021
PL01.12.2021
RO01.12.2021
RS01.12.2021
SE01.12.2021
SK01.12.2021
SM01.12.2021
BG01.03.2022
NO01.03.2022
GR02.03.2022
PT01.04.2022
Former [2022/34]AT01.12.2021
EE01.12.2021
ES01.12.2021
FI01.12.2021
HR01.12.2021
LT01.12.2021
LV01.12.2021
NL01.12.2021
PL01.12.2021
RO01.12.2021
RS01.12.2021
SE01.12.2021
SM01.12.2021
BG01.03.2022
NO01.03.2022
GR02.03.2022
PT01.04.2022
Former [2022/33]AT01.12.2021
ES01.12.2021
FI01.12.2021
HR01.12.2021
LT01.12.2021
LV01.12.2021
NL01.12.2021
PL01.12.2021
RS01.12.2021
SE01.12.2021
SM01.12.2021
BG01.03.2022
NO01.03.2022
GR02.03.2022
Former [2022/30]AT01.12.2021
ES01.12.2021
FI01.12.2021
HR01.12.2021
LT01.12.2021
LV01.12.2021
NL01.12.2021
PL01.12.2021
RS01.12.2021
SE01.12.2021
BG01.03.2022
NO01.03.2022
GR02.03.2022
Former [2022/25]AT01.12.2021
ES01.12.2021
FI01.12.2021
HR01.12.2021
LT01.12.2021
LV01.12.2021
PL01.12.2021
RS01.12.2021
SE01.12.2021
BG01.03.2022
NO01.03.2022
GR02.03.2022
Former [2022/24]AT01.12.2021
ES01.12.2021
FI01.12.2021
HR01.12.2021
LT01.12.2021
LV01.12.2021
PL01.12.2021
RS01.12.2021
SE01.12.2021
BG01.03.2022
GR02.03.2022
Former [2022/23]AT01.12.2021
ES01.12.2021
FI01.12.2021
HR01.12.2021
LT01.12.2021
LV01.12.2021
PL01.12.2021
RS01.12.2021
BG01.03.2022
Former [2022/22]AT01.12.2021
FI01.12.2021
LT01.12.2021
RS01.12.2021
BG01.03.2022
Former [2022/21]AT01.12.2021
RS01.12.2021
BG01.03.2022
Former [2022/19]BG01.03.2022
Documents cited:Search[A]FR2463042  (HONDA MOTOR CO LTD [JP]) [A] 1-9* page 3, line 28 - page 9, line 36; figures 1-9 *;
 [A]WO0209496  (HONDA MOTOR CO LTD [JP], et al) [A] 1-9 * page 5, line 4 - page 12, line 17; figures 1-5 *;
 [A]EP2100491  (BCS SPA [IT]) [A] 1-9 * paragraphs [0027] - [0066]; figures 1-6 *;
 [XI]DE202009014994U  (VIKING GMBH [AT]) [X] 1,2 * paragraphs [0027] - [0034]; figures 1,2 * [I] 3,10-14
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.